HomeMy WebLinkAboutFRONT RANGE BAPTIST CHURCH & ACADEMY - FDP - 2-05B - CORRESPONDENCE - REVISIONS4. Please read the last erosion control note you have on your plan, then decide
whether or not it should be there.
Response:
Not applicable to our plans.
5. The pond outlet pipe should be protected by a sediment trap (gravel filter), not straw
bales.
Response:
Not applicable to our plans.
Second Review
November 29, 2005
1. The detention pond should be better designated as a sediment trap during
construction.
Response:
We have shown this on our plans.
2. Please provide required calculations including project surety.
Response:
We have included calculations for your review.
Department: Stormwater-Water-Wastewater Issue Contact: Roger Buffington
Topic: General
Number: 60 Created: 11 /30/2005
[11/30/05] No further comments.
Please give me a call at 419-1307 if you have any questions
Sincerely:
Sam Eliason, P.E.
Senior Engineer
Nolte Associates
Page 5
Response:
We have added this to our plans.
Department: Stormwater-Water-Wastewater Issue Contact: Basil Harridan
Topic: Details
Number: 58 Created: 11 /29/2005
[11/29/05] Please provide a detail for the proposed curb chase.
Response:
We have added details for curb opening and curb channel to sheet DT01.
Topic: Easements
Number: 7 Created: 9/6/2005
[11 /29/05]
[9/6/05] Please provide an easement for the proposed/existing detention pond on this site.
Response:
We have shown this on our plans.
Topic: Erosion Control
Number: 57 Created: 11 /29/2005
[11 /29/05]
1. In the report, change the verbiage to state that the silt fencing shown on the plan shall
be installed prior to any grading on the site.
Response:
Not applicable to our plans.
2. The silt fencing shown on the plan should be extended further to the west and
shown as rounding the corner and going north for a few feet. Also, why are you
protecting the southern end of the project with silt fencing but not the swale on the
east side (Miramont Office Park)?
Response:
Not applicable to our plans.
3. In the report, at the end of your statement "...the ponds berms and Swale shall be
seeded and mulched immediately after construction..." add the phrase "...but in no
case shall any area remain unseeded and mulched for more than 30 days." This
note about reseeding and mulching needs to be added to the plan. What's going to
happen to the rest of the graded site, turf grass? If so, please add this to your
notes also.
Response:
Not applicable to our plans.
Page 4
Response:
We have adjusted overlapping labels to provide more clarity.
Number: 50 Created: 11 /25/2005
[11/25/05] The scale on the grading sheets in the title block is 1"=20', actual scale is 1"=30'.
Response:
Thank you, we have changed our plans.
Number: 51 Created: 11 /25/2005
[11/25/05] Vicinity maps on both cover and drainage and erosion control sheets will not
scan properly. Use pure black and white color scheme, no grayscale.
Response:
We have updated our plans.
Number: 52 Created: 11 /25/2005
[11/25/05] Add standard drawing 1601 to details.
Response:
We have added this detail to our plans.
Number: 53 Created: 11 /25/2005
[11/25/05] Provide district signature block on DT01 and DT02 sheets.
Response:
District signature has been added to all the plan sheets.
Number: 54 Created: 11 /25/2005
[11/25/05] Indicate type 3 barricade where walk terminates.
Response:
On sheet EXO1, we have added note 29: existing type 3 barricade is to remain in place.
Number: 55 Created: 11 /25/2005
[11/25/05] Spot elevations shown around drive access curb return should be labeled. (TOC
or FL?) FL slope in gutter should be 0.5% minimum.
Response:
Thank you, we have changed our plans to allow 0.5% minimum. Note 1 reads that all spot
elevations are to flowline, unless noted otherwise.
Number: 56 Created: 11 /25/2005
[11/25/05] Show radii through emergency access on both site plan and utility plan.
Page 3
Response:
We have added this to our plans.
Number: 43 Created: 11 /25/2005
[11/25/05] Existing utilities and existing contours are too light for scanning. Please refer to
LCUASS Appendix E-6 for scanability requirements, or talk with technical services regarding
minimum gray color.
Response:
Minimum grayscale has been adjusted to meet LCUASS requirements. Paper copies are
made from an outside company and they end up a little lighter than the originals. Final
mylars should be dark enough, but will coordinate with technical services before submitting
mylars to make sure
Number: 44 Created: 11 /25/2005
[11/25/05] Show and label the drainage easement in the south parking area on the utility
sheet.
Response:
We have added this to our plans.
Number: 45 Created: 11 /25/2005
[11/25/05] Please label any emergency access easement as such- refer to redlines.
Currently labeled as just "access" easement.
Response:
We have added this to our plans:
Number: 46 Created: 11 /25/2005
[11/25/05] Electric connection to the proposed building is not shown.
Response:
Gas and Electrical connections to the building have been shown in their approximate
location. The final location of the gas, electrical, telephone, and cable will be coordinated
with the respective utility companies at a later time.
Number: 47 Created: 11 /25/2005
[11/25/05] The note about sidewalk locations allowed to be adjusted (#6 on grading and
paving notes) is not allowable as written. What is the intent? The city must be involved in
approval of plan changes, especially any relating to pedestrian activity. Please revise on
both grading sheets.
Response:
We have removed this note from our plans.
Number: 48 Created: 11 /25/2005
[11/25/05] Adjust overlapping labels on the grading plan.
Page 2
February 23, 200P'(
Ted Shepard
City of Fort Collins
Current Planning Department
P.O. Box 580
Fort Collins, CO 80522
RE: Front Range Baptist Church — Second round FCP comment responses
Dear Ted,
Included below are the comments received from City Staff on December 2, 2005. An
explanation (in italics) of how issues have been addressed follows each comment.
ISSUES:
Department: Engineering Issue Contact: Dan DeLaughter
Topic: Easements
Number: 29 Created: 9/8/2005
(11/25/05]
[9/8/05] Drainage and Utility easements and ROW must be dedicated by separate
documents which are to be provided prior to approval of the plans.
Response:
Drainage, Utility, and Fire Access Easements will be dedicated by separate document and
provided prior to approval of final plans.
Topic: General
Number: 22 Created: 9/8/2005
[11/25/05] Please provide a copy of the agreement with the bank for construction of the
offsite sidewalk connection.
[9/8/05] All proposed grading should tie in to existing contours- offsite easements with letter
of intent received prior to hearing would be required if offsite grading is to be done.
Response:
The offsite sidewalk and grading has been removed from our plans.
Number: 28 Created: 9/8/2005
[11/25/05) An estimate for sidewalk cost will be needed.
[9/8/05] North sidewalk along Harmony should be built out to property line or funds must be
provided to the city for future construction.
Response:
Sidewalk Estimate: 7'x16.30' = 114 sf @ $3/sf = $342
Number: 41 Created: 11 /25/2005
[11/25/05] Reference the nearest 2 benchmarks on the cover sheet.
Page 1