HomeMy WebLinkAbout2314 LAPORTE AVENUE REPLAT - PDP - 29-04 - SUBMITTAL DOCUMENTS - ROUND 3 - ROUTING SHEETProject: �Z�l L1\r C-,;� T�� �c Ve•� Date.•
Planner: � t'� Traffic Operations: Engineer:
i
Items Requested
Redlinedems Being Returned
a;
0
Other Items Required
6i
a
?
M 46
0
Other Items being
Returned
Engineering
Stormwater
Water/Wastewater FCLWD
Traffic Operations
_
Trans ortation Planning
Transfort
Engineering Pvmt.
Light & Power
Technical Services
PFA
TOTALS
I A-(v
)ther:
Note: All redlined items should be returned with the resubmittal/revisions. I'
call 221-6750 to schedule a resubmittal
appointment,
REVISION ROUTING SHEET- t4)ou� 3
ITEM:
DATF RECEIVED:
Z
22
Z Z
C
FILE: PROJECT PLANNER
x
ZONING
!
BUILDING INSPECTION
FORESTRY
POLICE - JOE GERDOM
ADVANCE PLANNING
STREETS
R.O.W. PLANNING
WATER CONSERVATION
POST OFFICE
W EST
XCELENERGY
SCHOOLS: POUDRE / TH MPSON
AT & T DIGITAL CABLE %vuc�rt
CDOT
DITCH COMPANY
RAILROAD: UP or BNSF
REA/DOE/PRPA
NATURAL RESOURCES
PARK PLANNING
'• - --�er!A7
TOTAL<�
LWA