HomeMy WebLinkAboutFRONT RANGE BAPTIST CHURCH & ACADEMY - PDP - 2-05A - SUBMITTAL DOCUMENTS - ROUND 1 - PLANNING OBJECTIVESVII. Conflict Mitigation
The only potential conflict with the site could be the site lighting and the parking lot
screening. The site lighting was noted as an issue by a neighbor. The PDP removed the existing
substandard light fixtures (flood type fixtures) and reestablishes lower height and less intense
down directional cut-off fixtures. The parking lot at the southern end of the property utilizes the
existing 4-5' high berm and landscaping for screening. A hedge is proposed along the only
section of the western property line that does not currently have heavy screen plantings and
privacy fencing.
Vill. Development Phasing
Development of the site is scheduled begin in Spring 2006.
Thank you for the opportunity to provide a narrative for this project.
II. Open Space & Circulation Systems
The existing detention pond is the only retained outdoor open space area for both active
and passive recreation. The existing playground has been retained for Academy use. Outdoor
entry plazas have been enhanced and connected via sidewalk to both the proposed parking on
site and Harmony Road.
III. Ownership & Maintenance
All areas within the Limits of Development at Front Range Baptist Church & Academy will
be owned and maintained by the church.
IV. Estimated Employment
It is estimated that the church will employ no more than 15 people. Currently there are 7
employees on staff.
V. Planning Rationale & Assumptions
Front Range Baptist Church & Academy is planned as an expansion of both a church
and school to better serve the Fort Collins community. Parking areas were established along the
west and southern areas of the site to maximize buildable area while allowing for screening.
Where parking lots are adjacent to residential and office uses, berming and landscaping is used
as screening. Pedestrian and vehicular circulation was accommodated by sensible vehicular
routes and defined sidewalks.
The design attempts to create a campus around the existing buildings. Vehicular
circulation separates itself from parking areas to provide a safer environment for pedestrians.
The access along Harmony Road will be retained as a full movement intersection in the short
term and a right-in/right-out movement intersection in the long term.
VI. Applicable Criteria
The uses proposed at Front Range Baptist Church & Academy include:
- A single 20,484 sf expansion (one building) with a gym / sanctuary space
- Parking to accommodate 700 members
The plan will require a modification of standard to allow the building to be setback slightly
beyond the build -to -line along Harmony Road. The right-of-way along Harmony Road has been
established along the front of walk. A 15' utility easement and grade issues have required the
building to be pushed further back on the site. The modification will request that the building be
30 to 35 feet from the proposed right-of-way.
The Harmony Oaks palette was used when designing the street tree plantings long
Harmony Road. The site plan, parking lot design, and landscape plan attempt to be sensitive to
the surrounding neighborhood and adjacent office uses.
3555 Stanford Road, suite 105
Fort Collins, Colorado 80525
Phone: (970) 2z6-4074
Fax: (970) 226-4196
www.cityscapeud.com
e@cityscapeud.com
Front Range Baptist Church & Academy
Project Development Plan
Statement of Planning Objectives
August 16, 2005
The Front Range Baptist Church & Academy is located on - 9.10 acres at 625 E.
Harmony Road. This site is on the south side of East Harmony Road and west of Boardwalk
Drive. The site is zoned Harmony Corridor and a church is a secondary use in this district. A
modification allowing the expansion of this secondary use was granted in 2005. This use will
require a 'Type II" hearing as defined in the Land Use Code.
I. City Plan Principles and Policies
Front Range Baptist Church & Academy is proposing the expansion of their facilities with
the Phase 1 construction of a 20,484 square foot gym and sanctuary space. A Phase 2
expansion is planned in the future to add a permanent sanctuary. The project is consistent with
the applicable Land Use Principles and Policies adopted by the City of Fort Collins. The site is
designed to promote construction that will contribute positively to the City. The development will
also encourage a compact development pattern by encouraging bicycle, pedestrian, and transit
use.
The project is proposed on an existing developed parcel within the City Limits. No known
natural features will be impacted by the proposed church expansion. Buffering is proposed along
the east and west sides of the development where parking lots are proposed adjacent to office
and residential development. The existing detention pond will be retained as usable open space
and active recreation area in Phase 1.
The site is generally flat and drains from the northwest corner to the southeast corner of
the site. Minimal grading will be done to create positive drainage to the existing detention pond.
Transportation principles and policies promote development designs that are pedestrian
and transit friendly, provide easy access to "multi -modal" streets, and allow easy connections to
the planned, community wide, pedestrian network; while recognizing that private automobiles will
continue to be an important means of transportation. Emphasis was placed on providing
pedestrian connectivity from the entry doors on the existing and proposed building to the
sidewalk along Harmony Road and to on -site parking areas. Front Range Baptist Church &
Academy is designed accordingly. A detached sidewalk along East Harmony Road will remain in
its current location.
Community Appearance and Design elements have been incorporated into the site by
attention to site lighting needs, pedestrian plazas, and a focus on internal outdoor spaces within
the development.