Loading...
HomeMy WebLinkAboutWATERFIELD THIRD FILING - FDP - FDP140006 - CORRESPONDENCE - OTHER WATER AND OR SANITATION DISTRICTSWaterfield 3rd Filing Northern Engineering - Cody Snowdon Utility Plan Review #2 — BSD Review Comments Summary Eric Garner, PE — District Engineer SheetSS7 • Sanitary Sewer Line B2 - Waterline at STA 10+10.00 is above grade, revise. • Sanitary Sewer Line B3 — Add MJ cap to stub from SSMH 63-1. SheetSS8 • Waterline at STA 10+10.00 is above grade, revise. Sheet SS9 • Plan view call out for SSMH 134-6 is missing. SheetSS11 • Waterline at STA 10+22.78 is above grade, revise. • Inverts in and out of SSMH 135-1.4 are incorrect, revise. April 29, 2014 2 I i Waterfield 3`d Filing April 29, 2014 Northern Engineering - Cody Snowdon Utility Plan Review #2 — BSD Review Comments Summary Eric Garner, PE — District Engineer Sheet CS2 • Boxelder General Notes are missing. The notes on the sheet are ELCO Notes. Add Boxelder General Notes. Sheet EX2 • Spelling error— callout for existing sanitary sewer middle of sheet. See redlines. Sheet PH1— PH4 • Note 3 — add "Boxelder Sanitation District' after the word per. Sheet U3 • Letter overlap at Lot 6 and SSMH A4-1. Sheet SS1 • Existing MH PDI 0750 — note indicates a new precast manhole base. You intend to reset the manhole barrels? It is acceptable add callout to create new flowline and to link seal and grout new connection. • SSMH A5 — raise RIM to proposed grade. Sheet SS2 • Missing sewer callouts in plan view • The P&P layout is easier to read, thank you. Sheet S54 • Missing sewer callouts in plan view for segment A4 SheetSSS • SSMH PDI 0800 (SSMH 82) —Confirm you intend that a flowline be constructed to accommodate the 1.63FTvertical difference. • Stationing missing in plan view at SSMH PDI 0780 and PDI 0790. Sheet SS6 • Waterline at STA 19+53.61 is above grade, revise. 1 April 30, 2014 Mr. Cody Snowdon Northern Engineering 200 South College Ave, Suite 010 Fort Collins, Colorado 80524 Re: Waterfield 3r0 Filing 2nd Review Dear Mr. Snowdon: Plans for the above referenced development were received at Boxelder Sanitation District (District) April 15, 2014. District staff have reviewed and redlined the drawings. District comments communicated with redlines, however, we have attached a written version of redline comments for reference. Sheet # Comment Utility See attached plan and profile comments. Plans See attached written version of redline notes. Please return BSD redlines with future submittals to aid in our back -checking of the revised drawings. I hope these comments and redlines are clear enough to be easily addressed in a revision to these plans. If there are questions, please contact me at 970-498-0604. enc: redline notes, 2 pages S:IOEVELOPMEM1BasinslWest_BasinlPoudre-Interceptor-SubbasinlWaterfteld-BUIIRun12014 Utility Plan RevievA2014-04-30 Watertteld 3rd Fling Plan Review V LeBer.doc 3201 East Mulberry, Unit Q - P.O. Box 1518 • Fort Collins, Colorado 80522 Phone (970) 498-0604 9 Fax (970) 498-0701 • www.boxeldersanitation.org