Loading...
HomeMy WebLinkAboutROMERO HOUSE (425 TENTH STREET) - PDP - 43-04 - SUBMITTAL DOCUMENTS - ROUND 1 -do 5. Soils report — not applicable, no new foundation work. 6. A preliminary drainage report and plan(s) — not applicable. Project will be reducing imperviousness as it restores the building to its 1930s form, removing more recent additions. 7. Transportation Impact Study waived by Transportation Planning. ra ycs�'-S 8. Explanation of any known modification request(s). No specific modification rsis have been determined to date. This is an historic restoration and will rely on 3.4.7 of the Land Use Code. 9. Request(s) for any known engineering variance(s). A sensitive contextual solution for the sidewalk issue needs to be jointly determined with input from Engineering, Planning, Advance Planning and Stormwater. Members of the Poudre Landmarks Foundation team are willing to work with the City on this. 10. Subdivision plat — not applicable. 11. Context diagram included on #3 Site plan drawing. 12. Letters of Intent — not applicable. Off -site easements and off -site rights -of -way are not needed. 13. Utility Plan — not included, no changes have been determined. 14. Conceptual Lighting Plan — not included. This will be addressed in Phase II with the landscape restoration. 15. Public hearing drawings will be provided for the neighborhood meeting. 16. PMT will be submitted for neighborhood meeting. 17. Composting requirement — not applicable. Project Development Plan Submittal for the restoration and change of use of the Historic Romero House at 425 Tenth St. to be known as the: Museo de las Tres Colonias, home of John B. and Inez Romero 1. Written documents (as listed in the PDP Submittal Requirements, revised Sept. 22, 2004): a) Application form, etc., attached b) Legal description: Lot 1, Block 12, Anderson Place, A subdivision located in the NW '/4 of NW '/4 of Section 7, Township 7 North, Range 68 West of the 61h P.M., According to the recorded plat thereof. now in the City of Fort Collins, County of Larimer, State of Colorado also known as 425 Tenth Street. c) No new street names d) Type II review e) Addresses provided by Advanced Planning to Planning f) Poudre Landmarks Foundation, Inc. leases the building from the City. The President of PLF is Bonnie Szizdon. The Project Manager is Marion Jones and Katherine Woods is the Assistant Project Manager. f) City of Fort Collins is the owner. The City contact is Jack Gianola, Special Projects Manager, Operation Services, P.O. Box 580, Fort Collins, CO 80522. g) Response Letter, attached. h) Statement of planning objectives, attached. i) Development schedule. With City approvals, Phase I the building restoration will be completed within 12 months. Then Phase II, landscape restoration will be done. j) Hazardous Materials Impact Analysis, not applicable. Remediation of lead and asbestos removal has been completed. k) Not applicable — urban infill site. 1) Proposed street names - not applicable. 2. Architectural elevations attached. (PDP - 2) 3. Site plan drawings attached. Also includes #11 context drawing. (PDP — 1) 4. Landscape Plan not included. The Historic Landscape restoration design will be part of Phase II based on archaeological and vegetation investigation.