HomeMy WebLinkAboutFRONT RANGE BAPTIST CHURCH & ACADEMY - PDP - 2-05A - CORRESPONDENCE - SITE, LANDSCAPE & ELEVATIONS PLANSr
TIME: 7,18 pm DATE 05,/25/05 PATH: N \fcbcVJ\COdd\ET\ -
SERVER:: NONE SERVICE NONE DRAWING NAME: ET-PLAT.DWG
N 114 COR. SEC, 1, T6N, R69W
FOUND 2 112 ALUM CAP IN RANGE BOX °
STAMPED LS 14820 e ,
_----
vtsy its 54 "E 2652. 17
NORTH LINE NE 1/4 SEC 1
LAJ,
_
T
Q).
HARMONY ROAD
o �
ESTIMATED ROADWAY CENTERLINE
z
70.5'-- — --- EXISTING PROPERTY LINE
82.5'
--�
S 86'16'O6"E T
348.40'
-'f
x.......
.
25' UTILITY, DRAINAGE, PED.
I
LANDSCAPE AND SIDEWALK
EASEMENT REC.# 2003-0032118
EXISTING BACK OF SIDEWALK
V'
0
0
DEDICATED RIGHT OF WAY
DEDICATED 15' UTILITY ,EASEMENT
I
"E
20' SETBACK LINE
Ln
Ln IR
CR M
FRONT RANGE BAPTIST CHURCH AND ACADEMY
SHEET NUMBER
NOL7"E
RIGHT OF WAY EXHIBIT
B E Y 0 N 0 E N 0 I N E E R I N O
OF 1 SHEETS
am >1NUIr POUT mwL am A.
97022U4W TEL names FAX
I'm cmuN, co' e06xs
mraTI
PREPARED FOR: CITY OF FORT COLLINS DATE SUBMITTED: 5/25/2005
JOB NUMBER
FCB0163
_ _ -.._ �_ _� _. a Pe 1
Ted Shepard Front Range Baptist Chi'_9-. .
From: "Joe Carter" <joe@cityscapeud.com>
To: <tshepard@fcgov.com>
Date: 05/26/2005 2:19:45 PM
Subject: Front Range Baptist Church
Ted -
Over the last week or so we've been working with both the CoFC Engineering
Department and some utility providers on the Front Range Baptist Church
site. One of the issue/questions that has come up is the building setback.
We believe we've come to an agreement on the ROW location with Katie Moore
and established the correct 15' utility easement necessary along arterial
roads. The last issue is the setback.
The Harmony Corridor allows you as the planner to determine the location of
the building setback west of Boardwalk. We are proposing a 20' setback from
the future ROW. This will allow for a 15' utility easement, a 5' setback
from the UE and enough room to set the building in a suitable location for
our needs. Please see the attached drawing.
I can try to estimate the distance from the future curb line to the north
face of the building if that would help you make a determination. I will be
at your office at 4:30 today to meet with Anne. If you have a moment, I
would like to talk to you about this at 4:15.
Thanks
Joe Carter
Landscape Architect
Cityscape Urban Design
3555 Stanford Road, Ste. 105
Fort Collins, CO 80525
(970)226-4074 phone
(970) 226-4196 fax
joe@cityscapeud.com
http://www.cityscapeud.com/
-----Original Message -----
From: Eliason, Sam [mailto:sam.eliason@nolte.com]
Sent: Wednesday, May 25, 2005 7:48 PM
To: Joe Carter
Subject: FRBC - Right of Way Exhibit
Joe,
Here is the right of way exhibit with the 15' utility easement and a 20'
setback. I took a look at the setbacks for the building and it looks like
we are in great shape for a 120' wide building. We can provide a 20'+
setback from our proposed right of way line so everyone should be happy.
Thanks for coordinating the meeting with Katie today.
«ET-Plat-Layout2.pdf>> «ET-Plat.dwg>>
Sam Eliason, PE