Loading...
HomeMy WebLinkAboutSERRANO TOWNHOMES - FDP - 41-04A - CORRESPONDENCE - (3)Department: Zoning Issue Contact: Gary Lopez Topic: Zoning Number: 65 Created: 9/27/2005 [9/27/051 Need dimensions on buildings. Also need to state the percentage amount of 125% on the letter of credit mentioned in planting note # 18. Be sure and return all red -lined plans if/when you re -submit. If you have any questions regarding these issues or any other issues related to this project, please feel free to call me at 221-6341. Yours Truly, Steve Olt City Planner cc: Marc Virata The Birdsall Group North Star Design Current Planning File #41-04A Page 4 A t ,I Topic: Stormwater Erosion Control Number: 74 Created: 9/30/2005 [9/30/051 1. The notes on plan sheet 2 for grading and erosion control are wrong. Please delete and replace with the correct set. 2. The silt fencing is not continuous at the northeast corner. Please correct. 3. What is protecting Boardwalk Drive from the pipeline extension on the north side of the project? 4. The table of contents is incorrect in its location of the erosion control portion of the report. Please correct. 5. Calculations indicate that straw mulch is to be utilized. Where? Place this on the plan. Department: Transportation Planning Issue Contact: David Averill Topic: General Number: 66 Created: 9/27/2005 [9/27/051 The Final Landscape plan and Utility Plans do not match with regards to the sidewalk on Boardwalk Drive. The note is correct on the Landscape Plan, but the drawing appears to be in correct. Please coordinate the two plan sets. Thanks. Department: Water Wastewater Issue Contact: Roger Buffington Topic: General Number: 70 Created: 9/28/2005 [9/28/051 It appears that the steps for Buildings D & F extend outside the building envelops and are less than 10 feet from the sewer. What is distance from sewer to face of steps/entrance stoop? Topic: Utility plans Number: 71 Created: 9/28/2005 [9/28/051 Revise note on water main to include polywrap. Number: 72 Created: 9/28/2005 [9/28/051 Move gate valve to on the west FH to the south side of the swivel tee. Number: 73 Created: 9/28/2005 [9/28/051 Encasement on the 12-inch storm to be continuous (not just joints). Include correct detail. Page 3 Topic: General Number: 11 Created: 11 / 16/2004 [9/27/051 Please move the Light & Power signature line from the Utility Providers block to the City Signature Block and add Comcast and Qwest to the Utility Providers block. These outside utility provides (Comcast, gwwest, Xcel Energy) will need to sign mylars before City signatures. [7/27/051 In general, either provide information from the dry utilities that the walls located within utility easements behind the right-of-way is acceptable, or have these dry utilities also sign off on the construction plan set. The retaining wall along Lemay Avenue may be of particular concern. I'd suggest individual follow-up or a utility coordination meeting with the utilities to ensure there are no issues. [ 11 / 16/041 The plans specify privacy walls which fall within the typical 15' utility easement along Lemay Avenue. The utility companies should be aware and okay this proposal. Number: 69 Created: 9/27/2005 [9/27/051 Coordinate the title of the project to be consistent between all plan sets. The plat is titled "Serrano Townhome" (remove PDP), the site and landscape plans are titled "Serrano" and the construction plan is titled "Serrano Townhomes". Topic: Plat Number: 68 Created: 9/27/2005 [9/27/051 Remove "PDP" from the name of the plat. Topic: Utility plans Number: 75 Created: 9/30/2005 [9/30/051 Please add LCUASS Drawing 1601 to the details sheet. Department: Light & Power Issue Contact: Doug Martine Topic: Light & Power Number: 63 Created: 9/21 /2005 [9/21 /05] No comments. Department: Stormwater Utility Issue Contact: Wes Lamarque Topic: Stormwater Number: 51 Created: 7/29/2005 [9/30/051 Details are OK. No detail is needed for the connection to the existing inlet. Although, notes are required to state that the existing inlet is to be core drilled (not hammered out) and that the connection is to be grouted. [7/29/051 Please provide details for the combo inlet and the core drill of existing type R inlet (grout required). Page 2 4�L�lSTAFF PROJECT REVIEW Cityof Fort Collins TYeadstone Development Date: 10/07/2005 c/o Steve Slezak P.O. Box 1978 Fort Collins, CO. 80522 Staff has reviewed your submittal for SERRANO TOWNHOMES - FINAL PLANS, and we offer the following comments: ISSUES: Department: Current Planning Issue Contact: Steve Olt Topic: General Number: 76 Created: 10/ 13/2005 [10/13/051 Just need to see some sort of elevation, with materials and colors, for the proposed wall along Lemay Avenue. Department: Engineering Issue Contact: Marc Virata Topic: Construction Plans Number: 46 Created: 7/27/2005 [9/23/051 The revised grading plan emailed on 9/23 as well as the grading plan submitted does not indicate proposed grading on the west side of the Lemay Avenue retaining wall. The construction plan needs to include a design for how the retaining wall is to be built. Please provide a note indicating that the wall is to be a consistent 6' in height along the street side of Lemay for clarification. [7/27/051 The retaining wall/screen wall shown along Lemay Avenue on the grading plan needs to be engineered by a structural engineer and meet City requirements as it potentially affects the sidewalk along Lemay Avenue. Please provide more information on the grading plan regarding the limits of where the wall acts as a retaining wall. In addition, show more detail along the wall (additional Section B information along the wall). Number: 47 Created: 7/27/2005 [9/23/051 Carried over as unresolved. [7/27/051 Structural calculations will be required for submittal for the retaining wall along Lemay Avenue. Page 1