HomeMy WebLinkAboutSTONER EAST HARMONY ROAD PROPERTY - MOD - 45-04 - REPORTS - MODIFICATION REQUESTNo Text
reIGILIPOR L7i
The Planning and Zoning Board has the authority to grant the modification as requested
as provided in Section 2.8.2 (H) of the Land Use Code given that the proposed plan is
not detrimental to the public good and for the following reasons: that the project is better
suited for secondary uses considering its location between two proposed shopping
centers; the parcel is "exceptionally shallow"; there is ample employment ground
available with the City of Fort Collins' GMA; and that the parcel suffers from a "small lot
penalty" based on existing and marketable design/development patterns. The parcel is
also comparable in size, depth and attribute to a set of parcels near the Harmony and
College Avenue intersection and these combined parcels do not have the 25%
secondary use restriction.
By granting this modification, this development can be another a positive contribution to
the development that exists along the Harmony Corridor and be beneficial to the needs
of the City of Fort Collins without sacrificing a significant amount of employment ground.
Thank you for the opportunity to submit this modification of standard.
Joe Carter
Cityscape Urban Design
Attachments:
11" x 17" —Vicinity Map
b. have the associated 25% secondary use restriction. This can, in part, be
attributed to the parcels' depth and size.
The subject parcel is approximately 4.68 acres. The comparable
parcels combined acreage is approximately 5.47 acres.
❑ The subject parcel is approximately 265' in depth. The
comparable parcels average approximately 235' in depth.
❑ The subject parcel is adjacent to existing residential uses. The
comparable parcels are adjacent to existing residential uses.
❑ The applicant maintains that the standards that apply for the
comparable parcels should be applied to the subject parcel due
to depth and size.
c. The subject parcel suffers from what could be termed a "small lot penalty"
or an undue hardship of being a small parcel.
❑ If a parcel is large enough, a developer has the ability to develop
all secondary uses along the Harmony Road frontage (first tier),
while relegating their office/business and industrial uses behind
this frontage (second tier). Small shallow parcels are mandated
to build primary uses along the Harmony Road frontage (first
tier) regardless of market conditions. This results in a "small lot
penalty"
4. The plan would not diverge from the standards of the Land Use Code that are
authorized by this division to be modified when considered from the perspective
of the entire development plan and will continue to advance the purposes of the
Land Use Code as contained in Section 1.2.2.
a. The applicant maintains that when taken as an entire corridor, the impact
of this modification on the corridor will be inconsequential.
❑ The Land Use Map (Map 10) designated approximately 1500
acres of Basic Industrial and Non -Retail Employment Use along
the Harmony Corridor. 25% of this land (or 375 acres) has been
designated to allow for secondary uses. To date, it is estimated
that only approximately 52 acres of this 375 acres is developed
as secondary uses. The applicant maintains that 4.68 additional
acres will not diverge from the intent of the Harmony Corridor
Plan.
❑ The market is determining where primary uses develop.
Approximately 65 acres of primary Basic Industrial and Non -
Retail Employment uses are constructed in Mixed Use Activity
Center Areas.
This parcel would be better suited for secondary uses because of its
proximity and use as a potential thoroughfare between two future
shopping centers.
b. The proposed modification would better the opportunity for development
within the Harmony Corridor. The City of Fort Collins currently has an
overabundance of office space for sale and/or lease. Per a memo dated
October 28, 2004 from a local commercial broker, Doberstein Lemburg,
approximately 1,204,008 square feet of office space is available for sale
or lease within the City of Fort Collins.
c. Secondary uses create a better opportunity for pedestrian activity and
connectivity from surrounding residential developments and between the
two proposed shopping centers when compared to an industrial use.
2. The granting of the modification would substantially alleviate an existing, defined
and described problem of city wide concern or would result in substantial benefit
to the City as defined in City Plan by the following ways:
The following information was obtained from a memorandum from City Staff
to City Council dated July 15, 2003 and was provided as a basis for staff's
recommendation of approval for the proposed Lifestyle Center. The following
rational can be applied to the subject property.
❑ Staff is credited with stating, "there was a shortage of
commercial zoning in Fort Collins and that this was a key issue
identified during the City Plan update process." The proposed
modification would provide the opportunity for more commercial
development within the City of Fort Collins.
❑ Staff is also credited with stating, "sales tax dollars could be
captured by additional retail development." The proposed
modification would provide the opportunity for more sales tax
dollars.
❑ Staff is also credited with stating, "fcityl staff had concluded after
a review of the employment land inventory that there was
sufficient vacant land within the Growth Management Area for
future employment. " The proposed modification would not
eliminate the possibility for employment type development. The
proposed modification would merely provide the opportunity to
build secondary uses in between two proposed shopping
centers.
3. The granting of the modification should occur based on the exceptional physical
conditions of the site and an exceptional or undue hardship whereas:
a. The subject parcel is exceptionally shallow and small in size. By
comparison, the parcel is approximately the same average depth and size
as three parcels of land along the south side of Harmony Road near the
Harmony and College Avenue intersection. These parcels of land are
identified as Basic Industrial and Non -Retail Employment Uses but do not
December 8, 2004
Ted Shepard
Chief Planner, Current Planning Division
City of Fort Collins
281 North College Avenue
Fort Collins, CO 80522
RE: Request for a Modification of Standard
RIGHT TO REQUEST
3555 Stanford Road, Suite 105
Fort Collins, Colorado 8o525
Phone: (970) 226-4074
Fax: (970) 426-096
www.cityscapeud.com
eC ci tyscapeud.com
The right to request this Modification of Standard is granted in Division 2.8 of the Fort
Collins Land Use Code.
MODIFICATION REQUESTED
❑ Modify — Article 4, Division 4.21 (D) (2) Harmony Corridor District, Land Use
Standards, Secondary Uses.
(2) Secondary Uses. All secondary uses shall be integrated both in function and
appearance into a larger employment -based development plan that emphasizes primary
uses. A secondary use shall be subject to administrative review or Planning and Zoning
Board review as required for such use in Section 4.21(B). The following permitted uses
shall be considered secondary uses in this zone district and together shall occupy no
more than twenty-five (25) percent of the total gross area of the development plan.
A. The applicant requests to eliminate the secondary use percentage requirement of
25% for the subject parcel. The applicant requests that there be no limitation on
the percentage of secondary uses allowed for the subject parcel. The parcel is
approximately 4.68 acres in size and is located north of Harmony Road and west
of Snow Mesa Drive between the Harmony School Shops proposed shopping
center and the proposed Lifestyle Center.
JUSTIFICATION
❑ Division 2.8, Step 8 — allows the decision maker to grant a modification of
standard only if it finds that the granting of the modification would not be
detrimental to the public good and that:
1. The proposal to eliminate the 25% secondary use maximum for this parcel will
not be detrimental to the public good and will promote the general purpose of the
standard as well or better than a plan that strictly adhered to the standard
because:
a. The Harmony Corridor Plan in part states:
"Basic Industrial and Non -Retail Employment Activity Center are locations
where either industrial uses and/or office or institutional type land use
are permitted to locate in planned office (or business) park settings."