Loading...
HomeMy WebLinkAboutWATERFIELD THIRD FILING - FDP - FDP140006 - CORRESPONDENCE - PRIVATE ENTITIESYours very truly, THE DOW L W FIRM, LLC MS/bs ;Mayo Sommermeyer cc: Donn Engel Ripley Design, Inc.: Stephanie Sigler Parker Land Investments, LLC: Jim Dullea Curly Rishell Steve Nichols Northern Engineering: Nick Haws, PE, LEED AP TIMOTHY 1. DOW, MBA, m PATRICIA T. DOW, CPA. JD, LLM* ASHLEY A. PERKINS, MA, JD MAYO SOMMERMEYER, LLC OF COUNSEL Via email: tshepard@fcgov.com City of Fort Collins Current Planning C/o Ted Shepard P.O. Box 580 Fort Collins, CO 80522-0580 THE DOW LAW FIRM, LLC ATTORNEYS AND COUNSELORS AT LAW P.O. BOX 1578 FORT COLLINS, COLORADO 80522-1578 (970)498-9900 FAX: (970) 498-9966 E-MAIL: dow®dowlawfirmcom March 7, 2014 Re: Waterfield Third Filing FDP140006 Waterfield Dear Mr. Shepard: # 5 CLOCK TOWER SQUARE 323 SOUTHCOLLEGE AVENUE FORT COLLINS, COLORADO 80524 AM ADmnIED To mAMCE uw IN Nmxn su I represent the Larimer & Weld Irrigation Company whose irrigation ditch borders the northerly portion of this proposed Waterfield Third Filing. We've made previous comments concerning the maintenance of a 25 foot easement and access road along the south side of the ditch which I believe has been complied with. This is the historic easement that we have always had and require for the operation maintenance of the ditch which needs to be kept free of all obstructions and paving. The main purpose of this letter is to address the irrigation lateral offtake which is several hundred feet west of Timberline. This long existing "No. 10 Lateral" is being apparently relocated via a 24inch sdr 32.5 pvc irrigation line. I believe it shows an offtake from the main irrigation ditch as a "proposed junction boxed (type "c")". I do not find any additional details. The developer needs to know that the offtake off the big ditch is within our property and our jurisdiction. Any activity concerning that structure needs to be done with our approval. After quickly perusing the 112 pages of drawings supplied to me, I do not find in the plans what a junction boxed (type "c") looks like, and if I missed it, I am sorry. The irrigation company wants an appropriate structure put in there so that the flow off the ditch can be regulated, and we also want a measuring device at the ditch offtake. We will be happy to work with the developer or the developer's representative in finalizing the details concerning this proposed work that is going to be done on our ditch. Thank you for your attention to this matter, and I will await hearing from someone.