INTRODUCTION
Lemay Avenue Estates is a residential development located along the east side of
Lemay Avenue about midway between Trilby Road and Carpenter Road in Fort
Collins, Colorado. A vicinity map is presented on Figure 1.
This transportation impact study follows the established guidelines for such studies as
are applicable and appropriate to the proposed project. The following key steps were
undertaken as part of this study.
• Obtain current traffic and roadway data in the immediate area of the site.
• Evaluate current operations to establish base conditions.
• Determine site generated traffic volumes and distribute this traffic to the
nearby street system.
• Estimate roadway traffic volumes for future conditions.
• Evaluate operations with Lemay Avenue Estates fully developed.
• Inventory, evaluate, and assess the pedestrian, bicycle, and transit net-
works serving the site.
• Identify deficiencies and recommend measures to mitigate the impact of
site generated traffic and enhance the alternate travel mode systems as
appropriate.
Key areas of investigation are documented in the following sections of this transporta-
tion impact study.
List of Tables
Table 1 Pedestrian LOS Worksheet........................................................................21
Table 2 Bicycle LOS Worksheet..............................................................................22
List of Figures
Figure1 Vicinity Map................................................................................................2
Figure 2 Current Peak Hour Traffic.........................................................................5
Figure 3 Current Roadway Geometry ......................................................................7
Figure4 Concept Plan.............................................................................................9
Figure 5 Site Traffic Distribution............................................................................11
Figure6 Site Traffic.............................................................................:.................12
Figure 7 Short -Term Background Traffic...............................................................13
Figure 8 Short -Term Total Traffic..........................................................................15
Figure 9 Short -Term Roadway Geometry .............................................................16
Table of Contents
INTRODUCTION..................................................................................................1
II. AGENCY DISCUSSIONS....................................................................................3
III. EXISTING CONDITIONS.....................................................................................3
A. Existing Road Network..................................................................................3
B. Surrounding Land Uses.................................................................................4
C. Existing Traffic...............................................................................................4
D. Existing Traffic Operations............................................................................6
IV. DEVELOPMENT ISSUES....................................................................................8
A. Project Description........................................................................................8
B. Site Traffic.....................................................................................................8
C. Trip Distribution...........................................................................................10
V. FUTURE CONDITIONS.....................................................................................10
A. Roadway Improvements..............................................................................10
B. Short -Term Background Traffic...................................................................10
VI. TRAFFIC IMPACTS...........................................................................................14
A. Auxiliary Lane Requirements.......................................................................14
B. Short -Term Operating Conditions................................................................14
VII. PEDESTRIAN FACILITIES................................................................................19
A. Existing Conditions.....................................:................................................19
B.. Planned Improvements................................................................................19
C. Levels-of-Service.........................................................................................19
VIII. BICYCLE FACILITIES........................................................................................20
A. Existing Conditions......................................................................................20
B. Planned Improvements................................................................................20
C. Levels of Service.........................................................................................20
IX. TRANSIT.......................................................... :................................................. 23
X. CONCLUSIONS.................................................................................................23
Transportation Impact Study
LEMAY AVENUE ESTATES
Fort Collins, Colorado
Prepared For:
Everitt Companies
3030 S. College #200
Fort Collins, CO 80525
Prepared By:
Eugene G. Coppola, P.E.
P. O. Box 260027
Littleton, CO 80163
303-792-2450
October 13, 2004