HomeMy WebLinkAbout120 CHERRY ST., CHERRY ST. STATION - FDP - 9-05A - CORRESPONDENCE - REVISIONSNumber: 107 Created: 1 /25/2006 [1/25/06] Meter pit detail has been updated. Provide email address and we will sent it to you. Response: Drawings have tee �eviser! Ir reflect !=.test meter pit detail. Number: 108 Created: 1 /25/2006 [1/25/06] See utility plans for other comments. Response: All redline comments were addressed. Page 9 [1/24/06] Re -align 8-inch connection directly south across Cherry Street to avoid vicinity of railroad signals, etc. [3/20/05] Field locate the 8-inch water main in Cherry and revise plans to reflect the actual location and alignment. This may affect the tie-in of the proposed water main. Response: Water line was re -aligned and drawings were revised Number: 47 Created: 3/20/2005 [1/24/06] [3120105] Provide copy of the railroad permit for the sewer service crossing. Railroad may need a detail of the crossing showing casing etc. Response: As coordinated with Marc Virata, the development agreement will specify that the railroad permit be required to be in place prior to the issuance of a development construction oerm;t Number: 48 Created: 3/20/2005 [1/24/06] [3120105] Run-off from driveway ramp may NOT discharge to the sanitary sewer. Response: 1 he fun-Gif i,G;M ;ne C'I'VeWay rams' Is G;scnarged n(G l.rle stoi-m sewer sy'siem, not the sanitary sewer system. A note was added to drawings as discussed and approved by Roger Buffington. Number: 49 Created: 3/20/2005 [1/24/06] [3/20/05] Provide water demand/water service sizing calculations. Response: Dan Haynes, the spec'. projects manager from Allen Plumbing and Heating has reviewed the fixture counts and has confirmed that the 2" service line for water service is adequate. Number: 50 Created: 3/20/2005 [1/24/06] [3120105] What uses will be allowed in the commercial space? Separate wafer/sewer services normally required for the commercial and residential uses. Response: As dis -issed on numerous occasions. no separate services will be required for the use of an internet service provider. Number: 104 Created: 1 /24/2006 (1/24106] Show and note thrust blocks at all fittings on water mains. Response: Drawings nave been �evisec. Number: 105 Created: 1 /24/2006 [1/24/06] Provide elevations to determine if there will be a conflict between sewer service and the NWCWD 24-inch water main. Response: Drawings are properly labeled as discussed in meeting with Roger Buffington on Friday 3/3/06. Number: 106 Created: 1 /25/2006 [1/25/06] List the elevation of the sewer service at the point of connection to the existing manhole. Response: The sanitary sewer elevations are shown as discussed in meeting with Roger Buffington on Friday 3/3/06. Page 8 2. There is still no clear indication where seeding/straw mulching mentioned in the report and calculations is to be utilized, or what is to become of the disturbed area of the outfall sanitary sewer northwest of the BNSF railroad. Response: These items have beer s,'arified as per ,meeting with Bob Zakely on Friday 313106. [7/5/05] Sediment/Erosion Control Plan Comments Cherry Street Station July 5, 2005 1. The "Grading and Erosion Control Notes" on plan sheet #2/7 are incorrect, please delete and replace with the correct notes. 2. What will protect Cherry Street from pipeline and other constructions there until hard surfaces are installed? 3. There should be a legend on the erosion control sheet to indicate the BMP's being used. 4. What protection is being provided for the sewer connection on the northwest side of the BNSF railroad tracks? 5. Seeding and mulching is mentioned as a BMP in the report, where is this on the plan? 6. Seeding/mulching costs in the surety calculation are outdated, please use current costs. Response: Old comments from July, this has been resolved with Bob Zackley. Topic: Stormwater- floor drain and subdrain tie in to storm system Number: 109 Created: 1 /27/2006 [1/27/06] Please indicate how the floor drains in the basement as well as the perimeter drains will be tied to the line feeding into the water tank. A note was added to drawings. Topic: Stormwater- tank structural design Number: 110 Created: 1 /27/2006 [1/27/06] Please add a note to the site plan indicating that the the water tank will require a building permit to be issued prior to construction to include a structural design for the tank. Response: This has been added as General Note #16 on the Site Data sheet (1 of 10). Topic: Stormwater-Plat Number: 111 Created: 1 /27/2006 [1 /27/06] Please provide a drainage easement for the area where the tank is to be located. Response: The unsigned copy of this easement has been given to Marc Virata. As soon as Marc says it's OK, we will have the owners and the attorney sign the easement to finalize it. Department: Stormwater-Water-Wastewater Topic: Water/WW Number: 45 Issue Contact: Roger Buffington Created: 3/20/2005 Page 7 Number: 89 Created: 1213012005 [12/30/05] All electric meters must be accessible without access key or an escort. Residential units must be individually metered. Response: All electric meters are shown on the plans outside of the are clearly labeled on the Landscape Plan. Department: Natural Resources Issue Contact: Doug Moore Topic: Trash Enclosure Number: 88 Created: 12/30/2005 [12/30/05] The proposed Trash Enclosure does not provide the required adequate space to meet the Trash and Recycling Enclosure standard (3.2.5 LUC) and will need to be redesigned. The proposed enclosure provides only 54.82 square feet the requirement for 15 dwelling units (not including the small commercial space) is 125 square feet. Please refer to the City of Fort Collins Guidance Document, Trash and Recycling Enclosures - Design Considerations, August 2004 available on line at - , cam/ramtdlin enclosure-cuidelines0804_odf. Response: A recycling enclosure has been added adjacent to the trash enclosure. Department: PFA Issue Contact: Carle Dann Topic: fire Number: 90 Created: 1 /20/2006 [1/20/06] PFA supports the proposed structure if it includes a Code -approved high-rise package of engineered systems, minus a fire pump and standpipe provisions. However, a fire pump shall be included if the city water pressure is not adequate enough to support the automatic fire -sprinkler system. Response. Note #1 7 on sheet 1 of 10. It addresses this comment. Department: Transportation Planning Issue Contact: David Averill Topic: General Number: 67 Created: 7/5/2005 [1 /18/06] [7151051 No further comments. Please route all future submittals. Response 4cknowledge Department: Stormwater-Water-Wastewater Issue Contact: Basil Harridan Topic: Drainage Number: 103 Created: 1 /24/2006 [1 /24/06] Please add a note to the grading plan stating that the maintenance of the 6" HDPE pipe in the sidewalk is the responsibility of the HOA of this building. Response: Note has been added to drawing; Topic: Erosion Control Number: 68 Created: 71512005 [1 /23/06] Second Review January 23, 2006 1. There is still no legend on the plan indicating BMP's being utilized. Response: A legend has been added to drawings as discussed with Bob Zakely on Friday 3/3/06. Page 6 [1/30/06] HDPE pipe is not allowed in right-of-way. Contech A-2000 is an acceptable material. Response: Contech A-2000 PVC pipe has peen spearied fcr all private storm sewer as shcwn on drawings. Number: 119 Created: 1 /30/2006 [1/30/06] The underdrain pipe for the tree wells will require an encroachment permit for its location in the right-of-way. For where it ties into the outlet of the storage tank, is this area proposed as a utility easement? Response: Per a telephone conversation with Marc Virata on 2/28/06, this encroachment permit is something that can be arranged with Bill in the Engineering Department after the underdrain pipe has been installed. Number: 120 Created: 1 /30/2006 (1/30/061 Indicate the amount of street patching proposed with the gas tie in within the street. Response. An area for street patching is now shown on drawings. Department: Light & Power Issue Contact: Doug Martine Topic: Utilities Number: 11 Created: 3/7/2005 [12/30/05] [317105] Light & Power will need electrical load information. This includes a Commercial Electric Service Information (C-1) form for each commercial service, including one for any fire pump if required, and the electric service size for each residential unit, typically 150 amps or less, or 200 amps. Residential units must be individually metered. Response cknowledged. We will submit the C-1 form at the time of building permit application. Number: 12 Created: 3/7/2005 [12/30/05] [317105] The parking garage drawing shows an elevator. Although the response from Conceptual Review comments states that 3 phase power will not be required, virtually all elevators do require 3 phase power. Also, the parking platform lifts may require 3 phase power. Additional costs to the developer will be incurred to bring 3 phase from approx. 300 ft. south of Cherry St. Response: SuoseqL�e ,t tc concept -a, review, we rave indicated on every submittal that we need three-phase power. Ifs not clear why this comment continues to be carried over on the DMS comments. We have desiged for 3-phase power in our utility plans. Number: 13 Created: 31712005 [12/30/05] [317105] If a fire pump is required, close coordination with Light & Power Engineering is encouraged while the building is still in the design stage. There are issues that can substantially affect the monthly power cost to test and operate a fire pump. Response: PFA has been determined that a fire pump is not required, unless water pressure is too low to serve the building, which will be discovered at the time of construction drawing design. In the event that it is determined that a fire pump is needed, we will coordinate closely with Light & Power on the design. Page 5 Number: 113 Created: 113012006 [1/30/06] The perimeter drain system encroaching onto the proposed utility easement along Cherry Street is problematic in that we don't have an encroachment permit mechanism within an easement, only right-of-way. As with #112, a three dimnesional utility easement appears to be needed to call out the area below the stairwell and above the perimeter drain system as an easement and the utility providers need to provide input and acceptance on this. Respon se: Hs per discussions with Marc Virata, one building will use a perim:ter cram aesign that doesn't require the private perimeter drain to extend into any utility easement. Such detail can reviewed at the time of building permit. Topic: Utility Plans Number: 114 Created: 1 /30/2006 [1/30/06] The level of design provided on the plans for the utility connections south of the site across Cherry Street was discussed at length within Engineering. With this being the first review of "final" construction drawings, we will not support the information provided for the various utility connections as being adequate. Please refer to 25.1.6 of LCUASS requiring field locating and verifying elevations of all utilities on construction plans. Approximate location of utilities with field verification after plan approval will not be accepted. The boring "designs" shown need to specify profiles and clearances from other utilities. Please also note that the plans do not show a storm pipe crossing across Cherry Street that will cross the gas connection shown across Cherry Street. Response: We have sent our surveyor out to verify the location of the stormsewer between the two inlets on the north and south side of Cherry Street. He also found the vertical location of said pipe by using inverts. Regarding the other underground utilities, that would require pot -holing to discover their vertical location, Marc Virata, Paul Eckman and Lance Newlan have agreed to resolve the issue by putting the following note in the development agreement, "The Developer shall "field locate" and verify elevations of all existing utilities at least one week prior to any utility construction related activities (to include but not be limited to, boring and excavation) and shall report the field locating results in writing to the City. The City shall have the right to issue a stop work order against any utility construction related activities that occur less than one week after the said field locating has been reported to the City." Number: 115 Created: 113012006 [1 /30/06] The street cut on Cherry Street for the water main is not shown correctly per patching standards with the patching needing to be shown at right angles to the direction of travel. Please expand the patching area. Response: The water line alignment has been revised and so the street cut area has been revised. Number: 116 Created: 1 /30/2006 [1/30/06] Add the following note: "Limits of street repair are approximate. Final limits to be determined in the field by the City Engineering Inspector at the time the cuts are made. All repairs are to be in accordance with City standards." Resoonse: The drawings have been revised to show the latest city note Number: 118 Created: 1 /30/2006 Page 4 verified as private utilities (such as the underdrain pipe for the tree wells) cannot be within this easement. Response: The Fiber Optic and TV lines identified in this location on our survey are both belonging to Comcast. We have worked this easement r'ir-ctly out with Comcast. Number: 117 Created: 113012006 [1/30/06] Please note that the several onsite and offsite easement dedications are each subject to a transportation development review fee of $250 each. Please begin the process of exhibits for review of these various easements. Response: We have s.., mitted these exhibits for review. Our final compliance submittal was submitted prior to the new fee going into effect, so we're assuming that said fee does not apply. Number: 121 Created: 113012006 [1/30/06] The gas tie in shown on the plans is within CDOT right-of-way and will require a utility permit. Response: Per Maros comment at staff review, this will be dealt with at the time of development permit. Number: 122 Created: 113012006 [1/30/06] Provide evidence of vacation of the CDOT temporary construction easement prior to any approval of the plans. Response: This easements sunset date has already occurred, therefore we nave taken all reference to the former easement off the pians. Number: 123 Created. 1/30/2006 [1/30/06] Provide the permit from the railroad for the utility connection prior to any approval of the plans. Response: As coordinated with Marc Virata, the development agreement will specify that the railroad permit be required to be in place prior to the issuance of a development construction permit. Number: 124 Created: 113012006 [1 /30/06] Provide the easement from the City for the utility connection on Park property prior to any approval of the plans. Response: This easement has been coordinated with Helen Matson, Craig Forman, Wally Muscot, and Marc Virata. It was approved at first reading by City Council on February 21, 2006, and is scheduled for second reading on March 7, 2006. Topic: Perimeter Drain System Number: 86 Created: 7/8/2005 [1/30/06] In discussing the information provided within Engineering, the note on the plan and subsequent drain detail spec will not suffice. An actual design of the perimeter drain system is needed with the construction drawings from the engineer to establish a design. Should during the course of building design the drain system as proposed needs to be altered, a revision to the drawing will be needed. [718105] The construction drawings will need to show how the perimeter drain system noted in the soils report will outlet (how it ties into the storm system). Response: As per discussions with Marc Virata, the building will use a perimiter drain design that doesn't require the private perimeter drain to extend into any utility easement. Such detail can reviewed at the time of building permit. Page 3 Topic: Landscape Plan Number: 95 Created: 1 /24/2006 [1/24/06] Why are there no trees on the east side of the building behind the water quality tank? There is room for at least one tree. Response: A tree nas oeen adcec as reques:ed. Refer ;o the Landscape Plan. Number: 96 Created: 112412006 [1/24/06] Since there are utility lines on the west Cherry Street frontage that prevent a street tree close to the curb cut, please provide a tree just west of the 8-10 foot utility line separation to make up for the loss and provide needed shade tree canopy. Response: An additional Shademaster Honeylocust has been added in the specified location as requested. Refer to the Landscace Plan. [1127105] Tim Buchanan of the Forestry Department comments that he has a problem or concern. He says, "Change street tree species along Cherry Street to Shademaster Honeylocust. See his redlined plan. Response: The street trees have been changed as suggested. Refer to the Landscape Plan. Topic: Lighting Plan Number: 97 Created: 1 /24/2006 [1/24/06] Please call out finishes once chosen or add a note to the lighting plan that states that finishes will be anodized or otherwise coated to minimize glare. Response: The finishes have been called out as requested on the revised lighting plan. Topic: Parking Plan Number: 93 Created: 1 /24/2006 [1/24/06] The parking platform lift detail still shows standard smaller cars with no roof racks or cargo boxes. The lift must be sized to accommodate the kinds of cars that are likely to be parked here, including SUVs, cars with racks and cars with cargo boxes. Revise this detail to comply with the condition of your approval. Response: in -talking with Anne Aspen, she mentioned that this comment nao inacvertentiy been left in the comments after we discussed the issue at staff review. As a reminder, the parking lift comes in various sizes, and we have dimensioned the diagram accurately, however the diagram is not to scale. Number: 94 Created: 112412006 [1124106] Minor redlines on plans. Respcnse: We have revised the plans accordingly. Department: Engineering Issue Contact: Marc Virata Topic: General Number: 112 Created: 1/30/2006 [1/30/06] The proposed utility easement along Cherry Street appears to be situated such that the stairwell entrance into the building will lay over the easement. This is somewhat problematic in that there is no encroachment permit mechanism in place for items in a utility easement. The utility easement will need to be defined in three dimensions vertically (which relates to ID 113). The affected utility providers will need to sign the plans indicating their acceptance of this compromised utility easement and the impact of having a structure over the easement needs to be verified. The exact boundary of this easement needs to be Page 2 Chevy Street Station Response to Final Compliance Comments 212812006 ISSUES: Department: Current Planning Issue Contact: Anne Aspen Topic: Site Plan/General Number: 91 Created: 1 /24/2006 [1/24/061 Please identify the site in your vicinity map. Response: The site is now indicated on the vicinity map. Number: 92 Created: 1 /24/2006 [1/24/06] Remove General Note number 14. All proposed lighting must be shown on the lighting plan. Response: This note has been removed as requested. Number: 98 Created: 1 /24/2006 [1/24/06] Dalen Wintermute of BNSF RR comments as follows: "Please confirm that the project will not result in any drainage onto BNSF property. A chain link or wrought iron fence, a minimum of 6 feet in height be constructed along the northwesterly boundary of the property (adjacent to BNSF Railway Company property)." Response: We have added 2 6 foot tall wrought iron fence to the plans. Number: 100 Created: 1 /24/2006 [1/24/06] The following departments or agencies do not have any issues or concerns with the proposed: Water Conservation and Park Planning. Respcnse: ACKricwiecgec_ Topic: Architecture Plan Number: 99 Created: 112412006 [1/24/06] There are no details of the trash enclosure elevations on the architecture plans. Please add. Materials and styling of the trash enclosure need to blend with the architecture of the building. Response: 7. equested elevations have been added to the Trash and Recycling Enclosure Detail sheet (9 of 10). Number: 101 Created: 1 /24/2006 [1/24/06] Comcast comments as follows: "Comcast Cable of Fort Collins will need Developer to provide a 2" conduit from communications room to exterior of building. This conduit will be for Comcast sole use of our facilities to service this project. Thank you." This will be specified on the b�,,ding construction documents submitted as part of the building permit application. Number: 102 Created: 1 /24/2006 [1/24/06] Len Hilderbrand of Xcel comments that they have no issues or concerns with the proposed, but developer needs to contact Xcel for estimate to extend gas main and service. Response: Acknowledgec. Page 1