Number: 65 Created: 9/27/2005
[9/27/051 Need dimensions on buildings. Also need to state the percentage
amount of 125% on the letter of credit mentioned in planting note # 18.
Be sure and return all red -lined plans if/when you re -submit.
If you have any questions regarding these issues or any other issues related
to this project, please feel free to call me at 221-6341.
Yours
Truly,
Steve Olt
City Planner
cc: Marc Virata
The Birdsall Group
North Star Design
Current Planning File #41-04A
Page 4
A t ,I
Topic: Stormwater Erosion Control
Number: 74 Created: 9/30/2005
[9/30/051
1. The notes on plan sheet 2 for grading and erosion control are wrong.
Please delete and replace with the correct set.
2. The silt fencing is not continuous at the northeast corner. Please
correct.
3. What is protecting Boardwalk Drive from the pipeline extension on the
north side of the project?
4. The table of contents is incorrect in its location of the erosion control
portion of the report. Please correct.
5. Calculations indicate that straw mulch is to be utilized. Where? Place
this on the plan.
Department: Transportation Planning Issue Contact: David Averill
Topic: General
Number: 66 Created: 9/27/2005
[9/27/051 The Final Landscape plan and Utility Plans do not match with
regards to the sidewalk on Boardwalk Drive. The note is correct on the
Landscape Plan, but the drawing appears to be in correct. Please
coordinate the two plan sets. Thanks.
Department: Water Wastewater Issue Contact: Roger
Buffington
Topic: General
Number: 70 Created: 9/28/2005
[9/28/051 It appears that the steps for Buildings D & F extend outside the
building envelops and are less than 10 feet from the sewer. What is
distance from sewer to face of steps/entrance stoop?
Topic: Utility plans
Number: 71 Created: 9/28/2005
[9/28/051 Revise note on water main to include polywrap.
Number: 72 Created: 9/28/2005
[9/28/051 Move gate valve to on the west FH to the south side of the swivel
tee.
Number: 73 Created: 9/28/2005
[9/28/051 Encasement on the 12-inch storm to be continuous (not just
joints). Include correct detail.
Page 3
Topic: General
Number: 11 Created: 11 / 16/2004
[9/27/051 Please move the Light & Power signature line from the Utility
Providers block to the City Signature Block and add Comcast and Qwest to
the Utility Providers block. These outside utility provides (Comcast, gwwest,
Xcel Energy) will need to sign mylars before City signatures.
[7/27/051 In general, either provide information from the dry utilities that
the walls located within utility easements behind the right-of-way is
acceptable, or have these dry utilities also sign off on the construction plan
set. The retaining wall along Lemay Avenue may be of particular concern.
I'd suggest individual follow-up or a utility coordination meeting with the
utilities to ensure there are no issues.
[ 11 / 16/041 The plans specify privacy walls which fall within the typical 15'
utility easement along Lemay Avenue. The utility companies should be
aware and okay this proposal.
Number: 69 Created: 9/27/2005
[9/27/051 Coordinate the title of the project to be consistent between all
plan sets. The plat is titled "Serrano Townhome" (remove PDP), the site and
landscape plans are titled "Serrano" and the construction plan is titled
"Serrano Townhomes".
Topic: Plat
Number: 68 Created: 9/27/2005
[9/27/051 Remove "PDP" from the name of the plat.
Topic: Utility plans
Number: 75 Created: 9/30/2005
[9/30/051 Please add LCUASS Drawing 1601 to the details sheet.
Department: Light & Power Issue Contact: Doug Martine
Topic: Light & Power
Number: 63 Created: 9/21 /2005
[9/21 /05] No comments.
Department: Stormwater Utility Issue Contact: Wes Lamarque
Topic: Stormwater
Number: 51 Created: 7/29/2005
[9/30/051 Details are OK. No detail is needed for the connection to the
existing inlet. Although, notes are required to state that the existing inlet is
to be core drilled (not hammered out) and that the connection is to be
grouted.
[7/29/051 Please provide details for the combo inlet and the core drill of
existing type R inlet (grout required).
Page 2
4�L�lSTAFF PROJECT REVIEW
Cityof Fort Collins
TYeadstone Development Date: 10/07/2005
c/o Steve Slezak
P.O. Box 1978
Fort Collins, CO. 80522
Staff has reviewed your submittal for SERRANO TOWNHOMES - FINAL
PLANS, and we offer the following comments:
ISSUES:
Department: Current Planning Issue Contact: Steve Olt
Topic: General
Number: 76 Created: 10/ 13/2005
[10/13/051 Just need to see some sort of elevation, with materials and
colors, for the proposed wall along Lemay Avenue.
Department: Engineering Issue Contact: Marc Virata
Topic: Construction Plans
Number: 46 Created: 7/27/2005
[9/23/051 The revised grading plan emailed on 9/23 as well as the grading
plan submitted does not indicate proposed grading on the west side of the
Lemay Avenue retaining wall. The construction plan needs to include a
design for how the retaining wall is to be built. Please provide a note
indicating that the wall is to be a consistent 6' in height along the street side
of Lemay for clarification.
[7/27/051 The retaining wall/screen wall shown along Lemay Avenue on
the grading plan needs to be engineered by a structural engineer and meet
City requirements as it potentially affects the sidewalk along Lemay Avenue.
Please provide more information on the grading plan regarding the limits of
where the wall acts as a retaining wall. In addition, show more detail along
the wall (additional Section B information along the wall).
Number: 47 Created: 7/27/2005
[9/23/051 Carried over as unresolved.
[7/27/051 Structural calculations will be required for submittal for the
retaining wall along Lemay Avenue.