Loading...
HomeMy WebLinkAboutWILLOW STREET LOFTS - FDP - 24-04A - SUBMITTAL DOCUMENTS - ROUND 1 - REVISIONSTopic:.Stormwater —water quality Number 80 --- Revised plan(s) per comment. Topic: Stormwater — parking lot drainage Number 112 --- Complied with. Department: Stormwater— Water — Wastewater Topic: Water/WW Number 100 --- The very small amount of irrigation water required will be provided by the residential units' water supply, not by a separate irrigation tap. Number 101 --- Information provided. Number 102 --- Revised plan(s) per comment. Number 103 --- Revised plan(s) per comment. Number 104 --- Revised plan(s) per comment. Number 105 --- Revised plan(s) per comment. Number 106 --- Revised plan(s) per comment. Number 107 --- Shall coordinate during final compliance. Department: Zoning Topic: Zoning Number 3 --- Revised plan(s) per comment. Number 4 --- Revised plan(s) per comment. Number 77 --- Revised plan(s) per comment. Sincerely, iirprout�y Enclosures Department: Natural Resources Topic: Air Quality Number 8 --- Shall comply with local, state and federal health standards prior to occupancy. Number 36 --- Shall comply with local, state and federal health standards for handling encountered contaminated materials. Number 37 --- Shall comply with. Topic: General Number 7 --- Shall comply with. Department: PFA Topic: Fire Number 95 --- Revised plan(s) per comment. Number 96 --- Revised plan(s) per comment. Number 97 --- Responded to and complied with. Number 98 --- Revised plan(s) per comment. Number 99 --- Revised plan(s) per comment. Department: Stormwater-Water-Wastewater Topic: Landscape Plan Number 108 --- Revised plan(s) per comment. Topic: Plat Number 84 --- Finalizing details of easements with City of Fort Collins Real Estate Services. Will forward when final documents are available. Topic: Stormwater-grading Number 78 --- Revised plan(s) per comment. Topic: Stormwater- maintenance Number 79 --- Finalizing details of maintenance agreement with City of Fort Collins Real Estate Services. Will forward when final document is available. Topic: Stormwater — utility plans Number 86 --- Revised plan(s) per comment. Topic: Architectural Elevations Number 88 --- Revised plan(s) per comment. Number 93 --- Revised plan(s) per comment. Topic: Landscape Plan Number 109 --- Revised plan(s) per comment. " Number 110 --- Revised plan(s) per comment. Number 111 --- Complied with. Topic: Lighting Plan Number 92 --- Revised plan(s) per comment. Department: Engineering Topic: General Number 83 --- Revised plan(s) per comment. Number 85 --- Revised plan(s) per comment. Number 94 --- Complied with. Number 113 --- Revised plan(s) per comment. Number 28 --- NA Number 56 --- Comcast and Qwest have agreed to relocated their existing cable lines to the landscape area south of the United Way parking lot. City of Fort Collins has agreed to grant an easement to Comcast and Qwest for same. Number 58 --- Copy of Easement and Road Maintenance Agreement from Bas Bleu Theatre is attached as well as a memo from Fort Collins Real Estate Services regarding the vacation of the alley and easements. Number 60 --- All required easements shall be -processed with a blanket easement. Department: Light & Power Topic: Electric Utility Number 75 --- High voltage power line and transformers have been relocated, as required. Number 76 --- Will coordinate with Light & Power. May 23, 2007 Anne Aspen City of Fort Collins Current Planning Department PO Box 580 Fort Collins, CO 80522 Re: Willow - Response to Comments ---- October 23, 2006 Dear Anne, Department: Current Plannin Topic: General Number 81 --- NA Number 82 --- Comcast has agreed to vacate existing alley way and relocate their cable to the City owned landscape area south of the United Way parking lot. City of Fort Collins has agreed to grant an easement to Comcast for same. Copy of Letter of Intent attached. Number 87 --- The City had a temporary need to maintain the sewer line in the alley during the initial construction of the Aztlan Center. That need no longer exists and both the Aztlan Construction Management and City of Fort Collins Water and Sewer Department have given us their approval to vacate the alley. Comcast and Qwest have both agreed to vacate the alley and relocate their cable and telephone lines in the City - owned landscape area south of United Way parking lot. The City has agreed to grant the easements necessary to Comcast and Qwest. The Real Estate Department is proceeding with the vacation of the alley. Number 114 --- New building elevations are being provided with this submittal Topic: Site Plan Number 89 --- Willow residences may access the mailbox area from the public sidewalk located between the residential units and the Aztlan Center. Number 90 --- The walkway between the buildings provides connection to the walkway, which provides access both to the entrances to the residential units as well as access to both the Willow and Pine Street sidewalks. Number 91 --- Revised plan(s) per comment. 3944 JFK Parkway, Ste. 12E, Fort Collins, CO 80525 • (970) 226-5000 • Fax (970) 226-5125