HomeMy WebLinkAboutFRONT RANGE BAPTIST CHURCH & ACADEMY - FDP - 2-05B - CORRESPONDENCE -southern end of the project with silt fencing but not the swale on the east side (Miramont
Office Park)?
3. In the report, at the end of your statement "...the ponds berms and swale shall be
seeded and mulched immediately after construction..." add the phrase "...but in no case
shall any area remain unseeded and mulched for more than 30 days." This note about
reseeding and mulching needs to be added to the plan. What's going to happen to the rest
of the graded site, turf grass? If so, please add this to your notes also.
4. Please read the last erosion control note you have on your plan, then decide whether
or not it should be there.
5. The pond outlet pipe should be protected by a sediment trap (gravel filter), not straw
bales.
Second Review
November 29, 2005
1. The detention pond should be better designated as a sediment trap during
construction.
2. Please provide required calculations including project surety.
Department: Stormwater-Water-Wastewater Issue Contact: Roger Buffington
Topic: General
Number: 60 Created: 11 /30/2005
[11/30/05] No further comments.
There will be no need to submit for another formal round of review for the next submittal.
Instead, please contact Dan Delaughter, Engineering and Basil Hamdan, Stormwater
directly with revised prints prior to bringing in signed mylars.
If you have any questions regarding these issues or any other issues related to this project,
please feel free to call me at (970) 221-6750.
Sincerely:
/�
Ted Shepard
Chief Planner
Page 3
Number: 47 Created: 11 /25/2005
[11/25/05] The note about sidewalk locations allowed to be adjusted (#6 on grading and
paving notes) is not allowable as written. What is the intent? The city must be involved in
approval of plan changes, especially any relating to pedestrian activity. Please revise on
both grading sheets.
Number: 48 Created: 11 /25/2005
[11/25/05] Adjust overlapping labels on the grading plan.
Number: 50 Created: 11/25/2005
[11/25/05] The scale on the grading sheets in the title block is 1"=20', actual scale is 1"=30'.
Number: 51 Created: 11 /25/2005
[11/25/05] Vicinity maps on both cover and drainage and erosion control sheets will not
scan properly. Use pure black and white color scheme, no grayscale.
Number: 52 Created: 11 /25/2005
[11/25/05] Add standard drawing 1601 to details.
Number: 53 Created: 11 /25/2005
[11/25/05] Provide district signature block on DT01 and DT02 sheets.
Number: 54 Created: 11 /25/2005
[11/25/05] Indicate type 3 barricade where walk terminates.
Number: 55 Created: 11 /25/2005
[11/25/05] Spot elevations shown around drive access curb return should be labeled (TOC
or FL?) FL slope in gutter should be 0.5% minimum.
Number: 56 Created: 11 /25/2005
[11/25/05] Show radii through emergency access on both site plan and utility plan.
Department: Stormwater-Water-Wastewater Issue Contact: Basil Harridan
Topic: Details
Number: 58 Created: 11/29/2005
[11/29/05] Please provide a detail for the proposed curb chase.
Topic: Easements
Number: 7 Created: 9/6/2005
[11 /29/05]
[9/6/05] Please provide an easement for the proposed/existing detention pond on this site.
Topic: Erosion Control
Number: 57 Created: 11 /29/2005
[ 11 /29/05]
1. In the report, change the verbiage to state that the silt fencing shown on the plan shall
be installed prior to any grading on the site.
2. The silt fencing shown on the plan should be extended further to the west and shown
as rounding the corner and going north for a few feet. Also, why are you protecting the
Page 2
STAFF PROJECT REVIEW
City of For[ Collins
CITYSCAPE URBAN DESIGN Date: 12/02/2005
CHRIS WHITTED
3555 STANFORD ROAD SUITE 105
FORT COLLINS, CO 80525
Staff has reviewed your submittal for FRONT RANGE BAPTIST CHURCH & ACADEMY
PDP AND FINAL PLANS - TYPE ll, and we offer the following comments:
ISSUES:
Department: Engineering Issue Contact: Dan DeLaughter
Topic: Easements
Number: 29 Created: 9/8/2005
[ 11 /25/051
[9/8/05] Drainage and Utility easements and ROW must be dedicated by separate
documents which are to be provided prior to approval of the plans.
Topic: General
Number: 22 Created: 9/8/2005
[11/25/05] Please provide a copy of the agreement with the bank for construction of the
offsite sidewalk connection.
[9/8/05] All proposed grading should tie in to existing contours- offsite easements with letter
of intent received prior to hearing would be required if offsite grading is to be done.
Number: 28 Created: 9/8/2005
[11/25/05] An estimate for sidewalk cost will be needed.
[9/8/05] North sidewalk along Harmony should be built out to property line or funds must be
provided to the city for future construction.
Number: 41 Created: 11 /25/2005
[11/25/05] Reference the nearest 2 benchmarks on the cover sheet.
Number: 43 Created: 11 /25/2005
(11/25105] Existing utilities and existing contours are too light for scanning. Please refer to
LCUASS Appendix E-6 for scanability requirements, or talk with technical services regarding
minimum gray color.
Number: 44 Created: 11 /25/2005
[11/25/05] Show and label the drainage easement in the south parking area on the utility
sheet.
Number: 45 Created: 11 /25/2005
[11/25/05] Please label any emergency access easement as such- refer to redlines.
Currently labeled as just "access" easement.
Number: 46 Created: 11/25/2005
[11/25/051 Electric connection to the proposed building is not shown.