Loading...
HomeMy WebLinkAbout120 CHERRY ST., CHERRY ST. STATION - PDP - 9-05 - CORRESPONDENCE - TRAFFIC STUDY (3)1 0 From: Eric Bracke (mailto:ebracke@fcgov.com] Sent: Thursday, January 27, 2005 8:37 AM To: troy@architex.com Cc: mikal@architex.com; David Averill; Sheri Wamhoff Subject: Re: scoping for a traffic study Troy, Here is the estimated trip generation for the project: Summary of Trip Generation Calculation For 17 Dwelling Units of Apartments January 27, 2005 Average Rate Standard Deviation Adjustment Factor Driveway Volume Avg. Weekday 2-Way Volume 6.72 3.02 1.00 114 7-9 AM Peak Hour Enter 0.10 0.00 1.00 2 7-9 AM Peak Hour Exit 0.41 0.00 1.00 7 7-9 AM Peak Hour Total 0.51 0.73 1.00 9 4-6 PM Peak Hour Enter 0.40 0.00 1.00 7 4-6 PM Peak Hour Exit 0.22 0.00 1.00 4 4-6 PM Peak Hour Total 0.62 0.82 1.00 11 Saturday 2-Way Volume 6.39 2.99 1.00 109 Saturday Peak Hour Enter 0.00 0.00 1.00 0 Saturday Peak Hour Exit 0.00 0.00 1.00 0 Saturday Peak Hour Total 0.52 0.74 1.00 9 Based on the above, the TIS can be waived. However, please contact David Averil regarding and alternative mode information he may require. Also, the curb cut on Cherry may be problematic (Taco John's curb cut certainly is a problem) It may have limited movement. Eric Anne Aspen -TIS for Cherry Street Station . Page 1 if From: 'Troy Jones" <troy@architex.com> To: <Daverill@fcgov.com> Date: 1/28/05 8:27AM Subject: TIS for Cherry Street Station David, Here's an e-mail I received from Eric Bracke waiving the vehicular portion of the TIS for our upcoming Cherry Street Station PDP. He said I should check with your regarding the alternative mode requirements. Here's the info about the project. Site: The property is an urban infill site about 16,000 (0.33acres) square feet in size. It is located directly across Cherry Street to the north of Taco Johns at Cherry and College. It is bounded by Cherry Street on the south, the Union Pack RR on the east, and the Burlington Northern RR on the north/west. There is a strip of land between the UP track and College Avenue. Configuration: We intend to have a basement parking garage. There will be a ramp with a curb cut onto Cherry directly across Cherry from the existing Taco Johns drive cut. Building Program: We will be building one multi -story building with 17 residential loft units (nine 1-bedroom, and half two 2-bedroom), and about 1600 square feet of office on the first floor. It's our understanding that College and Cherry recently went through major intersection improvement including new sidewalks, crosswalks, paving, medians, etc. Troy Jones CC: Mikal Torgerson, Anne Aspen, Katie Moore CC: <mikal@architex.com>, "'Anne Aspen"' <AAspen@fcgov.com>, <kamoore@fcgov.com>