September 6, 2005
Mr. Ted Shepard
City of Fort Collins R
P.O. Box580 DES QED
Fort Collins,. CO 80525f
?l105
RE: #2-05A Front Range Baptist Church & Academy PDP — Type II CURRENT PANNING
Dear Mr. Shepard,
The Fort Collins - Loveland Water District and the South Fort Collins Sanitation have reviewed the
above mentioned project and submit the following comments.
The District signature block needs to be replaced with the District's current signature block. The
cad file can be obtained by contacting Ms. Sue Vest, Engineering Technician, at 226-3104,
extension 18.
General note #5 needs to be corrected to indicate that all water line construction and
workmanship shall conform to the most current Fort Collins — Loveland Water District
specifications.
General note #13 needs to be corrected to indicate the minimum and maximum cover over the
water line is 5 feet and 6 feet respectively.
On sheet UTO1, the size of the water service line and meter is to be shown.
On sheet UTO1, note #I is to be deleted.
The District requires a Back -Flow -Prevention -Device with flow detection on the fine line.
Please do not hesitate to contact me at 226-3104, ext. 14, if you have any questions or require additional
information.
Respectfully,
r
Mr. Te W. Flarri�ll, P.E.
District Engineer
xc: Mr. Michael D. DiTullio, District Manager
Mr. Samuel Eliason, P.E., Nolte Associates, Inc.
5150 Snead Drive, Fort Collins, CO 80525 Phone (970) 226-3104 Fax (970) 226-0186
Comments from Current Planning are on the redlined sheets.
Be sure and return all of your redlined plans when you re -submit.
If you have any questions regarding these issues or any other issues related to this project,
please feel free to call me at (970) 221-6750.
Sincerely:
T
Ted Shepard
Chief Planner
Page 4
Number: 10 Created: 9/6/2005
[9/6/05] A 6' walkway needs to be provided along the drive access from Boardwalk. 3.2.2
(C) (5) (a)
Number: 11 Created: 9/6/2005
[9/6/05] Access ramps for all handicap parking need to be shown on plans.
Number: 12 Created: 9/6/2005
[9/6/05] Sidewalk access ramps need to be provided for the south parking area.
Number: 13 Created: 9/6/2005
[9/6/05] In the long term access from Harmony will be lost, with Boardwalk being the
primary access to the site.
Department: Water Wastewater Issue Contact: Roger Buffington
Topic. Utility plans
Number: 15 Created: 9/7/2005
[9/7/05] Add note on connection of sewer service at manhole (i.e. Core drill opening in MH,
grout...........).
Number: 16 Created: 9/7/2005
[9/7/05] Show existing water service.
Number: 17 Created: 9/7/2005
[9/7/05] Include standard details.
Number: 18 Created: 9/7/2005
[917/05] Is there a utility easement on the bank property adjacent to the sewer service?
Department: Zoning Issue Contact: Peter Barnes
Topic: zoning
Number: 2 Created: 8/30/2005
[8/30/05] A sidewalk ramp needs to be provided for the northernmost handicap parking
space in such a manner that a person does not have to walk or be in a wheelchair in the 24'
drive aisle.
Number: 3 Created: 8/30/2005
[8/30/05] This is in the residential neighborhood sign district. Need to show proposed
locations of any possible wall signs. (Only one sign allowed per wall).
Number: 4 Created: 8/30/2005
[8/30/05] Need bike parking. Show bike rack(s).
Number: 5 Created: 8/30/2005
[8/30/05] Show parking lot light pole locations on site plan. Also, their narrative states that
they've lowered the lights, etc. They need to add another General Note to sheet 2 of 7
regarding light fixtures being down directional, and include the new height.
Number: 6 Created: 8/30/2005
[8/30/05] Provide a detail of the trash enclosure, or a note explaining its height, materials,
gate, etc.
Page 3
Number: 28 Created: 9/8/2005
[9/8/05] North sidewalk along Harmony should be built out to property line or funds must be
provided to the city for future construction.
Department: Light & Power
Topic: General
Number: 1
[8/18/05] No comments
Department: Natural Resources
Topic: General
Number: 8
[9/6/05] No issues.
Issue Contact: Doug Martine
Created: 8/18/2005
Issue Contact: Doug Moore
Created: 9/6/2005
Department: Stormwater Utility Issue Contact: Basil Hamdan
Topic: Drainage
Number: 30 Created: 9/9/2005
[9/9/05] Please add a note to the drainage and grading plans stating that all drainage from
the roof of the new building will be directed to the south.
Topic: Easements
Number: 7 Created: 9/6/2005
[9/6/05] Please provide an easement for the proposed/existing detention pond on this site.
Topic: Grading Plan
Number: 32 Created: 9/9/2005
[9/9/05] How will the swale between the new building and the bank be graded. Will there be
any grading needed to be done on the bank property in order to construct that swale ?
Show the property line on the swale cross section.
Please make sure that no additional flows will affect neighboring properties by the proposed
grading of the parking lots.
Topic: Landscape Plan
Number: 31 Created: 9/9/2005
[9/9/05] The proposed street trees along Harmony do not meet the minimum tree
separation requirement of 10 feet. Is this the only location that these trees can be located?
If they are moved to be behind the sidewalk and the 10 foot minimum cannot be met we will
need to coordinate with other utilities as to where these trees can be placed.
Topic: Water Quality
Number: 33 Created: 9/9/2005
[9/9/05] At Final please provide a water quality pond outlet detail.
Department: Transportation Planning Issue Contact: Kurt Ravenschlag
Topic: General
Number: 9 Created: 9/6/2005
[9/6/05] Sidewalk along Harmony needs to be extended to the west property line.
Page 2
STAFF PROJECT REVIEW
City of Fort Collins
CITYSCAPE URBAN DESIGN Date: 09/12/2005
JOE CARTER
3555 STANFORD ROAD SUITE 105
FORT COLLINS, CO 80525
Staff has reviewed your submittal for FRONT RANGE BAPTIST CHURCH & ACADEMY
PDP - TYPE 11, and we offer the following comments:
ISSUES:
Department: Engineering Issue Contact: Dan Del-aughter
Topic: Easements
Number: 21 Created: 9/8/2005
[9/8/05] A utility easement is required for the meter pit on the north side of the proposed
building. It may be possible to move it into the existing easement.
Number: 25 Created: 9/8/2005
[9/8/05] All easements must be shown on the plans. Detention ponds must be included in a
drainage easement.
Number: 29 Created: 9/8/2005
[9/8/05] Drainage and Utility easements and ROW must be dedicated by separate
documents which are to be provided prior to approval of the plans.
Topic: General
Number: 20 Created: 9/8/2005
[9/8/05] Change line type for existing features to dashed or ghosted line. It's difficult to tell
what is existing and what is proposed.
Number: 22 Created: 9/8/2005
[9/8/05] All proposed grading should tie in to existing contours- offsite easements with letter
of intent received prior to hearing would be required if offsite grading is to be done.
Number: 23 Created: 9/8/2005
[9/8/05] Street trees on Harmony should be placed closer to the sidewalk in order to
accommodate future expansion of Harmony Rd. Coordinate with utilities to provide
adequate spacing from utility lines.
Number: 24 Created: 9/8/2005
[9/8/05] If possible, show more detail on eastern access to site. Include bank parking and
drive to show how you are tying in.
Number: 26 Created: 9/8/2005
[9/8/05] If curb cut is done on north access from Harmony, it must be done according to city
standards. Please refer to Detail #707.
Number: 27 Created: 9/8/2005
[9/8/05] North access should be constructed with concrete at least to the back of the
sidewalk.