HomeMy WebLinkAboutBELLWETHER FARM - PDP - 46-04 - CORRESPONDENCE - (7)Yours Truly,
Ted Shepard
City Planner
Page 4
Department: Stormwater Utility Issue Contact: Wes Lamarque
Topic: Drainage
Number: 49 Created: 1 /13/2005
[3/1/05] Will be adressed at final plan review.
[1/13/05] The City is concerned the groundwater will infiltrate into the pond and the
percolation design will not function properly due to the groundwater rising when the New
Mercer Ditch is flowing. More investigation needs to take place to how to resolve this
probable problem. There are certain designs that can be implemented to help mitigate this
issue, like a clay cut-off wall along within the berm between the pond and the ditch. Also, a
suggestion would be to have the primary design be the slow release of the pond into the
New Mercer ditch, with City approval based on this concept. The secondary, or backup,
design would be the percolation of the pond water into the ground. This would essentially
be the same overall design, just basing the approval by the City on a different option.
Number: 58 Created: 3/1 /2005
[3/1/05] At final review, the design of the ADS pipe will have to be revised with a swale and
proper placement.
Topic: Floodplain
Number: 55 Created: 3/1 /2005
[3/1/05] The Bike trail and bridge over the irrigation ditch can not be located in the floodway.
Department: Water Wastewater Issue Contact: Jeff Hill
Topic: General
Number: 4 Created: 1 /10/2005
[3/1/05] See comments on lot 31
[1/10/05] Place water services on the center lines of the lots to avoid landscape and drive
way conflicts.
Number: 5 Created: 1 /10/2005
[3/1/05] See comments on the overall utility plans.
[1/10/05] Clearly define the connection procedures for the connection between the existing
20-inch and the proposed 12-inch water lines.
Number: 9 Created: 1 /10/2005
[3/1/05] See comments on the detail sheet.
[1/10/05] Provide all appropriate standard details with the final compliance plan set.
Number: 20 Created: 1 /10/2005
[3/1/05] Maintain the required landscape/utility separation distance on the landscape plans.
[1/10/05] Will an irrigation tap be required for the open spaces?
Number: 56 Created: 3/1/2005
[3/1/05] No permanent structures are allowed with in the utility easement (i.e. retaining
walls, trash enclosures, etc.).
See site, landscape and utility plans for other comments.
Be sure and return all of your redlined plans when you re -submit.
If you have any questions regarding these issues or any other issues related to this project,
please feel free to call me at (970) 221-6750.
Page 3
[1/10/05] Tract A will need a public access easement in addition to the utility and drainage
easement currently shown.
Topic: Utility
Number: 30 Created: 1/10/2005
[3/1/05] Final Compliance
[1/10/05] Will need to show the pedestrian connection and bridge out to Taft Hill as well as
enough information to lay it out in the field (ie: a curve table). This development is elligible
to file for a repay for 1/2 the cost of the bridge connection against the property owner to the
south. Matt Baker with Street Oversizing will assist you with the actual process of doing so.
Number: 31 Created: 1/10/2005
[3/2/05] Final Compliance. Road needs to meet PFA's minimum requirements including the
25' inside and 50' outside turning radii. Concerned with the tight jog in the road closer to
Cherry - can PFA's trucks fit through here?
[1/10/05] Please provide a plan and profile for the emergency access road and show how it
ties into the existing Cherry Street.
Number: 33 Created: 1/10/2005
[3/1/05] Final Compliance
[1/10/05] Please add the driveway symbol to the legend. Will need stationing for every
driveway on the plan and profile sheets in Final Compliance.
Number: 34 Created: 1/10/2005
[3/1/05] A variance request has been routed to all of the utilities. Comments are due March
8, 2005. As of March 1, Light and Power has responded and they have no problem with the
request.
[1/10/051 No structures of any kind (retaining walls) are allowed in the utility easement.
Number: 38 Created: 1/10/2005
[3/1/05] [1/10/05] More detailed comments to follow in final compliance.
Number: 39 Created: 1/10/2005
[3/1/05] Final Compliance
[1/10/05] This development is responsible for the maintainence of the median in Briarwood
and for providing irrigation to the median. A bond or Letter of Credit will be required to cover
the cost of the City removing it in the future should this development not maintain it properly.
Please provide an estimate (Final Compliance) for the City's review and approval. This
requirement will also be put into the Development Agreement. Please see Appendix C for
landscaping requirements.
Number: 40 Created: 1/10/2005
[3/1/05] Final Compliance
[1/10/05] This development is responsible for improving Vine Drive to Taft Hill with a
minimum of 36' of asphalt and striping in bike lanes. This design is currently being done by
the Adrian PDP. Those mylars need to be approved and signed before this development's
mylars can be approved and signed off on. If, for whatever reason, the Adrian design is not
completed, than this development will need to submit utility plans with said improvements.
In addition, these improvements must be constructed with whichever development goes
first. No building permits can be issued until the Vine improvements are complete.
Page 2
STAFF PROJECT REVIEW
Citvof Fort Collins
VF RIPLEY,INC
SANDY MCFERON
401 W. MOUNTAIN SUITE 201
FORT COLLINS, CO 80521
Date: 03/02/2005
Staff has reviewed your submittal for BELLWETHER FARM - PROJECT DEVELOPMENT
PLAN, #46-04, and we offer the following comments:
ISSUES:
Department: Engineering Issue Contact: Susan Joy
Topic: General
Number: 13 Created: 1 /10/2005
[3/1/05] Final Compliance
[1/10/05] Please see Appendix E6 for scanning requirements. You may want to visit with
JR Wilson in Tech Services before your next submittal to discuss whether or not your plans
will scan or not. The grey scale on some sheets probably will not scan and will need to be
corrected. Just to warn you that even if the mylars are signed off and they don't scan in
properly, Tech Services will not accept them. New mylars will need to be provided that meet
their needs and they will need to be rerouted for signatures. Please meet with them early to
avoid this delay. Thanks!!
Number: 59 Created: 3/2/2005
[3/2/05] The ditch company will need a maintenance road along the top of the ditch. There
seems to be a "pinch point" at the retaining wall where there is only 10' of space between
the wall and the slope of the ditch. Is this wide enough to allow for their equipment?
Topic: Hearing
Number: 57 Created: 3/1/2005
[3/1/05] Ready to go to Hearing. All remaining design to be completed in Final Compliance.
Topic: Landscape
Number: 17 Created: 1/10/2005
[3/1/05] Final Compliance. Perhaps turning off the contours will improve scannability.
(1/10/051 Please see Appendix E6 for scanning requirements.
Topic: Plat
Number: 27 Created: 1 /10/2005
[3/1/05] .Final Compliance.
[1/10/05] There is a portion of an existing 10' utility easement that is being vacated. If the
easement is dedicated to the gas company, than they can either sign off on the plat to
vacate the easement or you can vacate it by sep doc as indicated. Please provide a copy of
the recorded vacation. If the easement is dedicated to the City of Fort Collins as a utility
easement, than we'll need to vacate the easement in house.
Number: 28 Created: 1 /10/2005
[3/1/05] Final Compliance - Tract A is now Tract G. Please substitute the label "private
access easement" for "public" or put the sidewalk connection to Taft Hill in a separate Public
Access Easement.
Page 1