HomeMy WebLinkAboutWATERSTONE APARTMENTS - 7-97A - SUBMITTAL DOCUMENTS - ROUND 1 - TRAFFIC STUDY (3)HCS: Unsignalized Intersections Release 2.1d WA2PM15.HC0 Page 2
-----------------------------------------------------------------------
-----------------------------------------------------------------------
Worksheet for TWSC Intersection
Step 1: RT from Minor Street WB EB
--------------------------------------------------------
Conflicting Flows: (vph) 1306
Potential Capacity: (pcph) 302
Movement Capacity: (pcph) 302
Prob. of Queue -Free State: 0.94
--------------------------------------------------------
Intersection Performance Summary
Avg.
95%
Flow
Move
Shared Total
Queue
Approach
Rate
Cap
Cap Delay
Length
LOS Delay
Movement (pcph)
-------- ------
(pcph)
------
(pcph)(sec/veh)
-------------
(veh)
-------
(sec/veh)
--------------
12.7
EB R 18
302
12.7
0.1
C
Intersection Delay = 0.0 sec/veh
HCS: Unsignalized Intersections Release 2.1d WA2PM15.HC0 Page 1
LEIGH, SCOTT & CLEARY, INC.
1889 York Street
Denver, CO 80206-
Ph: (303) 333-1105
-----------------------------------------------------------------------
-----------------------------------------------------------------------
Streets: (N-S) COLLEGE AVENUE SH287 (E-W) SITE ACCESS (RTO)
Major Street Direction.... NS
Length of Time Analyzed... 15 (min)
Analyst ................... MRM
Date of Analysis.......... 5/l/97
Other Information ......... 2015 TOTAL TRAFFIC, PM PEAK
Two-way Stop -controlled Intersection
-----------------------------------------------------------------------
-----------------------------------------------------------------------
1 Northbound 1 Southbound 1 Eastbound 1 Westbound
I L T R I L T R I L T R I L T R
No. Lanes 1 0 2 0 1 0 2 1 1 0 0 1 1 0 0 0
Stop/Yield 1 N1 NI 1
Volumes 1 2145 1 2480 551 151
PHF 1 .95 1 .95 .951 .951
Grade 1 0 1 0 1 0 1
MC's (%) I I I I
SU/RV's (s)I I I I
CV's (o) I I I I
PCE's I I I 1.101
Adjustment Factors
Vehicle Critical Follow-up
Maneuver Gap (tg) Time (tf)
------------------------------------------------------------------
Left Turn Major Road 5.50 2.10
Right Turn Minor Road 5.50 2.60
Through Traffic Minor Road 6.50 3.30
Left Turn Minor Road 7.00 3.40
HCS: Unsignalized Intersections Release 2.1d WA2AM15.HC0 Page 2
-----------------------------------------------------------------------
-----------------------------------------------------------------------
Worksheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street WB EB
Conflicting Flows: (vph) 652
Potential Capacity: (pcph) 647
Movement Capacity: (pcph) 647
Prob. of Queue -Free State: 0.95
--------------------------------------------------------
Intersection Performance Summary
Avg.
950
Flow
Move
Shared Total
Queue
Approach
Rate
Cap
Cap Delay
Length LOS
Delay
Movement (pcph)
(pcph)
(pcph)(sec/veh)
(veh)
(sec/veh)
-------- ------
------
-------------
------- -----
---------
5.9
EB R 35
647
5.9
0.0 B
Intersection Delay =
0.1 sec/veh
HCS: Unsignalized Intersections Release 2.1d WA2AM15.HC0 Page 1
LEIGH, SCOTT & CLEARY, INC.
1889 York Street
Denver, CO 80206-
Ph: (303) 333-1105
-----------------------------------------------------------------------
-----------------------------------------------------------------------
Streets: (N-S) COLLEGE AVENUE SH287 (E-W) SITE ACCESS (RTO)
Major Street Direction.... NS
Length of Time Analyzed... 15 (min)
Analyst ................... MRM
Date of Analysis.......... 5/l/97
Other Information ......... 2015 TOTAL TRAFFIC, AM PEAK
Two-way Stop -controlled Intersection
-----------------------------------------------------------------------
-----------------------------------------------------------------------
I Northbound I Southbound I Eastbound I Westbound
I L T R I L T R I L T R I L T R
No. Lanes 1 0 2 0 1 0 2 1 1 0 0 1 1 0 0 0
Stop/Yield I NI NI
Volumes 1 1950 1 1240 151 301
PHF 1 .95 1 .95 .951 .951
Grade 1 0 1 0 1 0 1
MC's (o) I I I I
SU/RV's (o)I I I I
CV's (o) I I I I
PCE's I I 1 1.101
Adjustment Factors
Vehicle
Critical
Follow-up
Maneuver
------------------------------------------------------------------
Gap (tg)
Time (tf)
Left Turn Major Road
5.50
2.10
Right Turn Minor Road
5.50
2.60
Through Traffic Minor Road
6.50
3.30
Left Turn Minor Road
7.00
3.40
HCS: Unsignalized Intersections Release 2.1d WA1PM15.HC0 Page 2
Worksheet for TWSC Intersection
Step 1: RT from Minor Street
WB
EB
--------------------------------------------------------
Conflicting Flows: (vph)
1079
1279
Potential Capacity: (pcph)
393
311
Movement Capacity: (pcph)
393
311
Prob. of Queue -Free State:
0.84
0.94
--------------------------------------------------------
Step 2: LT from Major Street
SB
NB
--------------------------------------------------------
Conflicting Flows: (vph)
2195
2584
Potential Capacity: (pcph)
114
70
Movement Capacity: (pcph)
114
70
Prob. of Queue -Free State:
0.60
0.26
--------------------------------------------------------
Step 3: TH from Minor Street
WB
EB
--------------------------------------------------------
Conflicting Flows: (vph)
4831
4842
Potential Capacity: (pcph)
2
2
Capacity Adjustment Factor
due to Impeding Movements
0.15
0.15
Movement Capacity: (pcph)
0
0
Prob. of Queue -Free State:
0.00
0.00
--------------------------------------------------------
Step 4: LT from Minor Street
WB
EB
--------------------------------------------------------
Conflicting Flows: (vph)
4805
4819
Potential Capacity: (pcph)
1
1
Major LT, Minor TH
Impedance Factor:
0.00
0.00
Adjusted Impedance Factor:
0.00
0.00
Capacity Adjustment Factor
due to Impeding Movements
0.00
0.00
Movement Capacity: (pcph)
--------------------------------------------------------
0
0
Intersection Performance Summary
Avg.
95%
Flow Move Shared Total
Queue
Approach
Rate Cap Cap Delay
Length
LOS
Delay
Movement (pcph) (pcph) (pcph)(sec/veh) (veh)
(sec/veh)
-------- ------ ------ -------------
EB L 46 0 > 0 *
-------
*
-----
F
---------
EB T 0 0 >
EB R 18 311 12.3
0.0
C
WB L 58 0 > 0 *
*
F
WB T 0 0 >
WB R 64 393 10.9
0.6
C
NB L 52 70 136.9
2.6
F
2.9
SB L 46 114 51.5
1.5
F
0.8
Intersection Delay =
* The calculated value was greater than
999.9.
HCS: Unsignalized Intersections Release 2.1d WA1PM15.HC0 Page 1
LEIGH, SCOTT & CLEARY, INC.
1889 York Street
Denver, CO 80206-
Ph: (303) 333-1105
-----------------------------------------------------------------------
-----------------------------------------------------------------------
Streets: (N-S) COLLEGE AVENUE SH287 (E-W) CRESTRIDGE STREET
Major Street Direction.... NS
Length of Time Analyzed... 15 (min)
Analyst ................... MRM
Date of Analysis.......... 5/l/97
Other Information ......... 2015 TOTAL TRAFFIC, PM PEAK
Two-way Stop -controlled Intersection
-----------------------------------------------------------------------
-----------------------------------------------------------------------
I Northbound I Southbound I Eastbound I Westbound
I L T R I L T R I L T R I L T R
No. Lanes 11 2 1 11 2 1 10 > 1 1 10 > 1 1
Stop/Yield I NI NI
Volumes 1 45 2050 351 40 2430 251 40 0 151 50 0 55
PHF I .95 .95 .95I .95 .95 .95I .95 .95 .95I .95 .95 .95
Grade I 0 1 0 I 0 I 0
MC's (o) I I I I
SU/RV's (o)I I I
CV's (o) I I I I
PCE's I1.10 I1.10 I1.10 1.10 1.1011.10 1.10 1.10
-----------------------------------------------------------------------
Adjustment Factors
Vehicle Critical Follow-up
Maneuver Gap (tg) Time (tf)
------------------------------------------------------------------
Left Turn Major Road 5.50 2.10
Right Turn Minor Road 5.50 2.60
Through Traffic Minor Road 6.50 3.30
Left Turn Minor Road 7.00 3.40
HCS: Unsignalized Intersections Release 2.1d WAlAM15.HC0 Page 2
Worksheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street WB EB
Conflicting Flows: (vph)
976
640
Potential Capacity: (pcph)
443
656
Movement Capacity: (pcph)
443
656
Prob. of Queue -Free State:
0.93
0.97
--------------------------------------------------------
Step 2: LT from Major Street
SB
NB
--------------------------------------------------------
Conflicting Flows: (vph)
2000
1295
Potential Capacity: (pcph)
145
346
Movement Capacity: (pcph)
145
346
Prob. of Queue -Free State:
0.68
0.93
--------------------------------------------------------
Step 3: TH from Minor Street
WB
EB
--------------------------------------------------------
Conflicting Flows: (vph)
3311
3342
Potential Capacity: (pcph)
13
12
Capacity Adjustment Factor
due to Impeding Movements
0.64
0.64
Movement Capacity: (pcph)
8
8
Prob. of Queue -Free State:
1.00
1.00
--------------------------------------------------------
Step 4: LT from Minor Street
WB
EB
--------------------------------------------------------
Conflicting Flows: (vph)
3294
3303
Potential Capacity: (pcph)
8
8
Major LT, Minor TH
Impedance Factor:
0.64
0.64
Adjusted Impedance Factor:
0.72
0.72
Capacity Adjustment Factor
due to Impeding Movements
0.70
0.67
Movement Capacity: (pcph)
--------------------------------------------------------
6
5
Intersection
Performance Summary
Avg.
950
Flow Move Shared
Total
Queue
Approach
Rate Cap Cap
Delay
Length
LOS
Delay
Movement (pcph) (pcph) (pcph)(sec/veh)
(veh)
-----
(sec/veh)
---------
-------- ------ ------ ------
EB L 81 5 > 5
-------
*
-------
9.7
F
EB T 0 8 >
EB R 18 656
5.6
0.0
B
WB L 18 6 > 6
*
2.0
F
WB T 0 8 >
776.5
WB R 29 443
8.7
0.1
B
NB L 23 346
11.1
0.1
C
0.1
SB L 46 145
36.0
1.2
E
1.1
Intersection Delay = 184.2 sec/veh
* The calculated value was greater than 999.9.
HCS: Unsignalized Intersections Release 2.1d WAlAM15.HC0 Page 1
LEIGH, SCOTT & CLEARY, INC.
1889 York Street
Denver, CO 80206-
Ph: (303) 333-1105
Streets: (N-S) COLLEGE AVENUE SH287 (E-W) CRESTRIDGE STREET
Major Street Direction.... NS
Length of Time Analyzed... 15 (min)
Analyst ................... MRM
Date of Analysis.......... 5/l/97
Other Information ......... 2015 TOTAL TRAFFIC, AM PEAK
Two-way Stop -controlled Intersection
-----------------------------------------------------------------------
-----------------------------------------------------------------------
Northbound I Southbound I Eastbound I Westbound
L T R I L T R I L T R I L T R
I---- --------1---- --------1---- --------1---- ---- ----
No. Lanes 1 1 2 1 1 1 2 1 1 0 > 1 1 1 0 > 1 1
Stop/Yield I N1 NI
Volumes 1 20 1855 451 40 1215 151 70 0 151 15 0 25
PHF 1 .95 .95 .951 .95 .95 .951 .95 .95 .951 .95 .95 .95
Grade 1 0 1 0 1 0 1 0
MC's (o) I I I I
SU/RV's (a)I I I I
CV's (o) 1 I I I
PCE's 11.10 11.10 11.10 1.10 1.1011.10 1.10 1.10
-----------------------------------------------------------------------
Adjustment Factors
Vehicle
Critical
Follow-up
Maneuver
Gap (tg)
Time (tf)
------------------------------------------------------------------
Left Turn Major Road
5.50
2.10
Right Turn Minor Road
5.50
2.60
Through Traffic Minor Road
6.50
3.30
Left Turn Minor Road
7.00
3.40
HCS: Unsignalized Intersections Release 2.1d WA2PMOO.HCO Page 2
Worksheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street WB EB
Conflicting Flows: (vph) 837
Potential Capacity: (pcph) 521
Movement Capacity: (pcph) 521
Prob. of Queue -Free State: 0.97
--------------------------------------------------------
Intersection Performance Summary
Avg. 95%
Flow Move Shared Total Queue Approach
Rate Cap Cap Delay Length LOS Delay
Movement (pcph) (pcph) (pcph)(sec/veh) (veh) (sec/veh)
-------- ------ ------ -------------------- --------------
7.2
EB R 18 521
7.2 0.0 B
Intersection Delay = 0.0 sec/veh
HCS: Unsignalized Intersections Release'2.ld WA2PMOO.HCO Page 1
LEIGH, SCOTT & CLEARY, INC.
1889 York Street
Denver, CO 80206-
Ph: (303) 333-1105
Streets: (N-S) COLLEGE AVENUE SH287 (E-W) SITE ACCESS (RTO)
Major Street Direction.... NS
Length of Time Analyzed... 15 (min)
Analyst ................... MRM
Date of Analysis.......... 5/l/97
Other Information ......... 2000 TOTAL TRAFFIC, PM PEAK
Two-way Stop -controlled Intersection
-----------------------------------------------------------------------
-----------------------------------------------------------------------
I Northbound I Southbound 1 Eastbound 1 Westbound
L T R I L T R I L T R 1 L T R
1---- --------1---- --------i---- ---- ----I---- ---- ----
No. Lanes 1 0 2 0 1 0 2 1 1 0 0 1 1 0 0 0
Stop/Yield 1 NI NI
Volumes 1 1475 I 1590 551 151
PHF 1 .95 1 .95 .951 .951
Grade 1 0 I 0 1 0 1
MC's (%) i I I I
SU/RV's (%)I I I I
CV's
PCE's 1 I 1 1.101
-----------------------------------------------------------------------
Adjustment Factors
Vehicle
Critical
Follow-up
Maneuver
Gap (tg)
Time (tf)
------------------------------------------------------------------
Left Turn Major
Road
5.50
2.10
Right Turn Minor
Road
5.50
2.60
Through Traffic
Minor Road
6.50
3.30
Left Turn Minor
Road
7.00
3.40
HCS: Unsignalized Intersections Release 2.1d WA2AMOO.HCO Page 2
-----------------------------------------------------------------------
-----------------------------------------------------------------------
Worksheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street WB EB
Conflicting Flows: (vph) 418
Potential Capacity: (pcph) 850
Movement Capacity: (pcph) 850
Prob. of Queue -Free State: 0.96
--------------------------------------------------------
Intersection Performance Summary
Avg. 950
Flow Move Shared Total Queue Approach
Rate Cap Cap Delay Length LOS Delay
Movement (pcph) (pcph) (pcph)(sec/veh) (veh) (sec/veh)
-------- ------ ------ -------------------- --------------
4.4
EB R 35 850 4.4 0.0 A
Intersection Delay = 0.1 sec/veh
HCS: Unsignalized Intersections Release 2.1d WA2AMOO.HCO Page 1
LEIGH, SCOTT & CLEARY, INC.
1889 York Street
Denver, CO 80206-
Ph: (303) 333-1105
Streets: (N-S) COLLEGE AVENUE SH287 (E-W) SITE ACCESS (RTO)
Major Street Direction.... NS
Length of Time Analyzed... 15 (min)
Analyst ................... MRM
Date of Analysis.......... 5/l/97
Other Information ......... 2000 TOTAL TRAFFIC, AM PEAK
Two-way Stop -controlled Intersection
-----------------------------------------------------------------------
-----------------------------------------------------------------------
I Northbound I Southbound I Eastbound I Westbound
L T R I L T R I L T R I L T R
I---- ---- ----I---- ---- ----I---- ---- ----I---- ---- ----
No. Lanes 10 2 0 10 2 1 10 0 1 10 0 0
Stop/Yield i NI NI I
Volumes I 1270 I 795 151 30I
PHF I .95 I .95 .95I .95I
Grade I 0 I 0 I 0 I
MC's (o) I I I I
SU/RV's ($)I I I I
CV's (a) I I I I
PCE's I I I 1.10I
-----------------------------------------------------------------------
Adjustment Factors
Vehicle
Critical
Follow-up
Maneuver
Gap (tg)
Time (tf)
------------------------------------------------------------------
Left Turn Major Road
5.50
2.10
Right Turn Minor Road
5.50
2.60
Through Traffic Minor Road
6.50
3.30
Left Turn Minor Road
7.00
3.40
HCS: Unsignalized Intersections Release 2.1d WAIPMOO.HCO Page 2
Worksheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street WB EB
Conflicting Flows:
(vph)
726
810
Potential Capacity:
(pcph)
594
538
Movement Capacity:
(pcph)
594
538
Prob. of Queue -Free
State:
0.89
0.97
--------------------------------------------------------
Step 2: LT from Major Street
SB
NB
--------------------------------------------------------
Conflicting Flows:
(vph)
1490
1647
Potential Capacity:
(pcph)
272
224
Movement Capacity:
(pcph)
272
224
Prob. of Queue -Free
State:
0.83
0.77
--------------------------------------------------------
Step 3: TH from Minor
Street
WB
EB
--------------------------------------------------------
Conflicting Flows:
(vph)
3189
3200
Potential Capacity:
(pcph)
15
15
Capacity Adjustment
Factor
due to Impeding Movements
0.64
0.64
Movement Capacity:
(pcph)
10
10
Prob. of Queue -Free
State:
1.00
1.00
--------------------------------------------------------
Step 4: LT from Minor
Street
WB
EB
--------------------------------------------------------
Conflicting Flows:
(vph)
3163
3177
Potential Capacity:
(pcph)
10
10
Major LT, Minor TH
Impedance Factor:
0.64
0.64
Adjusted Impedance
Factor:
0.72
0.72
Capacity Adjustment
Factor
due to Impeding Movements
0.69
0.64
Movement Capacity:
--------------------------------------------------------
(pcph)
7
6
Intersection Performance Summary
Avg.
950
Flow
Move
Shared Total
Queue
Approach
Rate
Cap
Cap Delay
Length
LOS
Delay
Movement
(pcph)
(pcph)
(pcph)(sec/veh)
(veh)
(sec/veh)
--------
EB
L
------
46
------
6
-------------
> 6 *
-------
5.3
-----
F
---------
EB
T
0
10
>
EB
R
18
538
6.9
0.0
B
WB
L
58
7
> 7 *
6.7
F
WB
T
0
10
>
WB
R
64
594
6.8
0.3
B
NB
L
52
224
20.9
0.9
D
0.6
SB
L
46
272
15.9
0.6
C
0.4
Intersection Delay = 119.1 sec/veh
* The calculated value was greater than 999.9.
HCS: Unsignalized Intersections Release 2.1d WAIPMOO.HCO Page 1
-----------------------------------------------------------------------
-----------------------------------------------------------------------
LEIGH, SCOTT & CLEARY, INC.
1889 York Street
Denver, CO 80206-
Ph: (303) 333-1105
-----------------------------------------------------------------------
-----------------------------------------------------------------------
Streets: (N-S) COLLEGE AVENUE SH287 (E-W) CRESTRIDGE STREET
Major Street Direction.... NS
Length of Time Analyzed... 15 (min)
Analyst ................... MRM
Date of Analysis.......... 5/l/97
Other Information ......... 2000 TOTAL TRAFFIC, PM PEAK
Two-way Stop -controlled Intersection
-----------------------------------------------------------------------
-----------------------------------------------------------------------
1 Northbound 1 Southbound 1 Eastbound I Westbound
I L T R I L T R I L T R I L T R
No. Lanes 1 1 2 1 1 1 2 1 1 0 > 1 1 1 0 > 1 1
Stop/Yield I N1 NI
Volumes 1 45 1380 351 40 1540 251 40 0 151 50 0 55
PHF 1 .95 .95 .951 .95 .95 .951 .95 .95 .951 .95 .95 .95
Grade 1 0 1 0 1 0 1 0
MC's (o) I I I I
SU/RV's (o)I I I I
,CV's (o) I I I I
PCE's 11.10 11.10 11.10 1.10 1.1011.10 1.10 1.10
-----------------------------------------------------------------------
Adjustment Factors
Vehicle
Critical
Follow-up
Maneuver
Gap (tg)
Time (tf)
------------------------------------------------------------------
Left Turn Major
Road
5.50
2.10
Right Turn Minor
Road
5.50
2.60
Through Traffic
Minor Road
6.50
3.30
Left Turn Minor
Road
7.00
3.40
HCS: Unsignalized Intersections Release 2.1d WAIAM00.HC0 Page 2
-----------------------------------------------------------------------
-----------------------------------------------------------------------
Worksheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street WB EB
Conflicting Flows: (vph)
618
406
Potential Capacity: (pcph)
673
862
Movement Capacity: (pcph)
673
862
Prob. of Queue -Free State:
0.96
0.98
--------------------------------------------------------
Step 2: LT from Major Street
SB
NB
--------------------------------------------------------
Conflicting Flows: (vph)
1284
827 n
Potential Capacity: (pcph)
351
617
Movement Capacity: (pcph)
351
617
Prob. of Queue -Free State:
0.87
0.96
--------------------------------------------------------
Step 3: TH from Minor Street
WB
EB
--------------------------------------------------------
Conflicting Flows: (vph)
2127
2158
Potential Capacity: (pcph)
62
60
Capacity Adjustment Factor
due to Impeding Movements
0.84
0.84
Movement Capacity: (pcph)
52
50
Prob. of Queue -Free State:
1.00
1.00
--------------------------------------------------------
Step 4: LT from Minor Street
WB
EB
--------------------------------------------------------
Conflicting Flows: (vph)
2110
2119
Potential Capacity: (pcph)
47
47
Major LT, Minor TH
Impedance Factor:
0.84
0.84
Adjusted Impedance Factor:
0.87
0.87
Capacity Adjustment Factor
due to Impeding Movements
0.86
0.84
Movement Capacity: (pcph)
--------------------------------------------------------
40
39
Intersection
Performance Summary
Avg.
95%
Flow Move Shared
Total
Queue
Approach
Rate Cap Cap
Delay
Length
LOS
Delay
Movement (pcph) (pcph) (pcph)(sec/veh)
(veh)
(sec/veh)
-------- ------ ------ ------
EB L 81 39 > 39
-------
715.4
-------
6.8
-----
F
---------
EB T 0 50 >
589.9
EB R 18 862
4.3
0.0
A
WB L 18 40 > 40
149.4
1.1
F
WB T 0 52 >
59.5
WB R 29 673
5.6
0.0
B
NB L 23 617
6.1
0.0
B
0.1
SB L 46 351
11.8
0.4
C
0.6
Intersection Delay
=
24.3 sec/veh
HCS: Unsignalized Intersections Release 2.1d WAlAM00.HC0 Page 1
LEIGH, SCOTT & CLEARY, INC.
1889 York Street
Denver, CO 80206-
Ph: (303) 333-1105
-----------------------------------------------------------------------
-----------------------------------------------------------------------
Streets: (N-S) COLLEGE AVENUE SH287 (E-W) CRESTRIDGE STREET
Major Street Direction.... NS
Length of Time Analyzed... 15 (min)
Analyst ................... MRM
Date of Analysis.......... 5/l/97
Other Information ......... 2000 TOTAL TRAFFIC, AM PEAK
Two-way Stop -controlled Intersection
-----------------------------------------------------------------------
-----------------------------------------------------------------------
I Northbound I Southbound I Eastbound I Westbound
I L T R I L T R I L T R I L T R
No. Lanes 11 2
1 11
2 1 10 >
1
1 10 >
1 1
Stop/Yield I
NI
NI
Volumes I 20 1175
451 40
770 151 70
0
151 15
0 25
PHF I .95 .95
.95I .95
.95 .95I .95
.95
.95I .95
.95 .95
Grade I 0
I
0 I
0
I
0
MC's (%) I
I
I
I
SU/RV's (%)I
I
I
I
CV's (%) I
I
I
I
PCE's I1.10
-----------------------------------------------------------------------
I1.10
I1.10
1.10
1.10I1.10
1.10 1.10
Adjustment Factors
Vehicle
Critical
Follow-up
Maneuver
------------------------------------------------------------------
Gap (tg)
Time (tf)
Left Turn Major
Road
5.50
2.10
Right Turn Minor
Road
5.50
2.60
Through Traffic
Minor Road
6.50
3.30
Left Turn Minor
Road
7.00
3.40
HCS: Unsignalized Intersections Release 2.1d WA1PM97.HC0 Page 2
Worksheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street WB EB
Conflicting Flows: (vph)
600
712
Potential Capacity: (pcph)
688
603
Movement Capacity: (pcph)
688
603
Prob. of Queue -Free State:
0.91
0.98
--------------------------------------------------------
Step 2: LT from Major Street
SB
NB
--------------------------------------------------------
Conflicting Flows: (vph)
1234
1448
Potential Capacity: (pcph)
373
286
Movement Capacity: (pcph)
373
286
Prob. of Queue -Free State:
0.88
0.98
--------------------------------------------------------
Step 3: TH from Minor Street
WB
EB
--------------------------------------------------------
Conflicting Flows: (vph)
2694
2702
Potential Capacity: (pcph)
29
29
Capacity Adjustment Factor
due to Impeding Movements
0.86
0.86
Movement Capacity: (pcph)
25
25
Prob. of Queue -Free State:
1.00
1.00
--------------------------------------------------------
Step 4: LT from Minor Street
WB
EB
--------------------------------------------------------
Conflicting Flows: (vph)
2670
2682
Potential Capacity: (pcph)
21
20
Major LT, Minor TH
Impedance Factor:
0.86
0.86
Adjusted Impedance Factor:
0.90
0.90
Capacity Adjustment Factor
due to Impeding Movements
0.88
0.81
Movement Capacity: (pcph)
--------------------------------------------------------
18
16
Intersection
Performance Summary
Avg.
950
Flow Move Shared
Total
Queue
Approach
Rate Cap Cap
Delay
Length
LOS
Delay
Movement (pcph) (pcph) (pcph)(sec/veh)
(veh)
(sec/veh)
---------
-------- ------ ------ ------
EB L 17 16 > 16
-------
567.4
-------
1.5
-----
F
EB T 0 25 >
320.4
EB R 13 603
6.1
0.0
B
WB L 58 18 > 18
*
5.8
F
WB T 0 25 >
699.5
WB R 62 688
5.8
0.2
B
NB L 6 286
12.9
0.0
C
0.1
SB L 44 373
10.9
0.4
C
0.3
Intersection Delay = 29.6 sec/veh
* The calculated value was greater than 999.9.
HCS: Unsignalized Intersections Release 2.1d WA1PM97.HC0 Page 1
LEIGH, SCOTT & CLEARY, INC.
1889 York Street
Denver, CO 80206-
Ph: (303) 333-1105
-----------------------------------------------------------------------
-----------------------------------------------------------------------
Streets: (N-S) COLLEGE AVENUE SH287 (E-W) CRESTRIDGE STREET
Major Street Direction.... NS
Length of Time Analyzed... 15 (min)
Analyst ................... MRM
Date of Analysis.......... 5/1/97
Other Information ......... 1997 EXISTING TRAFFIC, PM PEAK
Two-way Stop -controlled Intersection
-----------------------------------------------------------------------
-----------------------------------------------------------------------
I Northbound i Southbound I Eastbound i Westbound
I L T R I L T R I L T R I L T R
No. Lanes 11 2
1 1 1 2
1 1 0 >
1
1 1 0 >
1 1
Stop/Yield i
NI
NI
Volumes 1 5 1141
311 38 1352
241 14
0
111 50
0 53
PHF 1 .95 .95
.951 .95 .95
.951 .95
.95
.951 .95
.95 .95
Grade 1 0
1 0
1
0
1
0
MC's (a) I
I
I
I
SU/RV's (o)I
I
I
I
CV's (a) I
I
I
I
PCE's 11.10
-----------------------------------------------------------------------
11.10
11.10
1.10
1.1011.10
1.10 1.10
Adjustment Factors
Vehicle
Critical
Follow-up
Maneuver
Gap (tg)
Time (tf)
------------------------------------------------------------------
Left Turn Major Road
5.50
2.10
Right Turn Minor Road
5.50
2.60
Through Traffic Minor Road
6.50
3.30
Left Turn Minor Road
7.00
3.40
HCS: Unsignalized Intersections Release 2.1d WAlAM97.HC0 Page 2
-----------------------------------------------------------------------
-----------------------------------------------------------------------
Worksheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street WB EB
Conflicting Flows: (vph)
512
346
Potential Capacity: (pcph)
762
925
Movement Capacity: (pcph)
762
925
Prob. of Queue -Free State:
0.97
0.99
--------------------------------------------------------
Step 2: LT from Major Street
SB
NB
--------------------------------------------------------
Conflicting Flows: (vph)
1071
703
Potential Capacity: (pcph)
456
719
Movement Capacity: (pcph)
456
719
Prob. of Queue -Free State:
0.90
0.99
--------------------------------------------------------
Step 3: TH from Minor Street
WB
EB
--------------------------------------------------------
Conflicting Flows: (vph)
1777
1811
Potential Capacity: (pcph)
100
95
Capacity Adjustment Factor
due to Impeding Movements
0.89
0.89
Movement Capacity: (pcph)
89
85
Prob. of Queue -Free State:
1.00
1.00
--------------------------------------------------------
Step 4: LT from Minor Street
WB
EB
--------------------------------------------------------
Conflicting Flows: (vph)
1765
1771
Potential Capacity: (pcph)
79
78
Major LT, Minor TH
Impedance Factor:
0.89
0.89
Adjusted Impedance Factor:
0.92
0.92
Capacity Adjustment Factor
due to Impeding Movements
0.91
0.89
Movement Capacity: (pcph)
--------------------------------------------------------
72
69
Flow
Rate
Movement
(pcph)
--------
EB
L
------
15
EB
T
0
EB
R
7
WB
L
17
WB
T
0
WB
R
24
Intersection Performance Summary
Move
Cap
(pcph)
69 >
85 >
925
72 >
89 >
762
NB L 9 719
SB L 45 456
Avg.
95%
Shared Total
Queue
Cap Delay
Length
(pcph)(sec/veh)
(veh)
69 66.1
LOS
0.6 F
3.9 0.0 A
72 64.8 0.7 F
Approach
Delay
(sec/veh)
46.5
28.9
4.9 0.0 A
5.1 0.0 B 0.0
8.8 0.3 B 0.5
Intersection Delay = 1.3 sec/veh
HCS: Unsignalized Intersections Release 2.1d WAlAM97.HC0 Page 1
LEIGH, SCOTT & CLEARY, INC.
1889 York Street
Denver, CO 80206-
Ph: (303) 333-1105
-----------------------------------------------------------------------
-----------------------------------------------------------------------
Streets: (N-S) COLLEGE AVENUE SH287 (E-W) CRESTRIDGE STREET
Major Street Direction.... NS
Length of Time Analyzed... 15 (min)
Analyst ................... MRM
Date of Analysis.......... 5/l/97
Other Information ......... 1997 EXISTING TRAFFIC, AM PEAK
Two-way Stop -controlled Intersection
-----------------------------------------------------------------------
-----------------------------------------------------------------------
I Northbound I Southbound I Eastbound I Westbound
I L T R I L T R I L T R I L T R
No. Lanes 1 1 2 1 1 1 2 1 1 0 > 1 1 1 0 > 1 1
Stop/Yield I NI NI I
Volumes 1 8 974 441 39 656 111 13 0 61 14 0 21
PHF 1 .95 .95 .951 .95 .95 .951 .95 .95 .951 .95 .95 .95
Grade 1 0 1 0 1 0 1 0
MC's (a) I I I I
SU/RV's
CV's (o) I I I I
PCE's 11.10 11.10 11.10 1.10 1.1011.10 1.10 1.10
-----------------------------------------------------------------------
Vehicle
Maneuver
Adjustment Factors
Critical Follow-up
Gap (tg) Time (tf)
Left Turn Major Road 5.50 2.10
Right Turn Minor Road 5.50 2.60
Through Traffic Minor Road 6.50 3.30
Left Turn Minor Road 7.00 3.40
IC%.VI1111lril I%jq �
Improvements
Waterstone Apartments
(LSC #961680)
May, 1997
LEIGH, SCOTT & CLEARY, INC
LEGEND:
45 AM Peak —Hour Traffic
35 — PM Peak —Hour Traffic
40,000 = Signal
LEIGH, SCOTT & CLEARY,
e
riyure 5
2015 Total Peak -Hour and
Average Weekday Traffic
Waterstone Apartments
(LSC #961680)
May, 1997
30
5
AM Peak —Hour Traffic
PM Peak —Hour Traffic
I RTC smW k CI RARY TNC
Ural
Peak -Hour Traffic
Waterstone Apartments
(LSC #961680)
May, 1997
LEGE�
ss _ AM Peak —Hour Traffic
ze PM Peak —Hour Traffic
r.�
3
1 %Jjlu%. L %. qul Irl CX LIU
Peak -Hour Traffic
Waterstone Apartments
(LSC #961680)
May, 1997
LEIGH. SCOTT & CLEARY. INC
i iy uI �
Directional Distribution of
LEGEND: Project -Generated Traffic
Waterstone Apartments
60% = Percent Distribution of Project —Generated Traffic (LSC #961680)
May. 1997
SLEIGH, SCOTT & CLEARY, INC.
LEGEND:
26 AM Peak —Hour Traffic
31 PM Peak —Hour Traffic
= Signal
f = Stop Sign
LEIGH, SCOTT & CLEARY, INC
Scale
000,
Figure 1
Site Location, Existing Traffic
Controls and 1997 Traffic
Waterstone Apartments
(LSC #961680)
May, 1997
Table 2
Intersection Level of Service
Waterstone Apartments Addendum
Fort Collins, Colorado
Existing Traffic
Level of Level of
Project -Generated
Plus 2000Traffic
Level of Level of
Project -Generated
Plus 2015 Traffic
Level of Level of
Intersection Service Service Service Service Service Service
Intersection Location Control AM PM AM PM AM PM
Crestridge Street & College Avenue
Unsignalized F (1) F (1)
F (1)
F (1)
F (1)
F (1)
College Avenue & Site Access (RTO)
Unsignalized
A
A
B (2)
C (2)
Notes:
(1) Eastbound and westbound left -turns.
(2) Eastbound right -turns.
N
Trip
Generatior Average
Land Use Units Weekday
Apartments 220 d.u. (2) 6.29
(1) Source for Trip
(2) Dwelling Units.
Table 1
TRAFFIC GENERATION ESTIMATES
Waterstone Apartments
Fort Collins, Colorado
Trip Generation Rates
Peak -Hour Trips (1)
kM In AM Out PM In PM 6
0.09 0.42 0.41 0.19
Generation", 5th Edition, 1991, Institute of
Average Peak -Hour Trips
Weekday AM In AM Out PM In PM C
1,384 19 92 90 42
xtation Engineers.
Mr. Bernard Shomberg Page 3 May 29, 1997
• Traffic associated with the buildout of the Waterstone Apartment development can
safely be accommodated by the existing roadway network with the improvements
recommended herein and in the Waterstone Apartment report, dated January 7, 1997.
We trust that this letter will assist with further planning of the Waterstone Apartment complex
development. Please call if we can be of additional assistance.
Respectfully submitted,
LEIGH, SCOTT & CLEARY, INC.
By:
Alex J. Aiiniello, P.E. _
AJA/MM/wd
Enclosures: (1) Tables 1 and 2
(2) Figures 1 through 6
(3) Capacity Analysis Printouts
C:\PROJECTS\1996\961680\WATERSTN.ADD
Mr. Bernard Shomberg Page 2 May 29, 1997
only site access point, the resulting project -generated traffic on the street system can be
computed. These traffic volumes are shown in Figure 3. This figure shows the number of
project -generated vehicle turning movements expected at the intersection and access point
mentioned above.
Future Total Traffic
The 2000 and 2015 background traffic volumes in the previous report (Figures 5 and 6) were also
used as the 2000 and 2015 background projection for this analysis. The project -generated peak -
hour traffic volumes (Figure 3) have been combined with the 2000 and 2015 "background" traffic
volumes from the previous report to yield total 2000 and 2015 traffic volumes for the morning
and evening peak -hour, as shown in Figures 4 and 5. Traffic volumes illustrated in these figures
have been rounded to the nearest five vehicles per hour.
:-�*o
The traffic impacts associated with the apartment complex site were analyzed in accordance with
the requirements of the 1985 Hig1wglQgI=i u Manual (HCM) (with the 1994 update), using the
"operations" methodology. The results of the capacity analysis are summarized in Table 2. They
show that the intersection of Crestridge Street with College Avenue presently has delays for both
eastbound and westbound left -turns during the morning and evening peak -hours. These delays
are expected to continue through 2015. Although long delays will be experienced by vehicles
attempting this left -turning movement, the volume of vehicles is not expected to be large enough
to warrant the signalization of this intersection. The site's right -turn -only access onto College
Avenue would operate at a satisfactory level of service with the addition of buildout traffic and
continue to operate at an acceptable LOS by 2015. (The revised capacity analysis printouts for
Crestridge Street/College Avenue and the right -turn -only site access point are enclosed.)
The site access intersection with College Avenue should provide a raised curb island to prevent
left turns at this intersection. Figure 6 illustrates this recommended improvement.
uonausion
Based on the analysis presented herein, the following conclusions may be made:
At buildout, the proposed Waterstone Apartments are projected to generate 692
entering and 692 exiting vehicles -trips during an average weekday. Of these, 19 would
enter and 92 would exit during the morning commuter peak -hour, and 90 and 42
would enter and exit, respectively, during the evening peak -hour.
• The unsignalized full movement intersection of Crestridge Street with College Avenue
will incur some delays for exiting left -turning movements with the existing Stop sign
control. However, signalization would not be warranted with the expected volumes of
traffic.
LEIGH, SCOTT & CLEARY, INC.
TRANSPORTATION PLANNING
DEC 2 3 REM
& TRAFFIC ENGINEERING CONSULTANTS
1889 York Street
Denver, CO 80206
(303)333-1105
FAX (303) 333-1107
May 29, 1997
Mr. Bernard Shomberg
Paramount Concepts, Inc.
3333 S. Wadsworth, # 104
Lakewood. CO 80227
Re: Waterstone Apartments Addendum
Fort Collins, CO
(LSC #961680)
Dear Mr. Shomberg:
This letter presents an updated summary of our analysis of the traffic impacts associated with
the Waterstone Apartments development in Fort Collins, Colorado. It constitutes an Addendum
to our report on this project, dated January 7, 1997.
Subsequent to the previous report, the access requirements for the site have changed. Figure 1
illustrates the site location with the surrounding roadway system. The proposed full movement
access on SH 287 which directly accessed the site has been changed to a right -turn -only (RTO)
access. In addition to the R TO access a second access to the site was added. This second access
would be an extension of Venus Avenue northward from Crestridge Street. The remainder of this
report presents our findings concerning the traffic impacts of the proposed apartment complex.
Estimated Traffic Generation
Since the number of dwelling units and type of land use from the previous report did not change,
the traffic generation estimates of the earlier report were used. A copy of the "Traffic Generation
Estimates" (Table 1) table is also enclosed with this letter.
Traffic Distribution
The directional distribution of project -generated traffic from the previous report was revised to
reflect the right -turn -only access and new access to Crestridge Avenue. These percentages are
represented for both 2000 and 2015. As illustrated in Figure 2, travel to and from the north
would be on College Avenue with 60 percent and to and from the south with 40 percent.
Traffic Assignment
By applying the traffic generation estimates from Table 1 of the previous report to the distribution
patterns of Figure 2 for the intersection of Crestridge Street/College Avenue and to the right -turn -
ATTACHMENT M