HomeMy WebLinkAboutLEMAY AVENUE ESTATES - PDP - 37-04 - CORRESPONDENCE - (6)Cover Memo
To: David Averill, Transportation Planning
Glen Schlueter, Stormwater
Doug Moore, Natural Resources
Steve Olt, Current Planning
Marc Virata, Engineering
Hearing Officer
From: Troy Jones
Re: Lemay Avenue Estates
Stan Everitt and I met with the City at Staff review on March 2 and went over the punch list of
items that need to be resolved in order to schedule Lemay Avenue Estates PDP for hearing.
Here's what was requested to be informally submitted to the City for review:
1. Revised utility plan sheets that show:
• (1) the coordination of the stormwater inlet & trail connection on the cul-de-sac at
the end of Woods Landing Drive;
• (2) detail sheet showing the trail widened and thickend so stormwater
maintenance trucks can drive on it to access the floodplain tract;
2. Revised plat drawing showing:
• (1) the revised tract D as two separate tracts, one in the floodplain, one out of
the floodplain;
• (2) the widening of the ROW of Mountain Home Drive between Showline and
Lemay to provide the 36 feet of roadway.
3. Revised site plan showing:
• (1) new trail location (moved out of the erosion control buffer), and
• (2) arbor detail with a note stating the HOA will be responsible for the maintenance
and liability of the arbor.
4. Revised drainage information:
• (1) Basin OS-1 needs to be shown to satisfy comment #62,
• (2) need a letter (from our geotechnical engineer) or revised groundwater report
that confirms that we don't need subdrains, or if we do, we need to clarify where the
outfalls would be.
• (3) in the event that we have sump pits for the perimeter drains around each lot, we
need to ensure that these can have adequate outfalls that won't affect the lot
configuration.
Note: 6 packets have
been created,
each packet
has
this cover memo and
contains one
of each
of the
above items.