HomeMy WebLinkAboutWATERSTONE APARTMENTS - 7-97A - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE REPORTLOCATION MAP
W. HARMONY H RD.
�
HINSDALE DR w
cV
v
o
a
Q
iQ PRAIRIE
ST.
A
FAIRWAY LN.
aWc� APPLE
C = BLOSSOM LN
w
.
z
�
w
o
�• U•■ it' 846
, it
I
T.
T i
1 1
PROJECT SITE
Walerslone Apartments
Preliminary Drainage & Erosion Control Report
Page 1
n
TABLE OF CONTENTS
LOCATIONMAP ......................................................... 1
PRELIMINARY DRAINAGE REPORT
INTRODUCTION AND PURPOSE .......................................... 2
LOCATION............................................................. 2
EXISTING BASIN CHARACTERISTICS ...................................... 2
STORM DRAINAGE CRITERIA ............................................ 3
PROPOSED DEVELOPMENT AND DISCUSSION .............................. 5
CONCLUSION........................................................... 5
EROSION CONTROL PLAN
INTRODUCTION........................................................ 6
EROSION CONTROL MEASURES 6
RAINFALL PERFORMANCE STANDARD AND EFFECTIVENESS ................ 7
REFERENCES........................................................... 8
APPENDIX A - DRAINAGE CALCULATIONS
I EXHIBIT A - DRAINAGE MAP
PRELIMINARY DRAINAGE
AND
EROSION CONTROL REPORT
FOR
WATERS TONE APARTMENTS
FORT COLLINS, COLORADO
November 1997
For.
Paramount Concepts
3333 South Wadsworth, Suite 104
Lakewood, Colorado 80227
By:
The Lund Partnership, Inc.
12265 West Bayaud Avenue, Suite 130
Lakewood, Colorado 80228
Contact: Jamie Pesicka
303-989-1461
Project No. 280-0101
PRELIMINARY
PRELIMINARY DRAINAGE
AND
EROSION CONTROL REPORT
FOR
WATERS TONE APARTMENTS
FORT COLLINS, COLORADO
November 1997
THE
LUND PARTNERSHIP INC.
ATTACHMENT 0