HomeMy WebLinkAboutNORTHEAST CORNER OF EAST PROSPECT ROAD & I-25 - REZONING - 16-07 - REPORTS - RECOMMENDATION/REPORTI
r.
IliNDEVELOPED
LAR.IMER COL-tNTY.
TALI
x
g�s4g�c
e
6XISTINCI Z.ONINCI:
I NDI.4STR.IAL---
PR.OPOS6D Z
COMM 6R1
PARCEL 11
30.4 AC,
6XISTINCI Z,ONINCt:
C0MM6R-C,LA( .
EOPT COLLINS MOTOR
SPORTS LAPRIMER
101
TzEZON I N<�-j EXHf(g(T
ET. COLLINS, COLORADO
A L.IGI L,kST 2007
rf
r
0
r
��RCa✓ l_ I 1 I �'
19.4 sic i z
LbTPA
6XISTINCI.ZIONINCI: -��
Io(R'E .4N 6STAT6
a ;
S
PROPOS ED I-f I Cj I-t
SCf-TOOL SITE .ZONED 'L,CE'
-•
Ccn'tN
I;Lf�R
ar.
TOTAL AREA 135.37
AC
EXISTING ROW
3.46 AC
0 PROPOSED CDOT ROW
5.52 AC
PROPOSED ROW
13.08 AC
EXISTING GWET EASEMENT
1.92 AC
E PROPOSED DRAINAGE
4.15 AC
EXISTING DITCH
2.55 AC
EXISTING CANAL
1.09 AC
RESIDENTIAL
19.41 AC
WET/DRY UTILITY EASEMENTS
5.30 AC
**SITE DETENTION
13.00 AC
**OPEN SPACE/TRAILS
11.00 AC
NET DEVELOPABLE AREA
54.89 AC
I�
i
0 150 300
NORTH 1" = 300'
**ENGINEERING ESTIMATE - SUBJECT TO
CHANGE BASED ON FINAL SITE PLAN
Xip] P3 747 OMI
ulaw.eao
P J1)a]S p]Ot 1
F 31]a]S0616 NORRIS DESIGN
-w q . Plrmmp I UnOwpo Archim a r,
W
Q
z
0
Y
U
M
N
OA1, FW- �e
.Q Q
50
W O
Z
z
O*�
E PROSPECT RD
9/14/2007
°
ir
W °
0
Z W
c�
Z
O
h C
LL
W
N
°
W
PALAMINO LN
x
U
z
DENROSE CT y gRENTON OR
C WITHERS DR
z
J
°
2
Q
° ? SyFr W
LU
a oc�
ESPIRIT DR a
W
a Vol
QUEST DR GPR��PGE
Staff Proposed Zoning:
E - Employment BRUMBY LN
Staff Proposed Zoning:
C' .' Commercial
C
A
4
;
�
O
KITCHELL WAY I
#16-07 N E Corner of N
1-25 & Prospect Road Rezoning,--_j City Limits
Staff Proposed Zoning
1 inch equals 600 feet
7/11 /2007
C
#16-07 N E Corner of
1-25 & Prospect Road Rezoning
Existing Zoning
UE
Proposed PR-1 Site
N
1 inch equals 600 feet
SITE
Proposed PR-1 Site
#16-07 N E Corner of N
1-25 & Prospect Road Rezoning
7/11/2007 1 inch equals 600 feet
NE Comer Prospect & 1-25, Rezoning and Structure Plan/1-25 Subarea Plan
Amendments
September 20, 2007 P & Z Meeting
Page 20
4. The proposed rezoning would not result in significantly adverse impacts on the
natural environment.
5. The proposed rezoning would result in a logical and orderly pattern of development.
RECOMMENDATION:
Staff recommends approval of the amendments to the 1-25 Subarea Plan and the City
Plan Structure Plan map and the rezoning of 86 acres of I, Industrial to 66 acres of C,
Commercial and 20 acres of E, Employment. Staff also recommends that an additional
19 acre parcel, owned by the applicant, be rezoned from UE, Urban Estate to E,
Employment to create a 39 acre E zoned buffer between the C, Commercial zoned area
(a total of 96 acres) and residential areas to the north and east.
ATTACHMENTS:
Current Zoning Map_NE Comer of 1-25 & Prospect Avenue
Proposed Zoning Map_NE Corner of 1-25 & Prospect Avenue
NE Comer Prospect & 1-25, Rezoning and Structure Plan/1-25 Subarea Plan
Amendments
September 20, 2007 P & Z Meeting
Page 19
limited to, water, air, noise, stormwater management, wildlife, vegetation,
wetlands and natural functioning of the environment;
Staffs perspective is that development in the C, Commercial District and the E,
Employment District would have no significantly adverse impacts on the natural
environment. Any development application will be subject to the City's development
standards relative to natural habitat, energy conservation, stormwater and landscape
design. Part of the reason for enlarging the C, Commercial zoning in the NE quadrant
was to devote land to the proper management of the Boxelder Creek floodplain.
(c) whether and the extent to which the proposed amendment would result in a
logical and orderly development pattern.
The Prospect Road/1-25 interchange is a key interchange to the economic development
goals of the community. It is logical that such an important interchange maximize the
ability to have land available for the development of a mix of commercial and
employment types of uses. The City's development standards will require adequate
public utilities and infrastructure to be in place to assure an orderly development
pattern.
FINDINGS OF FACT/CONCLUSIONS:
After reviewing the NE corner of East Prospect Road and 1-25 rezoning and
amendments to the 1-25 Subarea Plan and the City Plan Structure Plan Map - #16-07,
staff makes the following findings of fact and conclusions as explained above:
1. The request for amendments to the 1-25 Subarea Plan and the City Plan Structure
Plan map fundamentally change the City's plans for the NE quadrant of the Prospect
Road/1-25 interchange to allow for the development of a regional/community scale
shopping center, but otherwise would be consistent with the City Plan's overall
vision, goals, principles, and policies.
2. The rezoning request is consistent with City Plan, the City's Comprehensive Plan,
based on the Structure Plan map amendment and amendments to the 1-25 Subarea
Plan.
3. The proposed C, Commercial District and E, Employment District are appropriate for
the parcels and will help provide tax revenues necessary to cover local funding
required to improve the Prospect Road/1-25 interchange as well as other
infrastructure improvements..
NE Corner Prospect & 1-25, Rezoning and Structure Plan/1-25 Subarea Plan
Amendments
September 20, 2007 P & Z Meeting
Page 18
Interstate interchanges are the type of desirable sites for such regional serving retail
uses.
Land use plans by other jurisdictions, particularly the Town of Timnath, are changing the
character of areas east of 1-25 from the rural, low density residential, areas shown on
the City's plans, to more intense urban uses. In June 2007, the Timnath Town Board
approved an amendment to Timnath's Land Use Plan which extended Timnath's
Growth Management Area (GMA) boundary north of Timnath to County Road 52 (the
northern boundary of the A-B brewery). The Timnath Land Use Plan also intensified the
residential densities and land uses in the area to include commercial and employment
uses. This is a significant change of conditions that affects areas within the Fort Collins
GMA boundary. 1-25 is no longer a line from which land uses begin to decrease in
intensity from employment and commercial uses adjacent to the highway, to urban
residential, to urban estate residential, to rural uses. The land uses in areas east of 1-25
are beginning to mirror the urban types of land uses west of 1-25. Even the 100 acres of
UE zoned property owned by the Poudre School District slated for use as athletic fields
and school bus storage are not low intensity, rural types of land uses.
In addition to the above, Section 2.9.4[H][3] provides factors that may be considered
along with the mandatory requirements for quasi-judicial rezonings. Staff has prepared
a response to each of the additional factors, demonstrating how the optional criteria
could also be met:
(a) whether and the extent to which the proposed amendment is compatible with
existing and proposed uses surrounding the subject land, and is the appropriate
zone district for the land;
The C, Commercial District and the E, Employment District are the appropriate zones
for the property. The E, Employment District will provide for a land use transition from
the C, Commercial District areas to the surrounding residential properties to the north
and east. The E, Employment District is more restrictive than the previous I, Industrial
District for the property to the north. Areas to the south and west are designated for a
mix of commercial and employment uses. Also, the regulations contained in the Land
Use Code are intended to have employment districts along the 1-25 corridor designed in
a manner to maintain openness through the use of: setback requirements, maximum
building frontage allowances, restricting building heights, and proper management of
floodplains.
(b) whether and the extent to which the proposed amendment would result in
significantly adverse impacts on the natural environment, including, but not
NE Corner Prospect & 1-25, Rezoning and Structure Plan/1-25 Subarea Plan
Amendments
September 20, 2007 P & Z Meeting
Page 17
Fort Collins will be a leader in developing an economy which continues to
"develop" within its GMA.
The NE quadrant of the Prospect Road/1-25 interchange is within the City's GMA
boundary. The plan amendments and rezonings will help strengthen the interchange for
an expanded role in the City's economic development strategies.
Policy GM-4.2 states:
Capital Improvement Policy. The City will continue to operate under the following
Capital Improvement Policies:
e. The City will use a variety of different funding sources to fund capital
projects with an emphasis on the "Pay-as-you-go" philosophy.
One of the applicant's stated justifications for the plan amendments and rezoning is to
provide a land use basis for the ability to generate sufficient tax revenues from the
development of parcels around the Prospect Road/1-25 interchanges to cover the costs
of necessary infrastructure improvements, including the major expense of
reconstructing the Prospect Road/1-25 interchange. This would be consistent with the
pay-as-you-go philosophy.
(b) warranted by changed conditions within the neighborhood surrounding and
including the subject property.
There are several changed conditions that help justify the plan amendments and
rezoning request.
When the 1-25 Subarea Plan was adopted in 2003, it was assumed that the necessary
improvements to the Prospect Road/1-25 interchange would be funded by the Colorado
Department of Transportation (CDOT) and/or the Federal Highway Administration
(FHWA) since it was part of the federal/state highway system. It was not anticipated
that the responsibility for improving the interchange would fall on local governments
and/or adjacent property owners using public/private partnerships. The plan
amendments and rezoning request will help address this changed condition whereby
local revenues will need to be created in order to finance interchange improvements.
The competition for retail sales tax dollars is also significantly different now in 2007 than
it was in 2003. In order for the City to remain competitive in the Northern Colorado
market, undeveloped retail commercial sites in desirable locations need to be provided.
The City is lacking in areas to attract regional/community scale retail establishments.
NE Corner Prospect & 1-25, Rezoning and Structure Plan/1-25 Subarea Plan
Amendments
September 20, 2007 P & Z Meeting
Page 16
How the plan amendments and rezoning request addresses the requirements in the
City's Land Use Code are summarized below:
(a) consistent with the City's Comprehensive Plan;
As indicated earlier, staff decided to review the land uses around the Prospect Road/1-
25 interchange as a result of the rezoning requests from the City, for the SW quadrant,
and the private property owner, for the NE quadrant, to determine what would be the
best land use pattern for the area around the interchange for the City as a whole,
independent of the specific rezoning requests. The amendments to the plans are
related to the rezoning requests but are independent actions. If the amendments to the
plans are approved, the rezoning requests are simply implementation actions to the
plan amendments. Staff is recommending the plans be amended to allow additional
commercial and employment land uses to develop in the NE quadrant of the Prospect
Road/1-25 interchange.
It is becoming more apparent that 1-25 is not a logical urban edge to the community.
The importance of the 1-25 corridor to the economic development of Northern Colorado
can be viewed all along the corridor. The towns of Timnath, Windsor, and Wellington
are changing the character of areas east of 1-25 from the rural, low density residential
areas envisioned in both the initial City Plan of 1997, and the 2004 update, to urban
types of uses. In staffs opinion, the City's plans need to be changed to address the
new regional context of what is happening beyond the City's Growth Management Area
(GMA) boundary.
In City Plan, one of the stated community goals is:
Fort Collins will maintain its role as a regional economic center.
The downtown, the Foothills Mall, and South College Avenue are typically the areas
cited as the most important retail shopping locations to help achieve this goal. Staff
believes that interstate interchanges need to be elevated to share a similar importance.
Principle ECON-2 states:
Economic Sustainability: The City will strive to develop an economy which will be
self-sustaining within the limits of its GMA.
Policy ECON-2.2 states:
NE Corner Prospect & 1-25, Rezoning and Structure Plan/1-25 Subarea Plan
Amendments
September 20, 2007 P & Z Meeting
Page 15
Page 26
Page 26
The map amendments
will graphically depict the
Fort Collins 1-25
Fort Collins 1-25
proposed zoning
Subarea Plan — Zoning
Subarea Plan — Zoning
changes to show 96 total
Plan
Plan
acres of the C,
Commercial District and
Existing map.
The map will be
39 acres of the E,
amended to delete 86
Employment District.
acres of I, Industrial
zoning and 19 acres of
Urban Estate zoning to
show about 66 additional
acres of C, Commercial
zoning and 20 acres of E,
Employment zoning the
NE quadrant of the
Prospect/1-25
interchange adjacent to
the highway.
Below is a summary of the recommended change to the City Plan Structure Plan map.
Existing Map
Amendment
Justification
for the Change
Existing map.
The map will be
The map amendments
amended to delete 86
will graphically depict the
acres of Industrial District
map's consistency to the
land and 19 acres of
amendments being made
Urban Estate land to
in the 1-25 Subarea Plan.
show about 96 acres of
Commercial Corridor land
and 39 acres of
Employment District land
located in the NE
quadrant of the
Prospect/1-25
interchange adjacent to
the highway.
Analysis Based on Rezoning Review Criteria
NE Corner Prospect & 1-25, Rezoning and Structure Plan/1-25 Subarea Plan
Amendments
September 20, 2007 P & Z Meeting
Page 14
Page 26
Fort Collins 1-25
Subarea Plan — Land
Use Plan
Existing map.
Page 26
Fort Collins 1-25
Subarea Plan — Land
Use Plan
The map will be
amended to delete 86
acres of Industrial
designated land and 19
acres of Urban Estate
land in the NE quadrant
and to show about 66
acres of additional
Commercial land and 20
acres of Employment
land in the NE quadrant
of the Prospect/1-25
interchange.
Also, the Activity Centers
boundary around the
Commercial Corridor
designated land in the
NE quadrant will be
expanded to cover all 96
acres of commercial
designated land..
acres, additional land
necessary to be
designated for
commercial development
above the simple addition
of 25 acres from the SW
quadrant. A total of 79
acres of commercial
zoning is requested and
should be sufficiently
large enough for a
regional/community
sh000ino center.
Page 26
Fort Collins 1-25
Subarea Plan — Land
Use Plan
The map amendments
will graphically depict the
wording changes being
made in the 1-25 Subarea
Plan.
NE Comer Prospect & 1-25, Rezoning and Structure Plan/1-25 Subarea Plan
Amendments
September 20, 2007 P & Z Meeting
Page 13
21
5.2 Land Use Plan
Objectives
Designation of Activity
Centers. This plan
designates activity
centers along 1-25 at the
Prospect Road and
Mulberry Street
interchanges. These
centers are intended to
evolve into concentrated
areas of mixed -use
development with high
visibility, increased levels
of activity, and more
integrated appearances.
In addition, the northeast
quadrant of the I-
25/Mulberry interchange
is planned as a potential
location for a
regional/community
shopping center.
5.2 Land Use Plan
Objectives
Designation of Activity
Centers. This plan
designates activity
centers along 1-25 at the
Prospect Road and
Mulberry Street
interchanges. These
centers are intended to
evolve into concentrated
areas of mixed -use
development with high
visibility, increased levels
of activity, and more
integrated appearances.
in addition, the neFtheas
and also
the potential location for
a regional/community
shopping centers.
property.
The need for additional
undeveloped commercial
land in the City is critical
for the community to
provide alternative
locations for retail
development in Northern
Colorado. Interstate
interchanges are a logical
location for regionally
serving retail
development.
With the rezoning of 25
acres of commercial
zoning to employment
zoning in the SW
quadrant of the Prospect
Road/1-25 interchange
and the relative lack of
commercial zoning in the
community as a whole, it
is important to maintain a
significant amount of
commercial zoning at the
Prospect/1-25
interchange. Basically,
transferring 25 acres of
Commercial zoning from
the SW quadrant to the
30 acres of Commercial
zoning in the NE
quadrant is a start.
However, due to
development constraints
in the NE quadrant, such
as land needed to
accommodate the
Boxelder floodway, etc.,
which requires about 20
NE Corner Prospect & 1-25, Rezoning and Structure Plan/1-25 Subarea Plan
Amendments
September 20, 2007 P & Z Meeting
Page 12
Again, in summary, the specific plan amendments for this request involve changing 86
acres of industrial to 66 acres of commercial and 20 acres of employment and changing
19 acres of urban estate to employment in the NE quadrant of the Prospect
interchange.
To support the requested rezoning, staff believes amendments to existing plans will be
necessary. Listed below are the statements, policies, and maps which need to be
amended within the 1-25 Subarea Plan.
Existing
Statements, Policies,
Page vi
Executive Summary:
Two activity centers are
identified for the subarea,
one at the 1-25/Mulberry
Street interchange and
the other at the I-
25/Prospect Road
interchange. The
northeast quadrant of the
1-25/Mulberry Street
interchange is also
planned for the potential
location of a
regional/community
shopping center.
Amendments
Deletion Additions
Two activity centers are
identified fsf in the
subarea for the potential
location of
regional/community
shopping centers, one at
the 1-25/Mulberry Street
interchange and the other
at the 1-25/Prospect Road
interchange. T-14e
neFthea6t quadFant of the
I_25W Jherni StFee4
+ntershange is also
planned for the potential
leGatien of a
sbeppiRg seateF..
Justification
for the Change
The undeveloped land in
the NE quadrant of the I-
25 and Mulberry Street
interchange initially
planned for the potential
location of a
regional/community
shopping center is
approximately 50 acres in
size. Adding 66 acres of
commercial zoned land to
the existing 30 acres at
the NE quadrant of the
Prospect Road and 1-25
interchange would make
a 96 acre parcel large
enough for a regional or
community shopping
center. However, all 96
acres are not
developable due to 20
acres of site constraints,
including the Boxelder
Creek floodplain. _
Therefore, the total
developable size of the
commercial area would
be 76 acres, or about the
size of the Foothills Mall
NE Comer Prospect & 1-25, Rezoning and Structure Plan/1-25 Subarea Plan
Amendments
September 20, 2007 P & Z Meeting
Page 11
The Structure Plan map, a component of City Plan, the City's Comprehensive Plan, sets
forth a basic pattern of development, showing how Fort Collins should grow and evolve
over the next 20 years. The 1-25 Subarea Plan is an element of City Plan and provides
greater detail and policies for the 1-25 corridor. The maps in these existing plans
currently designate 30 acres as commercial, 86 acres as industrial, and 19 acres as
urban estate (not including the 100 acres owned by the Poudre School District) in the
NE quadrant of the Prospect Road/1-25 interchange.
To recommend approval of the rezoning proposal, staff and the Planning and Zoning
Board have to find that: 1) the existing Structure Plan is in need of change; and 2) the
proposed changes would promote the public welfare and be consistent with the vision,
goals, principles, and policies of City Plan. The applicable criteria are contained in
Appendix C of City Plan.
Review Criteria for Structure Plan Minor Amendments:
Appendix C of City Plan outlines mandatory requirements for public notice, review
process and evaluation criteria for minor amendments to City Plan, including Structure
Plan map amendments. The Plan text states:
"A plan amendment will be approved if the City Council makes specific findings
that:
The existing City Plan and/or related element thereof is in need of the proposed
amendment, and
The proposed plan amendment will promote the public welfare and will be
consistent with the vision, goals, principles and policies of City Plan and the
elements thereof."
The fundamental policy issue to be addressed in this rezoning request: should City
plans be amended and zoning changed to allow for the development of a
regional/community scale shopping center in the NE quadrant of the Prospect Road/1-25
interchange? A regional/community shopping center in the NE quadrant will help
contribute tax revenues necessary to fund Prospect Road/1-25 interchange
improvements and related infrastructure. Given the cost to development from all four
quadrants around the interchange will need to contribute funding to improve the
interchange.
NE Corner Prospect & 1-25, Rezoning and Structure Plan/1-25 Subarea Plan
Amendments
September 20, 2007 P & Z Meeting
Page 10
o With Town of Timnath, Don Bachman, Cache la Poudre Irrigation
Company, Poudre Valley School District and a local developer,
developed cross section profile of future Prospect ROW which is in use
today.
GREELEY WATER EXTENSION & TRANSMISSION PROJECT (GWET)
Background: Greeley's GWET project is a 60" diameter waterline delivering water
from their pre-treatment plant NW of Fort Collins to Greeley. In its nominal
configuration, the bottom of the pipeline is to be placed on top of approximately 2
feet of gravel and covered with at least 60" of soil making the total depth of their
pipeline excavation and backfill approximately 12 feet. The sheer size of this project
makes it important to anticipate related issues in advance of the project's
construction. The 2007 segment of this project included a crossing of Prospect Road
at McLaughlin Lane, a crossing of 1-25 at a location north of Prospect and
completion to a point in the vicinity of the Fort Collins Airpark. The 1-25 crossing is
particularly complicated since three irrigation company canal crossings, the Boxelder
Creek crossing, a Boxelder Sanitation District sewer line crossing as well as various
other utility crossings are located in close proximity to one another.
• The White's facilitated several public/private meetings with representatives
from Greeley, Timnath, Boxelder Alliance, City Transportation/Engineering
and Stormwater Departments, the Poudre Valley School District, Boxelder
Sanitation District, CDOT, a group of affected landowners, and others to
discuss details of the project.
• Arranged to have GWET representatives attend several Boxelder Alliance
TAC meetings to coordinate the particularly tight and complex 1-25 crossing
as well as other mutual issues.
• Facilitated meetings with the Timnath Engineer and Timnath GMA developers
to discuss project alignment to minimize impacts to properties in vicinity of
Timnath.
• Worked closely with Poudre Valley School District personnel regarding
crossing of the GWET project across the District's and White's properties.
• The 2007 segment of the GWET pipeline is nearing completion.
4. Amendments to the Structure Plan map and the 1-25 Subarea Plan:
NE Comer Prospect & 1-25, Rezoning and Structure Plan/1-25 Subarea Plan
Amendments
September 20, 2007 P & Z Meeting
Page 9
NORTH 1-25 EIS
• Attended North 1-25 EIS Technical Advisory Committee meetings (usually
was the only member of the public in attendance).
• Participated in all local (Group 7) meetings.
• Organized group of landowners in the neighborhood of 1-25/Prospect and
advised them of interchange issues.
• Met regularly with City Transportation staff as well as CDOT and Felsburg
Holt Ullevig., consultants on the North 1-25 EIS project.
• With City Transportation staff and other property owners, influenced the
proposed alignment and details of the Prospect/1-25 interchange to the
advantage of City.
• Facilitated meetings between North 1-25 EIS and Boxelder Creek Stormwater
Alliance to resolve mutual issues.
• Researched and resolved historic preservation issue with North 1-25 EIS
team.
PROSPECT ROAD IMPROVEMENTS
• Organized group of local property owners concerning issues pertaining to
future Prospect Road improvements.
• Coordinated regularly with City Transportation and Engineering staff.
• Facilitated series of public/private meetings with the City, Timnath Engineer,
and local property owners to address future improvements to Prospect before
they became problems. These issues included:
o Boxelder Creek crossing of Prospect west of 1-25,
o Greeley Water Extension & Transmission Project (GWET) crossing of
Prospect,
o Boxelder Sanitation District sewer crossing of Prospect at McLaughlin
Lane,
o Relocation of Timnath Inlet canal to allow future widening of Prospect,
o Prospect / County Road 5 intersection issues,
o Boxelder Creek stormwater overflow canal crossing of Prospect (the
Grand Canal).
NE Comer Prospect & 1-25, Rezoning and Structure Plan/1-25 Subarea Plan
Amendments
September 20, 2007 P & Z Meeting
Page 8
BOXELDER CREEK REGIONAL STORMWATER ALLIANCE
• Served from the inception of the Boxelder Alliance until present as the
representative for a group of private property owners.
• Was one of 5 groups (Landowners, City, Wellington, Larimer County, Colorado
Water Conservation Board) who EQUALLY funded the stormwater masterplan.
• Served as 1 of 5 voting members on the Technical Advisory Committee (TAC)
which provided overall direction to the Alliance's efforts. The TAC:
o Prepared the Scope of Work for the engineering consultant,
o Selected the engineering consultant,,
o Provided ongoing direction to/coordination with the selected consultant
o Reviewed/commented on work products,
o Held monthly public meetings to discuss progress,
o Participated in weekly/biweekly meetings to complete tasks for the
Alliance,
o Reviewed/commented on final Regional Master Plan,
o Participated in Alliance presentations to Alliance members and town
councils.
• Served as 1 of 5 voting members on the Financial Advisory Committee (FAC).
o FAC was formed to ensure financial feasibility to the engineering options.
o Independently funded legal consultant to the FAC.
o The FAC:
■ Completed funding analyses of the Master Plan alternatives,
■ Researched project financing options,
■ Completed damages & consequences assessments,
■ Developed Funding/Implementation Strategy for final Master Plan,
■ Coordinated with TAC in developing a recommended alternative.
• Prepared list of property owners in vicinity of 1-25/Prospect (400 names) for
public notices.
• Advised local property owners group of Alliance financing issues.
• Coordinated with Alliance members including: Larimer County, Town of
Wellington, the City, Town of Timnath, Town of Windsor, North Poudre Irrigation
Company, Boxelder Sanitation Distirict, New Cache la Poudre Irrigation
Company, Colorado Water Conservation Board, Colorado Department of
Transportation and others.
NE Comer Prospect & 1-25, Rezoning and Structure Plan/1-25 Subarea Plan
Amendments
September 20, 2007 P & Z Meeting
Page 7
o Prospect Road west of interchange to Summit View is $1,000,000 to
1,300,000 (similar exclusions).
o The total, thus, ranges from $30,700,000 to $31,600,000, at a minimum.
• Colorado Department of Transportation (CDOT), the Federal Highway
Administration (FHwA) and the City have little funds to aid in the construction of
this interchange and related street improvements.
• A new interchange is needed to meet the Adequate Public Facilities (APF)
requirement for the new CSU R&D center in the SW quadrant as well as for the
property owner's anticipated project or other developments on the interchange
corners. A new interchange will serve as a "Gateway to CSU", as envisioned by
the University. If the City wishes to have this interchange constructed anytime in
the near future, it will likely need to be funded by a public/private financing
vehicle.
• The 1-25 Subarea Plan and the current Overall Development Plan (ODP) on the
property were developed prior to the current interchange cost projections and
proposed land use changes on the City -owned property becoming available.
Clearly such magnitude of interchange constructions costs and such land use
changes could not have been anticipated.
• Gene Andrist, a financial planner involved with the financing of many
interchanges and other major projects throughout the state, has developed a
number of funding scenarios for public/private financing of the interchange.
Increased levels of retail space at the interchange corners appears to be the key
to provide increased revenue sources to the City to pay for interchange and
related improvements.
• A recent Economic Planning Systems (EPS) study commissioned by the City to
evaluate future retail capacity in the vicinity of Fort Collins, determined that over
the next few years an increase of approximately 1.5 million feet of retail space is
anticipated. The City is in a very competitive market with the Towns of Timnath,
Windsor and Wellington for this retail space. If the City wishes to capture any of
this increased retail space (and its related sales tax) the City needs to move
quickly and aggressively.
The property owners (the Whites) have been very involved is a series of planning
related studies/projects for the interchange, the surrounding area, and along the 1-25
corridor. Listed below is a summary of their involvement:
NE Corner Prospect & 1-25, Rezoning and Structure Plan/1-25 Subarea Plan
Amendments
September 20, 2007 P & Z Meeting
Page 6
Additional Considerations for Quasi -Judicial Rezonings. In determining whether
to recommend approval of any such proposed amendment, the Planning and
Zoning Board and City Council may consider the following additional factors:
(a) whether and the extent to which the proposed amendment is compatible
with existing and proposed uses surrounding the subject land, and is the
appropriate zone district for the land;
(b) whether and the extent to which the proposed amendment would result in
significantly adverse impacts on the natural environment, including, but
not limited to, water, air, noise, stormwater management, wildlife,
vegetation, wetlands and natural functioning of the environment;
(c) whether and the extent to which the proposed amendment would result in
a logical and orderly development pattern.
APPLICANTS REQUEST AND JUSTIFICATION:
The following has been submitted by the applicant as a justification for the rezoning
requests:
• The Prospect / 1-25 interchange was constructed in 1966. Since its construction,
traffic volumes have increased significantly and the interchange structure has
deteriorated.
• A recent North 1-25 Environmental Impact Statement (EIS) team analysis of the
interchange indicates that portions of the interchange are CURRENTLY
experiencing a failing Level of Service (LOS) quality F (failure).
• Furthermore, the EIS team projects increases of roughly 4 times the current
traffic volume for the interchange in the next 20 years.
• North 1-25 EIS projections call for a 200 foot widening of interstate Right -of -Way
(ROW) to accommodate an additional lane of traffic in each direction and
improvements to the on/off ramps and safety lanes. As a result, any
reconstruction of the Prospect interchange must accommodate a wider footprint.
The current interchange ROW will not accommodate this widening.
• Cost estimates/projections for the interchange and Prospect Road improvements
are substantial:
o The projection for the interchange itself is $25,000,000.00 (excluding
ROW acquisition costs).
o Boxelder Creek crossing of Prospect Road. west of interchange is
$3,000,000.
o Prospect Road east of the interchange to County Road 5 is $1,700,000 to
$2,300,000 (excluding design, entitlements, utilities, structures, relocation
of Timnath inlet canal, and CR5/Prospect intersection).
NE Comer Prospect & 1-25, Rezoning and Structure Plan/1-25 Subarea Plan
Amendments
September 20, 2007 P & Z Meeting
Page 5
Prospect interchange was designated as a mix use activity center with
commercial, industrial, and residential uses.
• Employment and industrial districts adjacent to 1-25 are to be designed in
a manner as to maintain a perception of openness through the corridor.
• Secondary uses (retail and highway -oriented commercial uses) typically
permitted in employment/industrial districts will be required to be set back
at least % mile from 1-25 to avoid a commercial strip appearance along I-
25.
• Detached single-family residential development is prohibited within % mile
of 1-25.
• Low density, mixed use neighborhoods are to be concentrated within
mile of Mulberry Street.
• The balance of areas planned for residential development are to be urban
estate developments.
• The City's Resource Recovery Farm is to be preserved as open space.
• The subarea is planned to eventually be served with multi -modal
transportation options. A supplemental street system will facilitate
movement within the subarea, thus, diminishing the need to utilize 1-25 for
short trips.
• Most undeveloped land within the subarea is expected to annex prior to
development.
3. Land Use Code:
The regulations covering rezonings in the City of Fort Collins are contained in Division
2.9 of the Land Use Code. Section 2.9.4 (H) (2) indicates the following:
Mandatory Requirements for Quasi -Judicial Rezonings. Any amendment to the
Zoning Map involving the zoning or rezoning of six hundred forty (640) acres of
land or less (a quasi-judicial rezoning) shall be recommended for approval by the
Planning and Zoning Board or approved by the City Council only if the proposed
amendment is:
(a) consistent with the City Comprehensive Plan; and/or
(b) warranted by changed conditions within the neighborhood surrounding
and including the subject property.
Section 2.9.4 (H) (3) of the Land Use Code indicates the following:
NE Comer Prospect & 1-25, Rezoning and Structure Plan/1-25 Subarea Plan
Amendments
September 20, 2007 P & Z Meeting
Page 4
quadrants immediately adjacent to the Prospect Road/1-25 interchange; Employment
District designations for other areas in the NE, SW, and SE quadrants; Low Density
Mixed -Use Residential designation in the NW quadrant; and Rural/Open Lands and
Stream Corridors designation for other areas in all four quadrants. The Structure Plan
map also identified the need for additional planning in the 1-25 corridor and designated
the area as the " I-25 Special Study Corridor." In addition, City Plan's chapter on
Principles and Policies contained the following:
PRINCIPLE LU-4: More specific subarea planning efforts will follow the adoption
of these City Plan principles and Policies which tailor City Plan's citywide
perspective to individual neighborhoods, districts, corridors, and edges.
Policy LU-4.5 Priority Subareas. The following areas have been identified as
priority for future subarea planning:
• 1-25 Corridor
Concurrent with the development of the 1-25 Subarea Plan, was a multi -jurisdictional
cooperative planning effort to develop the Northern Colorado Regional Communities P
25 Corridor Plan. The planning boundaries of the two efforts overlapped. The regional
plan studied the 1-25 corridor from County Road 52 on the north to an area south of the
Town of Berthod, while the subarea plan studied the area from County Road 52 to
County Road 32 (Carpenter Road). The most significant difference between the two
plans is that the subarea plan dealt with land uses in more detail than the regional plan.
The regional plan was based on existing land use plans of the participating jurisdictions.
The regional plan focused on developing a set of design standards, a transportation
element, and open lands/natural areas policies. The Northern Colorado Regional
Communities 1-25 Corridor Plan was adopted by the City in November 2001.
In 2003, the City adopted the 1-25 Subarea Plan as an element of City Plan. The key
points, conclusions, and policies of the 1-25 Subarea Plan are summarized as follows:
• The 1-25 Subarea Plan mainly deals with the area located east of 1-25 from
around the Prospect Road interchange on the south to County Road 52 on
the north, and County Road 5 on the east.
• No change in the City's GMA boundary was proposed.
• Two activity centers were identified, one at the Mulberry Street
interchange and the other at the Prospect Road interchange. The NE
quadrant of the Mulberry interchange was planned for the potential
location of a regional/community shopping center. The NE quadrant of the
NE Corner Prospect & 1-25, Rezoning and Structure Plan/1-25 Subarea Plan
Amendments
September 20, 2007 P & Z Meeting
Page 3
Again, in summary, the specific plan amendments for this request involve changing 86
acres of industrial to 66 acres of commercial and 20 acres of employment and changing
19 acres of urban estate to employment in the NE quadrant of the Prospect
interchange.
BACKGROUND:
1. The Site:
The adjoining existing zoning and land uses are as follows:
N: C, Commercial and LMN, Low Density Mixed Use Neighborhood, undeveloped
E: County FA-1, Farming, Kitchell Estates, large lot residential subdivision, and UE,
Urban Estate, undeveloped 100 acre parcel owned by the Poudre School District
S: C, Commercial, and County Commercial, partially developed retail and office
uses
W: C, Commercial and E, Employment, mainly undeveloped
The property was annexed into the City of Fort Collins as part of the 235 acre Galatia
Annexation in 1990 and zoned HB, Highway Business, IP, Planned Industrial, and RLP,
Low Density Planned Residential Districts. All of the zoning districts had a Planned Unit
Development (PUD) zoning condition attached which required development proposals
to be reviewed against the criteria of the Land Development Guidance System (LDGS)
which was the City's PUD ordinance at the time.
In 1997, the 235 acres of the Galatia Annexation were rezoned as part of the City Plan
comprehensive community rezoning. The 30 acres of HB, Highway Business was
rezoned C, Commercial; the 86 acres of IP, Planned Industrial was rezoned I, Industrial;
and the 119 acres of RLP, Low Density Planned Residential was rezoned UE, Urban
Estate. The HB, IP, and RLP Districts were eliminated from the Land Use Code in
1997. No parcels were rezoned as a result of adoption of the 1-25 Subarea Plan in
2003.
Approximately 100 acres of the 119 acres zoned UE is currently owned by the Poudre
School District. The property is undeveloped, but will likely be used for athletic fields
and school bus storage.
2. City Plan and the 1-25 Subarea Plan
In 1997, the City adopted City Plan as City's the new Comprehensive Plan. The
Structure Plan map showed Commercial Corridor land use designations in all four
NE Corner Prospect & 1-25, Rezoning and Structure Plan/1-25 Subarea Plan
Amendments
September 20, 2007 P & Z Meeting
Page 2
from UE, Urban Estate to E, Employment to create a 39 acre E zoned buffer between
the C, Commercial zoned area (96 acres) and residential areas to the north and east.
The review of land uses and zoning around the Prospect Road/1-25 interchanged is
based on:
1. City Council direction indicating the Council's general preference for a higher
level of "commercial" use for portions of the former Resource Recovery Farm
property located in the SW quadrant of the Prospect Road/1-25 interchange.
2. Simultaneously, the City received a rezoning request from the owners of property
in the NE quadrant of the Prospect Road/1-25 interchange requesting a change in
zoning of 86 acres of I, Industrial to 66 acres of C, Commercial, and 20 acres of
E, Employment. .
Staff decided to review the land uses around the interchange as a result of the rezoning
requests from the City and the private property owner to determine what would be the
best land use pattern for the area around the interchange for the City as a whole,
independent of the specific rezoning requests. The amendments to the plans are
related to the rezoning requests but are independent actions. If the amendments to the
plans are approved, the rezoning requests are simply implementation actions to the
plan amendments.
The fundamental policy issue to be addressed in this rezoning request: should City
plans be amended and zoning changed to allow for the development of a
regional/community scale shopping center in the NE quadrant of the Prospect Road/1-25
interchange? A regional/community shopping center in the NE quadrant will help
contribute tax revenues necessary to fund Prospect Road/1-25 interchange
improvements and related infrastructure. Given the cost to development from all four
quadrants around the interchange will need to contribute funding to improve the
interchange.
The rezoning needs to be viewed independently from the City's Adequate Public
Facilities (APF) requirements: All development plans for parcels impacting the Prospect
interchange must include a Transportation Impact Analysis (TIA). The TIA will
determine whether traffic generated by the development will result in reduced level of
service (LOS) at the interchange and the physical improvements that will need to be
constructed to mitigate the impacts. In order to begin construction, all development
must either build the improvement or have funding appropriated that will cover
improvement costs.
ITEM NO. 6
MEETING DATE 9/20/07
STAFF Ken Waido
(amw.-M.)
Citv of Fort Collins PLANNING AND ZONING BOARD
STAFF REPORT
PROJECT: NE Corner of East Prospect Road and 1-25 Rezoning and
Amendments to the 1-25 Subarea Plan and the City Plan
Structure Plan Map - #16-07
APPLICANT: Land Acquisition and Management, LLC
7200 S. Alton Way Suite B 150
Centennial, CO 800012
OWNERS: Same
PROJECT DESCRIPTION:
This is a request to amend the 1-25 Subarea Plan and the City Plan Structure
Plan map, and rezone 86 acres located at the northeast corner of East Prospect
Road and Interstate 25.
The current Structure Plan designation for the 86 acre area is Industrial District.
The current 1-25 Subarea Plan designation for the area is also Industrial District.
The applicant proposes a Structure Plan amendment and amendments to the I-
25 Subarea Plan to change the area into additional Commercial Corridor and
Employment District designations with corresponding rezonings to the C,
Commercial District and the E, Employment District.
RECOMMENDATION: Approval of the amendments to the 1-25 Subarea Plan
and the City Plan Structure Plan map and the rezoning of 86 acres of I, Industrial
to 66 acres of C, Commercial and 20 E, Employment, as requested by the
applicant. Staff also recommends that an additional 19 acre parcel, owned by
the applicant, be rezoned from UE, Urban Estate to E, Employment to create a
39 acre E zoned buffer between the C, Commercial zoned area (a total of 96
acres) and residential areas to the north and east.
EXECUTIVE SUMMARY:
Staff is recommending changes to the 1-25 Subarea Plan and the City Plan,
Structure Plan map and the rezoning of 86 acres into 66 additional acres C,
Commercial District (for a total of 96 acres of C, Commercial zoning) and 20
acres E, Employment District. Staff also recommends that an additional 19
COMMUNITY PLANNING AND ENVIRONMENTAL SERVICES 281 N. College Ave. P.O. Box580 Fort Collins, CO80522-0580 (970)221-6750