HomeMy WebLinkAbout120 CHERRY ST., CHERRY ST. STATION - PDP - 9-05 - CORRESPONDENCE - TRAFFIC STUDYAnne Aspen - Fwd: Cherry Street Station a^**ss and parking Page 1
From: Marc Virata
To: Anne Aspen; Cameron Gloss; David Averill
Date: 03/25/2005 4:48:00 PM
Subject: Fwd: Cherry Street Station access and parking
Upon further clarification from Eric, he supports inset parking for the sole purpose of it acting as
loading/unloading & pick-up/drop-off for vehicles. He will not support this area used for parking (be it short-
term, long-term, or handicap).
Thanks,
Marc
>>> Marc Virata 3/24/2005 8:22:50 AM >>>
I just spoke with Eric Bracke this morning on Cherry Street Station and received verification on the
following items:
Access Control:
The development will be required to construct a porkchop/channelization median at the driveway entrance
to the parking garage to direct access as right-in/right-out to the extent possible with such a design. This
is required at this time and not at some future date.
Parking along Cherry:
Eric does not object to the providing of inset parking along Cherry Street to get vehicles outside of the
bikelane/travel lane. Part of this area should be for temporary loading/unloading.
We will likely discuss the inset parking issue further at TransCoordination this morning, Eric won't be at
the meeting, though Ward may attend.
Thanks,
Marc