HomeMy WebLinkAboutGLOBAL VILLAGE ACADEMY - SITE PLAN ADVISORY REVIEW - SPA130007 - CORRESPONDENCE - (3)Department: Technical Services
Contact: Jeff County, 970-221-6588, jcounty(aD-fcgov.com
Topic: Construction Drawings
Comment Number: 18 Comment Originated: 03/25/2014
03/25/2014: All curves on the Easement And Right Of Way Exhibit must be defined. Please
provide curve data for all curves.
Topic: General
Comment Number: 19 Comment Originated: 03/25/2014
03/25/2014: Based on the number of deeds for right of way and easements that will need to be
filed, you might reconsider platting the property. By platting all of these dedications could be
done in one document. Please note: It may take some time to review these legal descriptions,
once they are prepared and submitted for review.
Department: Water -Wastewater Engineering
Contact: Roger Buffington, 970.221-6854, rbuffington(a�fcgov.com
Topic: Construction Drawings
Comment Number: 7 Comment Originated: 03/25/2014
03/25/2014: Change the tee directly south of the building to an 8" x 8" tee with 6" x 8" reducers
on the north and south legs. The valves could be 6" or 8" depending on which side of the
reducer.
Comment Number: 7
Uomment Originated: 03/25/2014
03/25/2014: When will Taft Hill be widened? If this will take place in the near future could Light
& Power wait to set streetlights along Taft Hill until the widening takes place? If this will take
place in a year or two from now should we go ahead and set the streetlights now and have
them relocated in the future? Who will pay for the relocation of streetlights in the future?
Contact Light & Power Engineering to discuss installation of streetlights. 970-221-6700
Comment Number: 8
Comment Originated: 03/25/2014
03/25/2014: Light & Power needs an approved electronic copy (Autocad version 2008 or
older) of the site plan and utility plan submitted to TCOX@FCGOV.COM. Also, Light & Power
will need a paper copy of the approved plat for billing.
Department: PFA
Contact: Jim Lynxwiler, 970.416-2869, jlynxwiler(a)uoudre-fire.org
Topic: General
Comment Number: 3
Comment Originated: 03/26/2014
03/26/2014: FUTURE EMERGENCY ACCESS
The approved emergency access plan for this initial phase of the school has been well thought
out, meets the fire code, is effective and remains acceptable. As per page A-1 of the
Architectural Site Plan, it is clear emergency access relative to future school expansion will
have to be revisited and adjusted again at some point. No action need be taken now. I'm
making the comment so it's on your radar for future planning purposes. Please contact me at
any time should you wish to discuss this further.
Department: Stormwater Engineering
Contact: Wes Lamarque, 970-416-2418, wlamargue(a)fcgov.com
Topic: General
Comment Number: 5
Comment Originated: 02/04/2014
02/04/2014: The City would like a meeting to discuss options for the LID requirements. The
City is OK with delaying the porous pavers until phase 2. The meeting would focus on the 50%
site area draining into an infiltration system requirement.
Comment Number: 6
Comment Originated: 03/27/2014
03/27/2014: The site needs to meet the City's Detention Pond Landscape Standards. More
landscaping (trees, shrubs) is needed for the detention pond.
Comment Number: 7 Comment Originated: 03/27/2014
03/27/2014: The detention pond needs to be in a drainage easement.
Comment Number: 8 Comment Originated: 03/27/2014
03/27/2014: There is text on page 7 of the drainage report that discusses Waterfield
development. Please revise.
Comment Number: 9 Comment Originated: 03/27/2014
03/27/2014: Water should spill into the grate of the outlet structure at the water quality elevation,
which is 1 foot deep. The grate is at 2 feet above the invert of the pond. Please revise.
See redlines
Comment Number: 26 Comment Originated: 03/26/2014
03/26/2014: Please label the 2ft pan drainage detail on sheet C602 as "on site"
Department: Environmental Planning
Contact: Lindsay Ex, 970.224.6143, lex()fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 12/11/2013
01/30/2014: Please remove crested wheatgrass from your seed mix -it is a species that
invades and outcompetes other native species. Western Wheatgrass would be an excellent
substitution.
12/11/2013: It would be helpful to have the proposed seed mix for our review. Thanks.
Department: Forestry
Contact: Tim Buchanan, 970-221-6361, tbuchanan(aD_fcgov.com
Topic: Landscape Plans
Comment Number: 2 Comment Originated: 12/18/2013
12/18/2013:
Check street tree location so as to meet the LUC tree separation standard s (LUC 3.2.1.K)
Show locations for street lights, stop signs or signals, water and sewer service and main lines
and driveways and provide for the following separations.
20 feet from signs
40 feet from street lights for shade trees and 20 for ornamental trees
8 feet from driveways
10 feet from water and sewer mains
6 feet from water and sewer service lines
4 feet from gas lines
Comment Number: 5 Comment Originated: 12/18/2013
12/18/2013:
Review the Parking lot tree planting requirements in LUC 3.2.1 for adding of trees in and around
the parking lot area.
Comment Number: 6 Comment Originated: 12/18/2013
12/18/2013:
Review LUC 3.2.1 G General Standard and LUC 3.2.1 D Tree Planting Standard fro adding .
additional trees to the project.
Department: Light And Power
Contact: Rob Irish, 970-224-6167, rirish a()fcgov.com
Topic: General
Comment Number: 3 Comment Originated: 12/17/2013
03/25/2014: C-1 Form was included with Utility routing but no One -line diagram was submitted.
Please submit a One -line diagram to Light & Power Engineering.
01/31/2014:
12/17/2013: Please submit a C-1 Form and a One -line diagram to Light & Power Engineering.
F6rt Collins
Community Development and
Neighborhood Services
281 North College Avenue
PO Box 580
Fort Collins, CO 80522
970.221.6750
970.224.6134 - fax
fcgov. com/de velopmentreview
March 28, 2014
Jason Goode
Faurot Construction
4439 N. Broadway, Suite G
Boulder, CO 80304
RE: Global Village Academy Site Plan Advisory Review, SPA130007, Round Number 3
Please see the following summary of comments from City staff and outside reviewing agencies for your
submittal of the above referenced project. If you have questions about any comments, you may contact the
individual commenter or direct your questions through the Project Planner, Ted Shepard, at 970-221-6343 or
tshepard@fcgov.com.
Comment Summary:
Department: Engineering Development Review
Contact: Tyler Siegmund, 970.221.6501, tsiegmund fcgov.com
Topic: General
Comment Number: 22 Comment Originated: 03/26/2014
03/26/2014: The owner has decided not to plat the property so all utility, drainage, emergency
access easements as well as additional right-of-way will need to be dedicated by separate
document. Standard deed language will be provided to the owner. There is an additional
TDRF fee of $250 per easement/right-of-way to dedicated easements/right-of-way by separate
document. Please contact me for additional information on the process to dedicated by
separate document or visit the web link to the Engineering Department development review
website:
http://www.fcgov.com/engineering/devrev.php
Comment Number: 23 Comment Originated: 03/26/2014
03/26/2014: Documentation of the land valuation is needed for the additional right-of-way that
will be purchased for the right turn lane.
Comment Number: 24
Comment Originated: 03/26/2014
03/26/2014: Please submit the DCP application form and contact me to schedule the DCP
meeting.
Comment Number: 25 Comment Originated: 03/26/2014
03/26/2014: At the transformer location a note has been added to see note 11- please revise.