HomeMy WebLinkAboutSERRANO TOWNHOMES - PDP - 41-04 - CORRESPONDENCE - REVISIONSmethod of mitigation to ensure that pedestrians have the crossing priority mentioned in the LUC section 3.2.2C(1). Please provide more detail of what your intentions or thoughts are on this issue. Thanks. RESPONSE: We will address this issue with our Final Development Plans. Number 24 Created: 11/1712004 [11/17104] I'd like to reiterate Engineering Staffs comments regarding the amount of parking provided with this proposal (#18). Granted, the applicant is meeting the minimums, but we have had recent instances where the minimum requirements prove to be inadequate. This is something worth thinking about on the part of the applicant, as it will impact the residents and also has the potential to hinder emergency access if indeed visitors and or residents are forced to park on the private drive. RESPONSE: We have added the requested note to the attached site plan and have added a parking summary to the Land Use Breakdown on the site plan which summarizes the required and provided parking spaces. Further detail shall be added to the Final Development Plan addressing requirements of PFA and emergency services emergency access. Number., Created: 11/1712004 [11/17104] No comments on behalf of Transfort. Department: Water Wastewater Issue Contact: Jeff Hill Topic: General Number 30 Created: 1111812004 [11/18104] Show all gas and electric lines on the overall utility plans. Perhaps a utility coordination meeting is needed for this development. RESPONSE: We agree that a utility coordination meeting will be a good idea for this project. We prefer to attend a utility coordination meeting after our Type 1 hearing. Number 31 Created. 1111812004 [11/18104] No permanent structures are allowed with in the utility easement (i.e. Retaining walls, trash enclosures, Privacy walls, etc.). RESPONSE: We will coordinate the design of the privacy walls which fall within the typical 15' utility easement with the utility companies. Number 32 Created: 1111812004 [11/181041 Use or abandon all existing water and sewer services at the mains. Clearly define all abandonment procedures. RESPONSE: We will address this issue with our Final Development Plans. Number.' 35 Created. 1111812004 [11/18104] Pothole existing 16-inch water main in Boardwalk at the proposed 8-inch sanitary sewer crossing to confirm no conflicts will RESPONSE: We will address this issue with our Final Deveiopment Plans. Number.' 36 Created: 1111812004 [11118104] Show all water and sewer lines on the landscape plans and maintain the required landscape/utility separation distances. See site, landscape and utility plans for other comments. RESPONSE: We wiii show the requested information on our Final Deveiopment Plans. n., _ . Miramont's acceptance of our water quality extended detention and modifications of than outlet structure shall be provided as soon as it is obtained. Number. 33 Created: 1111812004 [11/18104] The storm sewers that run along the perimeter of the site are underneath landscaping, including large trees. 10 foot separation is normally a requirement and would be ideal. in this case, effort should be made to provide as much separation as possible due to the physical constraints of the site. RESPONSE: Acknowledged. Also note that this will be a private storm sewer and, while we will strive to meet the separation requirements, understand that it will be owned and maintained by the HOA and they will have to accept any substandard areas. Number 34 Created: 1111812004 [11118104] At next submittal, additional comments may arise once additional information is presented. Department: Transportation Planning Issue Contact: David Averill Topic: Transportation Number: 13 Created: 1111612004 [11/16104] As mentioned at the Conceptual Review for this project, this parcel's frontage along Boardwalk needs to be brought up to the current LCUASS, including a 5' detached sidewalk along its entirety (Collector standard). The sidewalk that is on -site at this time was solely intended to be an interim "Safe Route to School" facility and was constructed "as -is" due to several constraints at the time of construction. The available ROW (or lack thereof) is what drove the design of the current sidewalk and explains why it is in its current non- standard configuration of a 5' attached walk at the eastern half of the property that transitions to a 4' detached walk on the western part of the property. Widening the attached portion of the walk would normally be an option, but this would result in a 9' wide sidewalk on the eastern portion of the parcel that transitions to a 4' detached walk to the west. This is not an acceptable or desirable design in this area, and would do nothing to solve the narrow, substandard width of the sidewalk on the western portion of the parcel. In effect, widening the attached portion of the walk would be another "band -aid" approach to solving this existing issue of a sub -standard facility yet it still would not solve the problem entirely. Please revise the plans accordingly. RESPONSE: As we have discussed at previous meetings it is our position that this property has already contributed to the improvements along Boardwalk Drive and should not be required to make further improvements to the sidewalk. We acknowledge that this issue is un-resolved and we are pursuing a clear resolution to this issue. We have requested assistance from the City to help resolve the issue and expect that we will have a clear resolution prior to submission of Final Development Plans. Number:14 Created.1111612004 [11116104] How does a person reach the entrance to Unit 3 of Building A on a connecting walkway? RESPONSE: We will address this issue with our Final Development Plans. Number. 16 Created:1111612004 [11116104] The site and utility plans read as if there are numerous walkway crossings of drive aisles throughout the site. Some sort of treatment is essential at these locations. Does the applicant propose striping, raised crosswalks, breaks in pavement, or some other Poudre Fire Authority requires a "Knox Box" to be mounted on the front of every new building equipped with a required fire sprinkler system or fire alarm system. 1997 UFC 902.4; PFA POLICY 88-20 RESPONSE: We will address this issue with our Final Development Plans. Number 8 Created: 1111512004 [11/15104] FIRE LINE REQUIREMENT. Buildings that are required to be fire sprinklered shall have a minimum 6-inch fire line unless hydraulic calculations can support a smaller fire line. NSE We will address this issue with our Final Development Plars. Topic: Transportation Number 29 Created. 1111712004 [11/17104] Buildings three stories or more in height must have access to a 30 foot unobstructed access roadway on at least (1) one side for aerial operations. PFA Policy 85-5 (B) RESPONSE: None of the proposed buildings shall be three stories in height. Department: Police Issue Contact: Joseph Gerdom Topic: General Number 23 Created: 1111612004 [11116104] Lighting/Landscape: LUC requires min of 1.Ofc in parking lots/drives. Also, 0.5fc forpathways (between buildings and along south side of property). Avoid plant materials in front of ground floor windows that would obscure surveillance (c. baileyi, cotoneaster) and provide potential break-in opportunities. Hostile plant materials would be better selection. Also, evaluate tree and light fixture locations - appears that some lights would be buried in mature tree canopy. RESPONSE: We will address this issue with our Final Development Plans. Department: Stormwater Utility Issue Contact: Wes Lamarque Topic: Stormwater Number 10 Created: 1111612004 2114105 In concept this issue is resolved for the 50% submittal so the project can go to hearing and the details will be worked out in the final complicance submittal. A letter of intent is still required to use the downstream pond and retrofit the outlet works. This is needed in order to schedule a hearing. RESPONSE: A document signifying the Lodge at Miramont's acceptance of our water and modifications shall be provided as soon as it is obtained. [11/16104] The development requires on -site quantity detention, including water quality, for the 100-year storm with a 2-year historic release rate as per conceptual review comments. If an analysis can show that the quantity detention is already being provided in the Lodge at Miramont pond, than that will be accepted. Water quality mitigation for the site would still have to be provided, either on -site or in the off -site pond, if quantity detention were to be provided there. If the Lodge at Miramont pond were to provide water quality mitigation for the site, the pond will have to be retrofitted to provide water quality for the entire area draining to it. RESPONSE: It has been sufficiently proven that the Lodge at Miramont pona was sized to accommodate developed runoff from the Serrano site. A document signifying the Lodge at n--- c [111151041 REQUIRED ACCESS: A fire lane is required. The fire lane shall be visible by painting and signage, and maintained unobstructed. 1997 UFC 901.2.2.1; 901.3; 901.4.2; 902.2.1, FCLUC The criteria for a required fire lane contain several conditions that must be met. 1. The minimum width shall be 20 feet. 2. Inside turning radius shall be 25 feet and outside turning radius shall be 50 feet. 3. Compacted road base shall be used during the construction phase only. The permanent fire lane shall consist of asphalt or concrete and shall be required to support 40 tons 4. The fire lane shall be platted as an "Emergency Access Easement" on the final plat. RESPONSE: Acknowledged. Any outstanding issues with fire will be addressed on our Final Development Plans. Number- 4 Created: 1111512004 [111151041 PREMISES IDENTIFICATION: Approved numerals or addresses shall be provided for all new and existing building in such a position as to be plainly visible and legible from the street or road fronting the property. 1997 UFC 901.4.4 A. In Multi -story buildings the following requirements shall pertain. 1. The first floor units shall be designated with 100's. 2. The second floor units with 200's 3. The third floor units with 300's. and so forth. B. All brass letters and numerals shall be posted on a black background. C. Some multi -family layouts may require address postings from the back side as well as the front of the buildings. D. A counterclockwise addressing pattern shall be maintained when ever possible. E. An addressing scheme shall be submitted to the fire department for approval prior to being posted on the building. RESPONSE: We wili address these issues with our Final Development Plans. Number.' 5 Created: 1111512004 [11/151041 WATER SUPPLY: Commercial No commercial building can be greater then 300 feet from a fire hydrant. Fire hydrants are required with a maximum spacing of 600 feet along an approved roadway. Each hydrant must be capable of delivering 1500 gallons of water per minute at a residual pressure of 20 psi. 1997 UFC 901.2.2.2 RESPONSE: We meet these requirements. Number.' 6 Created: 1111512004 [11/15104] SPRINKLER REQUIREMENTS: These proposed buildings shall be fire sprinklered. NOTE: When any portion of the facility or any portion of an exterior wall of the first story of the building is located more then 150 feet from fire apparatus access as measured by an approved route around the exterior of the building or facility it shall be fire sprinklered. 1997 UFC 902.2.1 RESPONSE: We will address this issue with our Final Development Plans. Number 7 Created: 1111512004 [11115104] KNOX BOX: [11/19104] Comments made at staff review regarding an apparent lack of visitor and overflow parking have been removed for the time being. Please clarify/revise the site and construction plan set to show that residents and visitors can utilize the driveway area in front of the garages for parking spaces and that these areas used as parking spaces will not interfere with the area PFA and emergency services need for emergency access. In addition, based on the information provided at the staff review, please add notes on the site plan that coincide with the HOA information presented (residents are limited to two cars, residents are to park on driveways in front of the garage outside of the private drive aisles, no parking is allowed along the private drive, etc.) RESPONSE: We have added the requested note to the attached site plan and have added a parking summary to the Land Use Breakdown on the site plan which summarizes the required and provided parking spaces. Further detail shall be added to the Final Development Plan addressing requirements of PFA and emergency services emergency access. Number 38 Created: 1111912004 [11119104] Technical Services has offered the following comments: 1. Boundary & legal close 2. Relabel the building envelope letters on the plat to be consistent with the site plan (which will be addressed as such). 3. Pen width to text ratio needs to be modified to show text more clearly. 4. Please show right-of-way width on Boardwalk Drive. 5. How was Lemay dedicated? RESPONSE: We will address these issues with our Final Development Plans. Department: Light & Power Issue Contact: Doug Martine Topic: Landscape plan Number: 1 Created: 111812004 [1118104] There is an existing streetlight on the W side of Lemay, approximately 190 ft. south of Boardwalk. This light is identified on the utility plan. The light also must be shown on the landscape plan and all new street tree locations must be adjusted to provide 40 ft. clearance between the light and tree(s). Clearance may be reduced to 15 ft. if the tree is an ornamental type. RESPONSE: We will address these issues with our Final Development Plans. Topic: Light & Power Number. 2 Created: 111812004 [1118104] The developer will need to coordinate locations of electric utility facilities including meter locations with Light & Power Engineering. Each unit must be individually metered, and the meters will need to be 'ganged' together on each building. Contact Light & Power at 221-6700. RESPONSE: We will address this issue with our Final Development Plans. Department: PFA Issue Contact: Michael Chavez Topic: General Number 3 Created:1111512004 drainage across the sidewalk is being exceeded (no more than 750 square feet of area behind the walk). RESPONSE: It is our intent to collect on site runoff and roof runoff into a private storm drain within the site and pipe all runoff under Boardwalk to the pond north of Boardwalk. This will be clearly shown on the final plans. Number 15 Created: 1111612004 [11/16104] The existing sidewalk along Boardwalk Drive was apparently constructed as part of a Safe Route to School project and was not contributed to by the land owner at the time. As such, with both the attached and detached portions of sidewalk not meeting LCUASS standards, the sidewalk along Boardwalk needs to be amended. The detached portion of existing sidewalk will need to be removed and replaced in accordance with sidewalk and parkway standards for a collector street (5' detached sidewalk and 8' parkway). The existing attached sidewalk may not have to be removed, provided the sidewalk is widened by the same existing amount (5) and Transportation Planning agrees. Additional right-of-way or access easement may need to be dedicated to encompass the sidewalk placement. RESPONSE: As we have discussed at previous meetings it is our position that this property has already contributed to the improvements along Boardwalk Drive and should not be required to make further improvements to the sidewalk. We acknowledge that this issue is un-resolved and we are pursuing a clear resolution to this issue. We have requested assistance from the City to help resolve the issue and expect that we will have a clear resolution prior to submission of Final Development Plans. Number.' 17 Created: 1111612004 [11/16104] The 20' private drive will need to be dedicated as an emergency access easement on the plat (Tract A). As PFA needs 20, the HOA will need to ensure that residents and visitors do not park along this private drive. RESPONSE: We will dedicate the emergency access easement on the final plat and address the parking issue with our Final Development Plans. Number- 21 Created: 1111612004 [11116104] There appears to be not enough private drive width for the two spaces at the turn for the private drive. 22' of width is required in front of the parking spaces. RESPONSE: We have modified the attached site plan to provide for 22' of width in front of the parking spaces. Number.- 22 Created: 1111612004 [11/16104] The soils report mentions the use of perimeter drains around the foundations of the buildings. The construction plans will need to indicate how and where these perimeter drains will lead to. If they are tied into the storm drainage system, that's fine with Engineering (pending Stormwater approval) but groundwater cannot be directed onto a public street and/or across a sidewalk. RESPONSE: It is intended that a perimeter drain be installed around each building and tied into the storm drain shown on the plans. This will be clearly shown on the final plans. Number.- 37 Created: 1111912004 To: City of Fort Collins From: Serrano Townhomes Treadstone Development Steve Slezak 484-5907 We offer the following responses to the City of Fort Collins Staff Comments dated 2-17-2005 Our responses are shown in red. ISSUES: Department: Current Planning issue Contact: Bob Barkeen Topic: Transportation Number:26 Created: 11/1712004 [11/17104] Details of the patio walls and privacy walls will need to be included on the site plan (height, elevations) RESPONSE: Details of the proposed patio and privacy walls will be included with the Final Development Plan Number 27 Created: 1111712004 [11/17104] Be sure all exterior lighting is glare shielded. RESPONSE: All exterior lighting shall be glare shielded. Number.28 Created: 1111712004 [11/17104] Parking counts based on number of bedrooms will need to be included on the site plan. The number of units will also need to be included. RESPONSE: Required parking counts based on number of bedrooms has been included on the attached site plan. Proposed parking counts have also been included on the attached site plan. The number of units has also been included on the attached site plan. Department: Engineering Issue Contact: Marc Virata Topic: General Number 9 Created: 1111612004 [11116104] A utility coordination meeting is suggested to discuss the placement of utility lines and connections to the units. I can set this meeting up if desired. RESPONSE: We agree that a utility coordination meeting will be a good idea for this project. We prefer to attend a utility coordination meeting after our Type 1 hearing. Number. 11 Created: 1111612004 [11/161041 The plans specify privacy walls which fall within the typical 15' utility easement along Lemay. The utility companies should be aware and okay this proposal. RESPONSE: We will coordinate the design of the privacy walls which faii within the typical 15' utility easement with the utility companies. Number.' 12 Created. 1111612004 [11116104] It appears that the drainage along the private drive all falls towards Boardwalk and is directed across the sidewalk. The design needs to address this as the amount of