Loading...
HomeMy WebLinkAboutLEMAY AVENUE ESTATES - PDP - 37-04 - SUBMITTAL DOCUMENTS - ROUND 1 - TRAFFIC STUDYStRgff y apt Rd COVIt�wY N •�1 It i Nefl- pdd Secci St t c. RILBY ROAD . JEy m � Q P OJ CT L CAT N Z R.d:Nd. Rd w w m D Z w Q r Q w J CARPENTER ROAD ,^VICINITY MAP Figure 1 VICINITY MAP INTRODUCTION Lemay Avenue Estates is a residential development located along the east side of Lemay Avenue about midway between Trilby Road and Carpenter Road in Fort Collins, Colorado. A vicinity map is presented on Figure 1. This transportation impact study follows the established guidelines for such studies as are applicable and appropriate to the proposed project. The following key steps were undertaken as part of this study. • Obtain current traffic and roadway data in the immediate area of the site. • Evaluate current operations to establish base conditions. • Determine site generated traffic volumes and distribute this traffic to the nearby street system. • Estimate roadway traffic volumes for future conditions. • Evaluate operations with Lemay Avenue Estates fully developed. • Inventory, evaluate, and assess the pedestrian, bicycle, and transit net- works serving the site. • Identify deficiencies and recommend measures to mitigate the impact of site generated traffic and enhance the alternate travel mode systems as appropriate. Key areas of investigation are documented in the following sections of this transporta- tion impact study. List of Tables Table 1 Pedestrian LOS Worksheet........................................................................21 Table 2 Bicycle LOS Worksheet..............................................................................22 List of Figures Figure1 Vicinity Map................................................................................................2 Figure 2 Current Peak Hour Traffic.........................................................................5 Figure 3 Current Roadway Geometry ......................................................................7 Figure4 Concept Plan.............................................................................................9 Figure 5 Site Traffic Distribution............................................................................11 Figure6 Site Traffic.............................................................................:.................12 Figure 7 Short -Term Background Traffic...............................................................13 Figure 8 Short -Term Total Traffic..........................................................................15 Figure 9 Short -Term Roadway Geometry .............................................................16 Table of Contents INTRODUCTION..................................................................................................1 II. AGENCY DISCUSSIONS....................................................................................3 III. EXISTING CONDITIONS.....................................................................................3 A. Existing Road Network..................................................................................3 B. Surrounding Land Uses.................................................................................4 C. Existing Traffic...............................................................................................4 D. Existing Traffic Operations............................................................................6 IV. DEVELOPMENT ISSUES....................................................................................8 A. Project Description........................................................................................8 B. Site Traffic.....................................................................................................8 C. Trip Distribution...........................................................................................10 V. FUTURE CONDITIONS.....................................................................................10 A. Roadway Improvements..............................................................................10 B. Short -Term Background Traffic...................................................................10 VI. TRAFFIC IMPACTS...........................................................................................14 A. Auxiliary Lane Requirements.......................................................................14 B. Short -Term Operating Conditions................................................................14 VII. PEDESTRIAN FACILITIES................................................................................19 A. Existing Conditions.....................................:................................................19 B.. Planned Improvements................................................................................19 C. Levels-of-Service.........................................................................................19 VIII. BICYCLE FACILITIES........................................................................................20 A. Existing Conditions......................................................................................20 B. Planned Improvements................................................................................20 C. Levels of Service.........................................................................................20 IX. TRANSIT.......................................................... :................................................. 23 X. CONCLUSIONS.................................................................................................23 Transportation Impact Study LEMAY AVENUE ESTATES Fort Collins, Colorado Prepared For: Everitt Companies 3030 S. College #200 Fort Collins, CO 80525 Prepared By: Eugene G. Coppola, P.E. P. O. Box 260027 Littleton, CO 80163 303-792-2450 October 13, 2004