HomeMy WebLinkAboutGLOBAL VILLAGE ACADEMY - SITE PLAN ADVISORY REVIEW - SPA130007 - CORRESPONDENCE -Department: Water -Wastewater Engineering
Contact: Roger Buffington, 970-221-6854, rbuffington@fcqov.com
Topic: Construction Drawings
Comment Number: 2 Comment Originated: 02/04/2014
02/04/2014: Add two gate valves as shown on redlined plans.
Comment Number: 3 Comment Originated: 02/04/2014
02/04/2014: Revise the labels on the connection to the existing water main on Silver Trails as
noted on the redlined plans.
Comment Number: 4 Comment Originated: 02/04/2014
02/04/2014: Irrigation taps?
Comment Number: 5 Comment Originated: 02/04/2014
02/04/2014: See redlined plans for other comments.
Topic: Plat
Comment Number: 6 Comment Originated: 02/04/2014
02/04/2014: The easement extending south from Bronson for the water main and sanitary
sewer must be 35 feet wide. (15 feet on each side of the sewer and 10 feet on each side of the
water)
symbols. See reoun ies.
12/13/2013: There are line over text issues on sheets L-1 & L-2. See redlines.
Comment Number: 4 Comment Originated: 02/05/2014
02/05/2014: Please mask the City Forester note on sheet L-1. See redlines.
Comment Number: 5 Comment Originated: 02/05/2014
02/05/2014: Irrigation Plans: The title block on sheets IR-1 & IR-2 are cut off.
Topic: Plat
Comment Number: 6 Comment Originated: 02/05/2014
02/05/2014: Please add "County Of Larimer" to the sub -title. See redlines.
Comment Number: 7 Comment Originated: 02/05/2014
02/05/2014: Please add "Academy" to the Statement Of Ownership And Subdivision. See
redlines.
Comment Number: 8 Comment Originated: 02/05/2014
02/05/2014: Please label all dedication information for all streets shown. See redlines.
Comment Number: 9 Comment Originated: 02/05/2014
02/05/2014: Please label all lines & curves. There are several that are marked, but not this is
not necessarily all of them. See redlines.
Comment Number: 10 Comment Originated: 02/05/2014
02/05/2014: Please define the easements more clearly. It is unclear where some stop, and if
they overlap other easements. See redlines.
Comment Number: 11 Comment Originated: 02/05/2014
02/05/2014: Please move the bearings & distances around as marked. See redlines.
Comment Number: 12 Comment Originated: 02/05/2014
02/05/2014: All easements must be labeled and locatable. See redlines.
Comment Number: 13 Comment Originated: 02/05/2014
02/05/2014: If the Temporary Emergency Access Easement is temporary, what triggers
vacation of the easement? Should this be permanent?
Comment Number: 14 Comment Originated: 02/05/2014
02/05/2014: Is Reception # 89023905 the only source for right of way for Taft Hill Road &
Horsetooth Road?
Comment Number: 15 Comment Originated: 02/05/2014
02/05/2014: Please change the future right of way line to a solid line. See redlines.
Comment Number: 16 Comment Originated: 02/05/2014
02/05/2014: Please provide current acceptable monument records for the aliquot corners
shown. Please email these directly to Jeff County at jcounty@fcgov.com.
Comment Number: 17 Comment Originated: 02/05/2014
02/05/2014: Please make changes/additions to the legend as marked. See redlines.
Topic: Site Plan
Comment Number: 2 Comment Originated: 12/13/2013
02/05/2014: This was not routed to us for review.
12/13/2013: Please add a scale with scale bar to sheet A-1.
i
Comment NumL _.. 2
.,,,mment Originated: 02/03/2014
02/03/2014: EMERGENCY ACCESS EASEMENT
a) Turning radii of C-5 should be 25' rather than 15' as currently shown.
b) The fire lane shall be signed as per Appendix D, section D103.6 of the IFC with "NO
PARKING FIRE LANE."
c) The Temporary Fire Lane, along with the permanent fire lane, is required to be signed. It
shall be plowed and maintained as needed and kept otherwise unobstructed at all times.
Department: Stormwater Engineering
Contact: Jesse Schlam, 970-218-2932, Ischlam@fcgov.com
Topic: Erosion Control
Comment Number: 1
Comment Originated: 12/17/2013
01/28/2014: Erosion Control Report and Escrow still needed. Erosion Control Plan had minor
redlines pertaining to Perimeter Protection on the SW side of the Site, Inlet protection on the to
be installed inlets, and the addition of a sequence chart. If you need clarification concerning
this, or if there are any questions please contact Jesse Schlam 970-218-2932 or email @
jschlam@fcgov.com
12/17/2013: After a quick review of the Landscape plan for temporary and permanent seeding,
it was noted that the plan was a bit confusing with the Key versus In Plan Notes (i.e. hatch work
showed Temporary seeding but notes called out for Permanent seeding and vice -versa) Also,
a seed mix showing the Pure Live Seed ratio would be recommended either on the landscape
plan or later in the erosion control plan. If you need clarification concerning this, or if there are
any questions please contact Jesse Schlam 970-218-2932 or email @ jschlam@fcgov.com
Contact: Wes Lamarque, 970-416-2418, wlamarque@fcgov.com
Topic: General
Comment Number: 3 Comment Originated: 02/04/2014
02/04/2014: The detention pond slopes area little steeper than 4:1. Please revise.
Comment Number: 4
Comment Originated: 02/04/2014
02/04/2014: The City would like to explore the possibility of using part of the site for regional
water quality mitigation. The contact for this request is Mark Kempton at 970-416-2233.
Comment Number: 5
Comment Originated: 02/04/2014
02/04/2014: The City would like a meeting to discuss options for the LID requirements. The
City is OK with delaying the porous pavers until phase 2. The meeting would focus on the 50%
site area draining into an infiltration system requirement.
Department: Technical Services
Contact: Jeff County, 970-221-6588, (county@fcgov.com
Topic: Construction Drawings
Comment Number: 3 Comment Originated: 02/05/2014
02/05/2014: Please add benchmarks from the City of Fort Collins Vertical Control Network. The
benchmarks shown on sheets C000 & C001 are not City benchmarks.
Topic: Landscape Plans
Comment Number: 1 Comment Originated: 12/13/2013
02/05/2014: There are still line over text issues on sheet L-2. Please mask all marked
Comment Number: 1
comment Originated: 12/17/2013
01/31/2014:
12/17/2013: Light & Power has existing 3-phase power available along the North side of
Horsetooth Rd. adjacent to this site. Note, this line may be in the roadway. Any modification or
relocation of existing electric facilities will be at the owners expense.
Comment Number: 2
Comment Originated: 12/17/2013
01/31/2014:
12/17/2013: Coordinate power requirements and transformer location with Light & Power
Engineering @ 970-221-6700. Transformer location must be within 10' of a paved surface
accessible by a line -truck.
Comment Number: 3 Comment Originated: 12/17/2013
01/31/2014:
12/17/2013: Please submit a C-1 Form and a One -line diagram to Light & Power Engineering.
Comment Number: 4 Comment Originated: 12/17/2013
12/17/2013: Along the East side of Taft Hill Road there are existing streetlights at Bronson/Taft
and at Horsetooth/Taft with one mid -block streetlight between Horsetooth and Bronson. With
this development there may be a need for two additional streetlights adjacent to this site along
Taft Hill Rd staggering the existing lights. On your landscape plan please provide a minimum
of 40' of clearance from shade trees and 15' clearance from ornamentals.
Comment Number: 5 Comment Originated: 12/17/2013
01/31/2014:
12/17/2013: Owner will be responsible for Electric Capacity Fee, Building Site charges and
system modification charges where applicable.
Comment Number: 6 Comment Originated: 01/31/2014
01/31/2014: Transformer location looks to be fine. The routing of the electric primary to the
transformer shown on the plans may need to be adjusted do to many bends. Coordinate the
electric route with Light & Power Engineering.
Department: PFA
Contact: Jim Lynxwiler, 970-416-2869, iynxwiler@poudre-fire.ora
Topic: General
Comment Number: 1 Comment Originated: 12/17/2013
12/17/2013: Some outstanding comments remain for the PDR.
a) PUBLIC -SAFETY RADIO AMPLIFICATION SYSTEM - New buildings require a fire
department, emergency communication system evaluation after the core/shell but prior to final
build out. For the purposes of this section, fire walls shall not be used to define separate
buildings. Where adequate radio coverage cannot be established within a building,
public -safety radio amplification systems shall be designed and installed in accordance with
criteria established by the Poudre Fire Authority. Poudre Fire Authority Bureau Admin Policy
#07-01
b) FDC - Fire Department Connections shall be installed in accordance with NFPA standards.
Fire department connections shall be fully visible and recognizable from the street or nearest
point of fire department vehicle access. The location of the FDC shall be approved by the fire
department.
c) All other PFA comments relative to the PDP may be deferred until building permit (e.g.
Fire Alarm, Sprinkler System, Commercial Kitchen Hoods, Knox Box, Premise Identification).
1
Comment Num, _.: 12 , omment Originated: 02/07/2014
02/07/2014: Please add the following note to the plat:
There shall be no private conditions, covenants or restrictions that prohibit or limit the
installation of resource conserving equipment or landscaping that are allowed by Sections
12-120-12-122 of the City Code.
Comment Number: 13
Comment Originated: 02/07/2014
02/07/2014: A pedestrian access easement is needed where the public sidewalk extends onto
private property just east of the Silver Trails Dr/Horsetooth Rd intersection. See plat and utility
plan (sheet C300) redlines
Department: Environmental Planning
Contact: Lindsay Ex, 970-224-6143, lex@fcgov.com
Topic: General
Comment Number: 1
Comment Originated: 12/11/2013
01/30/2014: Please remove crested wheatgrass from your seed mix -it is a species that
invades and outcompetes other native species. Western Wheatgrass would be an excellent
substitution.
12/11/2013: It would be helpful to have the proposed seed mix for our review. Thanks.
Department: Forestry
Contact: Tim Buchanan, 970-221-6361, tuchanan@fcgov.com
Topic: Landscape Plans
Comment Number: 2
12/18/2013:
Comment Originated: 12/18/2013
Check street tree location so as to meet the LUC tree separation standard s (LUC 3.2.1.K)
Show locations for street lights, stop signs or signals, water and sewer service and main lines
and driveways and provide for the following separations.
20 feet from signs
40 feet from street lights for shade trees and 20 for ornamental trees
8 feet from driveways
10 feet from water and sewer mains
6 feet from water and sewer service lines
4 feet from gas lines
Comment Number: 5 Comment Originated: 12/18/2013
12/18/2013:
Review the Parking lot tree planting requirements in LUC 3.2.1 for adding of trees in and around
the parking lot area.
Comment Number: 6
Comment Originated: 12/18/2013
12/18/2013:
Review LUC 3.2.1 G General Standard and LUC 3.2.1 D Tree Planting Standard fro adding
additional trees to the project.
Department: Light And Power
Contact: Rob Irish, 970-224-6167, rirish@fcgov.com
Topic: General
Comment Number: 14
comment Originated: 02/07/2014
02/07/2014: Please revise General note #5 and #34 on Sheet C001:
Note 5 should read- "All sanitary sewer, storm sewer, and water line construction, as well as
power..."
Note 34 needs to reference "approval by the City of Fort Collins"
Comment Number: 15 Comment Originated: 02/07/2014
02/07/2014: There is reverse drainage in the drive approach off of Bronson in front of the
eastern handicap ramp. Please revise. See Grading plan redlines (sheet C400)
Comment Number: 16
Comment Originated: 02/07/2014
02/07/2014: The handicap ramp alignment at Bronson and Taft Hill needs to shift to the west
and be constructed as a directional ramp. Please revise the proposed sidewalk. See
redlines
Comment Number: 17 Comment Originated: 02/07/2014
02/07/2014: The handicap ramp at Horsetooth and Silver Trails needs to shift to the north and
be constructed as a directional ramp. Please revise the sidewalk to bend around the electrical
vault to the north. See redlines
Comment Number: 18 Comment Originated: 02/07/2014
02/07/2014: Please add the standard sidewalk note to the Utility Plan (sheet C3)
Any damaged curb, gutter and sidewalk existing prior to construction, as well as streets,
sidewalks, curbs and gutters, destroyed, damaged or removed due to construction of this
project, shall be replaced or restored to City of Fort Collins standards at the Developer's
expense prior to the acceptance of completed improvements and/or prior to the issuance of
the first Certificate of Occupancy
Comment Number: 19 Comment Originated: 02/07/2014
02/07/2014: Add the City signature block to the Construction Details sheet (sheet C600)
Comment Number: 20 Comment Originated: 02/07/2014
02/07/2014: Please add the standard patching note to the Utility Plan (sheet C3)
Limits of street cut are approximate. Final limits are to be determined in the field by the City of
Fort Collins Engineering Inspector. All repairs to be in accordance with city street repair
standards.
Comment Number: 21 Comment Originated: 02/07/2014
02/07/2014: Please add the following LCUASS details to the Utility plan set:
701- Vert curb/gutter detail
702- drive over curb/gutter detail
1606- directional handicap ramp detail
1606(a)- directional handicap ramp detail
Topic: Plat
Comment Number: 11
Comment Originated:- 02/07/2014
02/07/2014: Please update the Statement of Ownership and Subdivision note to reference
Global Village Academy (the "Developer") See plat redlines
Community Development and
Neighborhood Services
281 North College Avenue
PO Box 580
Fort Collins, CO 80522
970.221.6750
970.224.6134 - fax
fcgov.com/deve/opmentreview
February 14, 2014
Jason Goode
Faurot Construction
4439 N. Broadway, Suite G
Boulder, CO 80304
RE: Global Village Academy Site Plan Advisory Review, SPA130007, Round Number 2
Please see the following summary of comments from City staff and outside reviewing agencies for your
submittal of the above referenced project. If you have questions about any comments, you may contact the
individual commenter or direct your questions through the Project Planner, Ted Shepard, at 970-221-6343 or
tshepard@fcgov.com.
Comment Summary:
Department: Current Planning
Contact: Ted Shepard, 970-221-6343, tshepard@fcgov.coni
Topic: General
Comment Number: 12
Comment Originated: 02/14/2014
02/14/2014: Please consider adding a row of foundation shrubs along the north elevation of the
building. The north elevation has significant exposure to Taft Hill Road and a row of shrubs will
help soften the building.
Comment Number: 13 Comment Originated: 02/14/2014
02/14/2014: Please see redline comments on the Landscape Plan to improve readability.
Comment Number: 14 Comment Originated: 02/14/2014
02/14/2014: For the next round, please include the Site Plan for reference.
Comment Number: 15
Comment Originated: 02/14/2014
02/14/2014: On the Lighting Plan, please delete the A-1 and A-2 fixtures from the Luminaire
Schedule as these fixtures are not indicated on the photometric plan. Also, please add a
quantity column.
Department: Engineering Development Review
Contact: Tyler Siegmund, 970-221-6501, tiegmund@fcgov.com
Topic: Construction Drawings