Loading...
HomeMy WebLinkAboutSERRANO TOWNHOMES - PDP - 41-04 - CORRESPONDENCE - (3)AINSHEL CORPORATION Februaryl1, 2005 Steve Olt City of Ft. Collins P.O. Box 580 Ft. Collins, CO 80522 Re: Serrano Townhomes- #41-04 Dear Mr. Olt: RECEIVED F E B P 2005 CURRENT PLANNING I was disturbed by your phone call last Thursday, February P. The issues that were cited have been addressed in previous discussions and are our drawings clearly meet or exceed the 50% test pending Final Compliance Issues being advanced by Marc Virata, Number 21 & Number 37, are clearly delineated as items to be resolved at time of final compliance drawings and have no bearing on an approval hearing. In the staff meeting of November 22, 2004 Senior Planner, Ted Shepard asked Mr. Virata if the design met the code and the response was affirmative. Comment number 37 clearly states, that concern has... "been removed for the time being." For the record, our drawings indicate five (5) "off street" parking spaces while there is ample room for an additional twelve (12) spaces "on street" direcily along the Boardwalk frontage of this project. Understanding the intent of the code we believe we have met and have indeed exceeded guest parking requirements and respectfully request Mr. Virata to remove his expectations for a re -submittal. It is our belief that all storm water issues have been resolved and that information has been communicated to our consultants that we were... "ready for a hearing." Following our meeting of November 22, 2004 our team met with Glen Schlueter and Basil Hamden and formulated a plan to verify both the detention issue and the water quality issue. Engineering documentation was submitted in a meeting December 13, 2004 and has been discussed with Bob Barkeen on 12/16/04 and 12/17/04. Water quality issues are being discussed through Kevin with Storm Water as an agreement has been negotiated with the Lodge HOA regarding pond maintenance. This issue should not delay our Type I hearing. In the staff meeting of 11/22/04 Mr. Shepard stated..."we are ready for hearing..." pending resolution of storm water issues. A re -submittal would unfairly delay this project weeks if not months. It is our sincere desire that this project be scheduled for hearing as soon as possible. I look forviard to your response. Sincere_1 j` -!= fie' hen.S ezak p l �. PO Box 1978 • FORT COLLINS, COLORADO 80522 • 970.484.5907 • FAX: 970.490.2838