Loading...
HomeMy WebLinkAbout2337 S. SHIELDS ST., HOME STATE BANK - FDP - 8-05A - CORRESPONDENCE - (3)Number: 72 Created: 9/6/2005 [9/6/05] An information for development agreements sheet is attached to be filled out and will be used to draft the development agreement for the project. Department: Light & Power Topic: Electric utility Number: 68 [8/12/05] No comments Issue Contact: Doug Martine Created: 8/12/2005 Department: Stormwater Utility Issue Contact: Wes Lamarque Topic: Stormwater Number: 62 Created: 7/15/2005 [8/31/05] Repeat Comment. [7/15/05] Off -site flows from the west need to be documented and designed to flow through the site. Number: 63 Created: 7/15/2005 [8/31/05] Repeat - Please document spill for west pond in the parking lot. [7/15/05] Please label pond emergency spillways and show detail. Number: 64 Created: 7/15/2005 [8/31/05] Repeat Comment. (7/15/05] On the water quality detail, the retaining wall height needs to be modified to reflect the new pond water surface elevation of 52.99. Topic: Stormwater-Erosion Control Number: 67 Created: 7/19/2005 [9/1/05] Repeat Comment. [7/19/05] 1. The notes on grading and erosion control, sheet 2, are incorrect, please delete. 2. Please provide a project schedule on the most recent form. 3. The surety calculation utilizes incorrect reseeding numbers, please correct. Department: Transportation Planning Topic: General Number: 69 [8/30/05] No comments Department: Water Wastewater Topic: General Number: 70 [9/1/05] No comments. Issue Contact: Kurt Ravenschlag Created: 8/30/2005 Issue Contact: Roger Buffington Created: 9/1 /2005 Please make changes and review with commenting department prior to going to mylar Sincerely, A nd&'Jnr�p? City Planner Page 2 . STAFF PROJECT REVIEW City of Fort Collins BHA DESIGN INC. Date: 09/06/2005 SCOTT SINN 4803 INNOVATION DR. FORT COLLINS, CO 80525 Staff has reviewed your submittal for 2337 S. SHIELDS ST. - HOME STATE BANK PDP, TYPE I AND FINAL PLANS, and we offer the following comments: ISSUES: Department: Current Planning Topic: General Number: 59 Issue Contact: Anne Aspen Created: 7/13/2005 [8/31/05] 1 received some separate 8 1/2 x 11" cut sheets. Typically the drawing or photo of the fixture should be placed on the lighting plan sheet if possible. I don't have cut sheets for luminaires G, X and H. Please add to plan also. [7/13/05] Please provide cut sheets on the lighting fixtures you intend to use. These should include a manufacturer's drawing or photo of the fixture. Make sure all fixtures feature full cut off. The LLF (light loss factor) should be 1.0. Department: Engineering Issue Contact: Marc Virata Topic. General Number: 17 Created: 3/23/2005 [9/6/05] Carried over for reference. [7/7/05] Final plans for this project will not be signed by the City until the easements needed for this project on the Senior Center property are approved by City Council. Please continue to work with Kathy Valdez in Real Estate Services for approval of these easements. [3/23/05] It appears that a number of offsite easements will be needed to construct this project as shown. Because a number of those easements require City Council approval, this project will be approved with conditions, and prior to hearing, a letter from Real Estate Services will be needed stating that the City is amenable to granting the easements needed for this project. Number: 40 Created: 7/7/2005 [9/6/05] The legal description appears to have closed properly. Please provide the actual deed of dedication document, which includes an attorney certification and City administrative acceptance signature block. A sample document is provided. [7/7/05] Please submit a legal and deed of dedication for the emergency access easement required across the Vet property. Number: 45 Created: 7/7/2005 [9/6/05] Please expand the patching limits shown on the demo plan from 2' to the full bikelane width. [7M05] Please clarify on the plans that the existing drive cut on Shields will be removed and replaced with standard curb and gutter. Number: 48 Created: 7/7/2005 [9/6/05] This doesn't appear to have been addressed. [7/7/05] Please provide signature lines on the utility plans for Magnuson to sign the plans as agreed to in the private access easement agreement. Page 1