Loading...
HomeMy WebLinkAboutOLD TOWN FLATS - FDP - FDP130049 - CORRESPONDENCE - (3)01/10/2014: No comments. Department: Traffic Operation Contact: Ward Stanford, 970-221-6820, wstanford@fcgov.com Topic: Construction Drawings Comment Number: 4 Comment Originated: 02/11/2014 02/11/2014: Sht C201: Please show current existing striping and RR tracks on Mason and connect new striping to the existing striping (bike lane, double yellow line, train crossing stencils). Comment Number: 5 Comment Originated: 02/11/2014 02/11/2014: Sht C201: Please revise the solid bike lane stripe to be a 6" solid white line. If the existing line isn't 6" in width then the development will need to paint the full length of the bike lane stripe (terminates about where the Match Line is shown). Comment Number: 6 Comment Originated: 02/11/2014 02/11/2014: Sht C201: Please show the double yellow painted median stripe fully across the tracks with breaks about 1' each side of each rail. You can show the double yellow as continuous with a note to break across the rails or show them as broken across the rails. The City will paint over the concrete RR panels, just not the rails. Comment Number: 7 Comment Originated: 02/11/2014 02/11/2014: Sht C201: Please show the RR pavement stencil on the north bound lane adjacent to the existing RR sign. Comment Number: 8 Comment Originated: 02/11/2014 02/11/2014: Sht C201: Please reposition the Wb Maple Stop Sign at Mason to a point near the east edge of the enhanced crosswalk. Please revise the labeling to state sign to be relocated (also revise the label on sheet C100 stating the existing signs to remain.). Comment Number: 9 Comment Originated: 02/11/2014 02/11/2014: Sht C200: Please delete the R1-1 (Stop) sign shown on the alley at Maple. Do keep the one on the north end at Cherry. Please revise the existing Stop Sign labeling on Maple at Mason (relocating the existing Stop sign near the crosswalk). Comment Number: 10 Comment Originated: 02/11/2014 02/11/2014: 'Sht C201: Please delete the RR tracks shown heading northwesterly. They've been removed and repaved. Comment Number: 11 Comment Originated: 02/11/2014 02/11/2014: Sht C201: Please revise the Legend, item 1 to state a 6" solid white line. (Just for info and until we complete of revisions of our standards, bike lane stripies are now 6" solid white (or dashed (T dash x 9' gap)), and 8" solid white when between the thru and right turn lane.) Topic: General Comment Number: 12 Comment Originated: 02/11/2014 02/11/2014: Please feel free to send me PDF's of the revisions instead of hard copy and ahead of any further submittal. ` Department: Stormwater Engineering Contact: Jesse Schlam, 970-218-2932, jschlam@fcgov.com Topic: Erosion Control Comment Number: 1 Comment Originated: 12/31/2013 02/04/2014: Minor Correspondence about the Maintenance from the Trash Enclosure remaining. Emails are currently underway to resolve the issue. 12/31/2013: Erosion Control Report is not missing any information, just minor edits. Section 1.1... "Carriage Apartments" Please Change, Section 2.2... "raze all structure" I was not aware that there were still structures to be demolished, Section 2.7... "Grasses Gravel'... missing and? or is this glass -less gravel?, and Section 4.1 please specify weed free mulch. The erosion control plans had some redlines specifically 1) Perimeter Controls on a few of the sides 2) Worries about wattles as perimeter control on tall buildings not being effective basis The District at Campus West. Please address this issue to ensure the site will be effective at preventing the materials from ending up in the Poudre. 3) Missing Inlet Protection how is the inlet protection going to prevent discharge from a water quality structure. Please show detail. Also the location of the trash enclosure is close to the outlet structure, this could be an issue for long term pollution discharges. Possible secondary containment? Erosion Control Escrow Calculation looked good but might have to be recalculated when the plans are shored up. If you need clarification concerning this, or if there are any questions please contact Jesse Schlam 970-218-2932 or email @ jschlam@fcgov.com Department: Technical Services Contact: Jeff County, 970-221-6588, (county@fcgov.com Topic: Building Elevations Comment Number: 1 Comment Originated: 01/08/2014 02/12/2014: There are still line over text issues on sheet FDP3. There is also text that needs to be masked. See redlines. 01/08/2014: There are line over text issues on sheet FDP 3. See redlines. Topic: Construction Drawings Comment Number: 7 Comment Originated: 02/12/2014 02/12/2014: There needs to be a reference to the property boundary for the centerline stationing coordinates shown on sheet C201, either by bearing & distance and/or coordinates on boundary corners. Topic: Lighting Plan Comment Number: 6 02/12/2014: No comments. Topic: Plat Comment Number: 4 02/12/2014: No comments. 01/10/2014: No comments. Topic: Site Plan Comment Originated: 02/12/2014 Comment Originated: 01/10/2014 Comment Number: 5 02/12/2014: No comments. Comment Originated: 01/10/2014 contains the signature blocks for the entire set and does not need to be duplicated. Comment Number: 9 Comment Originated: 02/14/2014 02/14/2014: On sheet (LS102) 2 of 17, please add a note number 11 that states: "Fixed Bike Racks shall be permanently anchored to concrete and not interfere with walkways or landscaping." Also, see the proposed revision to note number 10 so that is more general in nature. Comment Number: 10 Comment Originated: 02/14/2014 02/14/2014: General Land Use Data and General Notes do not have to be duplicated on sheets (LS102) 2 of 17 and (LS401) 3 of 17. Comment Number: 11 Comment Originated: 02/14/2014 02/14/2014: As you are aware, Staff has allowed the privately -owned, pole -mounted, decorative light fixtures to be removed from the Final Plan due to issues related to allowing their placement within public right-of-way. These issues remain unresolved at this time. Staff, however, is exploring various options that would ultimately allow these fixtures to be permitted, subject to criteria that meets the objectives of all the affected parties. In order to ensure that should a proper procedure be agreed upon, and that these fixtures are then able to be added back into the plans, Staff recommends that the applicant pre -submit a Minor Amendment. This Minor Amendment will be accepted and reviewed but put on HOLD until the final procedures are resolved. In the event that circumstances result in these fixtures not being able to be installed, then the fees associated with the Minor Amendment will be refunded. Department: Engineering Development Review Contact: Marc Virata, 970-221-6567, mvirata@fcqov.com Topic: Construction Drawings Comment Number: 6 Comment Originated: 01/08/2014 02/13/2014: May have comments from Inspection. 01/08/2014: With the inclusion of the signing and striping plan for Mason Street, additional review of the patching limits will be done. We may need to provide additional patching out to the railroad track for a section to avoid the acute angle where the inlet is, but will need to see the patching information along with the lane lines to have a more complete review. The City's standard note regarding limits of street repair being approximate should be added. Comment Number: 7 Comment Originated: 01/08/2014 02/13/2014: Please indicate that a variance was granted on 2/12 to the minimum cover requirements on general note #48. This justification was based on the use of the concrete pavement section and the fact that the area will not normally be normally subject to vehicular loads. 01/08/2014: The storm drain plan and profile sheet should also include design information for the additional storm line on Mason Street with the shifting storm inlet. Will want to see the cover over the pipe depicted. Department: Light And Power Contact: Doug Martine, 970-224-6152, dmartine@fcgov.com Topic: General Comment Number: 1 Comment Originated: 12/12/2013 12/12/2013: No comments. l Community Development and Neighborhood Services 281 North College Avenue PO Box 580 Fort Collins, CO 80522 970.221.6750 970.224.6134 - fax kgov. com/developmentre view February 14, 2014 Dave Derbes Brinkman Development, LLC 3003 E Harmony Rd Fort Collins, CO 80528 RE: Old Town Flats, FDP130049, Round Number 2 Please see the following summary of comments from City staff and outside reviewing agencies for your submittal of the above referenced project. If you have questions about any comments, you may contact the individual commenter or direct your questions through the Project Planner, Ted Shepard, at 970-221-6343 or tshepard@fcgov.com. Comment Summary: Department: Current Planning Contact: Ted Shepard, 970-221-6343, tshepard@fcgov.com Topic: General Comment Number: 5 Comment Originated: 02/14/2014 02/14/2014: Please add a trash enclosure detail to sheet LS501. Enclosure must be of sufficient size to accommodate trash and containers for recyclable materials. The exterior must be brick to match the building with solid metal gates. Comment Number: 6 Comment Originated: 02/14/2014 02/14/2014: On the Lighting Plan, the Luminaire Schedule calls for two BB1 fixtures but on sheet FDP 9, the schematic is titled BB2. Please resolve. Also be sure that the selected fixture is down -directional as up -lighting is not permitted. Comment Number: 7 Comment Originated: 02/14/2014 02/14/2014: Please supplement the numbering system so that the various plan sheets from the entire design team are organized as a single set and that indexes are adjusted accordingly, and that each sheet is part of a 17 sheet set. Note that sheets LS101 and LP001 are not needed. The sequence will be as follows: site plan (sheets 1 - 4) , landscape plan (sheets 5 - 7), architectural elevations and shadow analysis (sheets 8 - 15), lighting plan (sheets 16 -17). Comment Number: 8 Comment Originated: 02/14/2014 02/14/2014: The first architectural sheet (FDP 1), will also be numbered as sheet 8 of 17 and will not need signature blocks. The cover sheet of the site plan, (LS001), sheet 1 of 17,