HomeMy WebLinkAboutWATERSTONE APARTMENTS - 7-97A - SUBMITTAL DOCUMENTS - ROUND 1 - TRAFFIC STUDYcY HCS_-Unsionalized Intersections Release 2.1d
---- --___ SACDPIST.HCO Paoe 2
--- Worksheet for TWSC Intersection
Step 1: RT from Minor Street -------------
--------WB
--------------- -------------
-
-----------------------
Conflicting Flows: (voh)
-----
Potential Capacity: (pcph)
13tJ6
Movement Caoacitv: (pcph)
30=
Prob. of Queue -Free State:
302
---------------- ----------------
U.9-
------------
teD 2: LT from Major Street
_______
----------------------- --------------------
NE
Conflicting Flows: (vph)
______ -------
Potential CaDaGity: (pcph)
2669
Movement Capacity: (pcph)
63
Prob• of Queue -Free State:
63
J ,�-7
-------------
Step 4: LT from Minor Street
Wb
---------EB
---------------
---------------------- Conflictino Flows: (vph)
___
Potential Capacity: (pcph)
4914
Major LT, Minor TH
1
Impedance Factor:
Adjusted Impedance Factor:
`-).Ou
Caoacity Adjustment Factor
due to Impeding Movements
Movement Capacity: (pcph)
--------=----------------------------
Intersection Performance Summary
Flow Move Shared Total
Queue
Rate Cap Cap Delav
Movement (pcph) (pcph)
Lenoth LDS
Approach
Delav
(pcph)(sec/veh)
(veh)
---- ------
t-------)
-------
ES L 29 *
------------
---------
* F
EB R 23 302 12.9
0
NB L 46 63 146.3
2,4 F
2.7
Intersection Delav = *
* The calculated value was greater than 999.9.
HCS: Unsignalized Intersections Release 2.1d SACOPI5T.HCO Page 1
LEIGH. SCOTT AND CLEARY. INC. ----
---------------
1869 York Street
Denver. CO 80206-
Ph: (303) 333-1105
---------------------------------------------------------------
------------------- ____
Streets: (N-S) College Avenue (E-W) Site Access_
Major Street Direction.... NS
Length of Time Analyzed... 15 (min)
Analyst.. ......... SMD
Date of Analysis...... 1/3/97
Other Information........2015 total .
Two-wav Stoo-controlled Intersection traffic. PM PEAK
Northbound ; Southbound ; Eastbound
L T Westbound
---- R , L T R ; L T R ; L T R
-
---- --
---;---- ----
No. Lanes ; 1 2 0; 2 1-------- ---- ----
0
Stoo/Yi el d; N1 �) 1 U r) p
; N
Volumes 40 2120 2481,) 55 ; 25 ?i> ;
PHF .95 .95 .95 .95; .95
Grade 0 .95;
0 U
MC's (::i ,
SU/RV's l%);
CV's (7.)
PCE's ;1.10
---- ----
Adjustment Factors
Vehicle
Maneuver
Left Turn Major Road
Right Turn Minor Road
Through Traffic Minor
Left Turn Minor Road
Critical Follow-uc
Gao (tg) Time (tf )
--------------------------------------
S.SU
i.10
5.50
2.60
Road 6.50
7.0u
3.4:i
.. HCS:
------Unsignalized Intersections Release 2.1d SACOAI5T.HCO P
---------- -___--- age 2
-Worksheet for TWSC Intersection
-------- -----
----------
Step 1: RT from Minor ----------WB-------
Street
______
-------------- ---------------
EB
Conflicting Flows: (vph)
___ --------_
Potential Capacity: (pcohi
652
Movement Caoacity: (pcph)
647
Prob. of Queue -Free State:
647
------------------ -----------
0.93
-----------
Step 2: LT from Major Street
-5E---_______
__
-----
----------- ------- ---------------------------------
NB
Conflicting Flows: (voh)
Potential Capacity: (pcoh)
1321
Movement Caoacity: (pcoh)
'35
Prob. of Queue -Free State:
335
--------------- -------------
0.96
-------------We-----------EB
Step 4: LT from Minor Street
--------------- ----------------
onflictinq Flows: (vph)
---------J319
___
Potential Capacity: (pcoh.)
Major LT, Minor TH
8
Impedance Factor:
Adjusted Impedance Factor:
0,96
Caoacity Adjustment Factor
0.96
due to Impeding Movements
Movement Capacity: (pcph)
`� 96
------------ ---------- -----------------------------
Intersection Performance Summary
Avo .
Flow Move Shared Total
95i.
Queue
Cap CaD elav
(pcph) (pcph)
Lenoth LOS
Approach
DelavMavement
(pcph)(sec/•veh)
--------
(veh)
------
(sec/ven)
-------
ES L 64
-----
---7.3 F
EB R 46 647 6.0
0.1 B
k
NB L 12 33z5 11.1
Intersection Delav, =
68.5 sec/veh
* The calculated value was greater than 999.9.
►r
HCS:-Unsionalized-Intersections Release 2.1d SACOAIST.HCO Paoe 1
LEIGH. SCOTT AND CLEARY. INC,__________________________________________
1889 York Street
Denver, CO 80206-
Ph: (3o3) 333-1105
----------------------------------
---------------------------_______----------
Streets: (N-S) Colleoe Avenue ---`----- =__
Major Street Direction.... NS (E-W) Site Access
Length of Time Analyzed... 15 (min)
Analyst ...................
SMD
Date of Analysis....... 1/3/97
Other Information.........2015 total traffic. AM PEAK;
Two-way Stoo-controlled Intersection
-------------------------- ___________
Northbound Southbound -'----
L T R I L T R LEastbound t LWestboundR
R
--, 0 2 1 1 1 --- ---- ---- ----
No. Lanes 1 2 U Stop/Yield ; 1\1% } 1 % 0 c) 0
Volumes 10 1E95
PHF .95 .95
Grade ()
MC' s
SU/RV's c%);
CV's (%) ;
PCE's !1.10
---------------------
1'240
.95
0
15% 55 40;
95% .95 .95%
,
' t1.10
1.10;
--------------------------------------
Adjustment Factors
Vehicle
Maneuver
Critical
------------ -----------------------------------
Sao (to)
Left Turn Major
Road
5.50
Richt Turn Minor
Road
5.50
Through Traffic
Minor Road
6.50
Left Turn Minor
Road
7.00
Follow-uo
lime (tf)
------------
.1. 1U
2.60
,...z. U
3.4c,
HCS:-Unsianalized-Intersections
-- Release 2.1d----SACOP20T.HC0---Paae-2
-----Worksheet for TWSC
Intersection
--------
--------------
1: RT from Minor Street
WB--------
--
-------------
EH
Conflicting Flows: (vph)
____
-----
Potential CaDaCity: (DCDh)
937
Movement Caoacity: (pcoh)
521
Prob. of Queue -Free State:
521
-------------
0.9e,
Step 2: LT from Major Street
-----------
SE
NE
------- ------
-
--------------- Conflictina Flows: (voh)
----------------
Potential Caoacity: (pcph)
173-
Movement Caoacitv: (pcoh)
202
Prob. o+ Queue -Free State:
202
-------------------- ------------------
0.77
Step 4; LT from Minor Street
--
-WE-------------
---------------- -----------
EB
Conflictina Flows: (voh)
_
Potential Caoacity: (pcoh)
Major LT. Minor TH
Impedance Factor:
Adjusted Impedance Factor:
0.77
Caoacity Adjustment Factor
0.77
due to Imoedina Movements
Movement Caoacity: (pcph)
--------------------------------
------------------------
��'��
Intersection Performance Summary
Avo. 95".'
Flow Move Shared Total Queue
Rate Cao Cao Auoroach
Movement (Dcph) Pcph) ( Delay Lveena) LOS Delay
pcph)(sec/veh) (h)
-------- -------------
(sec/veh)
cH L 9 ---3.2 F
ES R
NH L 46
521 7.
. H
202 23.0 0.8 D
Intersection Delav = 19.4 sec/veh
* The calculated value was greater than 999.9.
*
0.6
HCS: Unsianalized Intersections Release 2.1d SACOP20T.HC0 Paoe 1
LEIGH. SCOTT AND CLEARY. INC.
1889 York Street
Denver. CO 80206-
Ph., (303) .3.33-1105
Streets: (N-S) College Avenue (E-W) Site Access
Major Street Direction.... NS
Lenoth of Time Analvzed... 15 (min)
Analyst...................
SMD
Date of Anal vsi s....... 1 / 3/ 97
Other Lnformation......... 2000 total traffic. PM PEAK
Two-wav Stoo-controlled Intersection
Northbound Southbound : Eastbound -
WestbounC
-L -- -T - R : L T R : L T R : L T R
---- ---- --- --
No. Lanes 1 ? 0 0 2 -- ---- ----
1 1 0 1 C) Stoo/Yield N; N; u 0
Volumes : 4O 1450 ; 1590 55 : 25 2
PHF : 95 95 0
95 .95; .95 .95;
Grade 0 0
MC's (Y.) 0
:
SU/RV's (%):
1
PCE's
:1.10 1.10;
-------------------------------------
Adiustment Factors
Vehicle
Maneuver
Critical
Follow-url
---------------------------------
Gao (to)
Time (tf)
Left Turn Major
Road
5.50
Right Turn Minor
Road
5.50
2.10
Through Traffic
Minor Road
6.50
2.6�
Left Turn Minor
Road
7.00
�'�V
HCS_-Unsionalized-Intersections Release 2.1d SACOA20r.HC0 Paae _
----------------
---------------------------
Worksheet for TWSC Intersection
----------------------
Steo 1: RT from Minor Street
__
-------------------
WE
ES
Conflictino Flows: (voh) -
--
Potential CaDaCity: (Dcoh)
418
Movement Caoacitv: (ocoh)
850
Prob. of Queue -Free State:
850
------------------ --------------------------
0.95
Steo 2: LT from Maior Street
--------------------- ----------------
N5
_____________
Conflictino Flaws: (vah)
-
___
Potential Caoacitv: (Dcoh)
85:;
Movement CaDacity: (Dcoh)
597
Prob. of Queue -Free S
59''
---------tatee
U.98
Steo 4: 4: LT from Minor S
..treet
-
----------------------------------------
W8
ES
Conflictino Flows: (vDh)
Potential CaDacity: (ocoh)
2135
Maior LT. Minor TH
46
Imoedance Factor:
Adiusted Imoedance Factor:
0.98
Caoacitv Adiustment Factor
().9E
due to Imaecino Movements
Movement Caoacitv: ( DCDh)
U.9b
--------------- -------------------------------
15
Intersection Performance
Summary
Flow Move Shared Totai
Queue
Rate CaD Car) Delay
Movement (ocoh)
Lenoth LOS
~r)Deiavh
(Dcoh) (ocoh)(sec/veh)
--------
(veh)
�Sec �veh)
ESL
.45 420.4
-----
4,7
---------
EB R 4c 850 4.5
_
0.0 A
245.3
NB L 12 597 6.2
0.0 B
V.1
Intersection Delay =
11.0 sec/veh
-?CS: Unsionali=ed Intersections Release 2.1d SACOA20T.HCO Paae 1
_SIGH. SCOTT AND CLEARY. INC.
1B89 York Street
Denver. CO 80206-
Ph: (303) 333-1105
----------------------------------------------------------
-------------------------
Streets: (N-S) Collece Avenue (E-W) Site Acces=-
Maior Street Direction.... NS
Lenoth of Time Analyzed... 15 (min)
Anal vst................... SMD
Date o+ Analvsis.......... 1/3/97
Other In+ormation......... 2000 total traffic. AM PEAK
Two-wav Stoo-controlled Intersection
Northbound ; Southbound ; Eastbound t Westbounc
L T R ; L T R ; L T R ; L T R
--------.'---- ----
No. Lanes 1 2 0 ; 0 2 1 1 1 0 1 ;
Stoo/Yield 0 0N� N;
Volumes ; 10 1215 795 15; 55 40;
PHF .95 .95 .95 .95: .95 95;
Grade 0 0
MC's (;:) '7
CV's (%)
PCE's ;1.10
'1.10
----------------------------------------------------1-10---------------
Adiustment Factors
Vehicle Critical F
ManeuverGao (to) Time ttoi 1 ow-uo
------------------ -
-------------------------
Left Turn MaSor Road
5.5U---------------± 1',---
Richt Turn Minor Roac 5.5i:,
Throuch Traffic Minor Road 5; 2. 6C
6. t� �. 30
Lett Turn Minor Roae 7.uC} 3.4u
APPENDIX B
Level of Service Analyses
Counter Measures
*** Weekly Summary
for week
of December 31,
1996 ***
Page 2
Data File
: M1296010.PRN
Btation
: 000000000001
Lane(s) :
2
Identification
: 000000000001
Direction :
Northbound
City/Town
: FT. COLLINS
County :
BOULDER
-ocation
: US 287 N/O CRESTRIDGE
ST
5 6 31
1
2 3
4 Wkday
Daily
Time
----- -----
Sun Mon Tue
----- -----
Wed
-----
Thu Fri
----- ----- -----
Sat Avg.
-----
Avg.
-----
01:00
3
7
5
4
D2:00
0
13
7
5
D3:00
4
21
13
9
04:00
21
73
47
34
05:00
52
172
112
80
)6:00
134
312
223
159
07:00
212
368
290
207
08:00
357
102
230
164
J9:00
573
634
604
431
10:00
441
576
509
363
11:00
473
552
513
366
12:00
492
531
512
365
13:00
649
649
464
14:00
927
927
662
15:00
1142
1142
816
16.00
1362
1209
1286
918
17:00
1248
1001
1125
803
18:00
1112
1072
1092
780
19:00
986
745
866
618
20:00
728
637
683
488
21:00
57
429
243
174
22:00
34
72
53
38
23:00
27
29
28
20
24:00
16
13
15
10
----- -----
Totals
----- -----
5570
-----
10687
----- ----- -----
3361
-----
11168
-----
7977
o Avg Wkday
49.9
95.7
30.1
o Avg Day
69.8
134.0
42.1
AM Peak Hr
09:00
09:00
AM Count
573
634
PM Peak Hr
16:00
16:00
PM Count
1362
1209
Counter Measures
*** Weekly Summary
for week
of December 31,
1996 ***
Page 1
data File
: M1296010.PRN
Station
: 000000000001
Lane(s) :
1
Identification
: 000000000001
Direction :
Southbound
-ity/Town
: FT. COLLINS
County :
BOULDER
-ocation
: US 287 N/O CRESTRIDGE
ST
5 6 31
1
2 3
4 Wkday
Daily
Time
----- -----
Sun Mon Tue
----- -----
Wed
Thu Fri
----- -----
Sat Avg.
Avg.
01:00
-----
4
-----
8
-----
6
-----
4
J2:00
1
3
2
1
D3:00
2
7
5
3
04:00
17
32
25
18
05:00
22
57
40
28
)6:00
47
18
33
23
07:00
58
234
146
104
08:00
123
533
328
234
)9:00
324
524
424
303
10:00
612
498
555
396
11:00
721
547
634
453
12:00
689
612
651
465
13:00
1213
1213
866
14:00
1172
1172
837
15:00
1293
1293
924
16:00
1342
1178
1260
900
17:00
1402
1001
1202
858
18:00
1369
972
1171
836
19:00
1312
853
1083
773
20:00
531
772
652
465
21:00
107
312
210
150
22:00
58
117
88
63
23:00
31
47
39
28
24:00
17
21
19
14
----- -----
Totals
----- -----
6169
-----
11571
----- ----- -----
3073
-----
12246
-----
8747
s Avg Wkday
50.4
94.5
25.1
o Avg Day
70.5
132.3
35.1
aM Peak Hr
11:00
12:00
aM Count
721
612
PM Peak Hr
17:00
15:00
DM Count
1402
1293
Counter Measures
Site Code : 6
4-S Street: US 287
:-W Street: CRESTRIDGE ST/SMOKEY ST.
------------------------------------
Movements by: Primary
PAGE: 1
FILE: US287CRE
DATE: 1/02/97
PEAK PERIOD ANALYSIS FOR THE PERIOD: 4:00 PM - 6:00 PM
DIRECTION
START
PEAK HR
........ VOLUMES
........
....
PERCENTS ...
FROM
-----------------------------------------------------------------------------------------------
PEAK HOUR
FACTOR
Right
Thru Left
Total
Right
Thru
Left
North
4:30 PM
0.96
24
1372 32
1428
2
96
2
East
4:15 PM
0.68
53
0 50
103
51
0
49
South
4:00 PM
0.93
34
1174 4
1212
3
97
0
West
5:00 PM
0.75
it
0 19
30
37
0
63
Entire
Intersection
North
4:15 PM
0.97
24
1352 38
1414
2
96
3
East
0.68
53
0 50
103
51
0
49
South
0.90
31
1141 5
1177
3
97
0
West
0.63
11
0 14
25
44
0
56
24 1352 38
L 1414 1
CRESTRIDGE ST/SMOKEY ST.
14
0
25
J
11
US 287
F 53
103 0
L 50
CRESTRIDGE ST/SMOKEY ST.
1177
5 1141 31
Counter Measures
.Skte Code : 6
4-5 Street: US 287
-W Street: CRESTRIDGE ST/SMOKEY ST.
Movements by: Primary
PEAK PERIOD ANALYSIS FOR THE PERIOD: 6:30 AM - 8:30 AM
DIRECTION
START
PEAK HR
........ VOLUMES ........
FROM
PEAK HOUR
FACTOR
Right
Thru Left
Total
----------------------------------------------------------------------------
North
7:30 AM
0.87
11
656 39
706
East
7:30 AM
0.80
21
0 14
35
South
7:15 AM
0.74
48
970 8
1026
West
7:30 AM
0.53
6
0 13
19
Entire
Intersection
North
7:30 AM
0.87
11
656 39
706
East
0.80
21
0 14
35
South
0.74
44
974 8
1026
West
0.53
6
0 13
19
11 656 39
706 J
CRESTRIDGE ST/SMOKEY ST.
13
1
0
19
61
US 287
PAGE: 1
FILE: US287CRE
DATE: 1/02/97
.... PERCENTS ...
Right Thru Left
-------------------
2 93 6
60 0 40
5 95 1
32 0 68
2 93 6
60 0 40
4 95 1
32 0 68
F
21
35
0
.
14
CRESTRIDGE
ST/SMOKEY ST.
F1026 -7
8 974 44
-Site Code : 6
I-$ Street: US 287
-W Street: CRESTRIDGE ST/SMOKEY ST.
rime
From North
3egin
------------------------------------
RT
THRU
LT
6:30
4
80
2
6:45
1
71
9
HR TOTAL
5
151
11
7:00 AM
0
85
5
7:15
4
100
7
7:30
2
133
6
7:45
2
173
16
HR TOTAL
8
491
34
8:00 AM
2
152
16
8:15
5
198
1
4:00 PM
4
314
14
4: 15
8
334
14
4:30
6
344
13
4:45
6
320
4
HR TOTAL
24
1312
45
5:00 PM
4
354
7
5:15
8
354
8
5:30
4
313
2
5:45
9
290
1
HR TOTAL
25
1311
18
------------------------------------
DAY TOTAL 69 3615 125
Counter Measures
-------------------------------------------
Movements by: Primary
From
East
From
South
RT
-------------------------------------------
THRU
LT
RT
THRU
LT
0
0
0
2
111
0
1
0
1
3
138
0
1
0
1
5
249
0
4
0
1
7
159
0
2
1
3
9
185
4
3
0
2
9
225
0
7
0
4
16
328
2
16
1
10
41
897
6
7
0
4
14
232
2
4
0
4
5
189
4
----------------
Break
------------------
12
0
6
7
271
0
10
0
12
10
316
1
11
0
12
11
287
0
11
0
9
6
300
3
44
0
39
34
1174
4
21
0
17
4
238
1
8
0
6
5
296
0
4
0
5
5
255
1
7
0
6
1
238
2
40
0
34
15
1027
4
112 1 92 114 3768 20
From West
RT THRU LT
1 1 0
0 0 2
1 1 2
1 0 2
0 0 5
0 0 4
0 0 4
1 0 15
1 0 1
5 0 4
PAGE: 1
FILE: US287CRE
DATE: 1/02/97
----------------
Vehicle
Total
----------------
201
226
427
264
320
384
552
1520
431
419
1 0
5
634
4 0
2
711
1 0
2
687
1 0
5
665
7 0
14
2697
5 0
5
656
2 0
2
689
3 0
6
598
1 0
6
561
11 0
19
2504
-------------------------------
26 1
55
7998
APPENDIX A
Existing Traffic
SECTION G
Conclusions
Based upon the foregoing analysis, the following conclusions can be made concerning the
traffic impacts and access requirements of the proposed Waterstone Apartments develop-
ment:
1. When completed, this 12-acre development will contain 220 dwelling units .
2. The vehicle -trips generated by the proposed development will total about 1,384
daily external trips. During the morning peak -hour, approximately ill trips
(19 entering and 92 exiting) will be generated. The evening peak -hour can
expect 132 external trips (90 entering and 42 exiting) during an average week-
day.
3. The access to the development will be provided by a full movement intersection
with College Avenue across from Bueno Drive. This access intersection onto
College Avenue is expected to operate with some delay for exiting left -turning
movements with the planned stop sign control. However, signalization would
not be warranted with the expected volumes of traffic. In addition, provisions
should be made for a possible future connection of the site south to Crestridge
Street.
4. The intersection of the site access driveway with College Avenue will require a
right -turn deceleration lane at the southbound approach. This deceleration
lane should be 450 feet in length with 270 feet of taper. This deceleration lane
may be designated within the shoulder area on the west side of College Avenue.
A left-tum deceleration lane will be required at the northbound approach to the
site access driveway/College Avenue intersection. This deceleration lane should
be 485 feet in length with an additional 25 feet of storage length. Added to this
510 feet should be an additional 270 feet of taper length. This left -turn
deceleration lane may be designated within the existing center left -turn lane.
A continuous right -turn lane should be designated at the southbound shoulder
on College Avenue between the southbound access and Crestridge Street.
G-1
Access to the Waterstone Apartments development would only be via a right -
turn -only access on College and a connection to Crestridge Street on the south.
Assuming a raised median constructed on College Avenue, the relatively high
number of left -turning vehicles exiting the project would have to travel south
on College Avenue or filter south through the residential neighborhoods to the
south. The next signalized intersection on College Avenue, south of the
development, is located at Skyway Drive, which is 2,000 feet south of the
proposed access intersection. The increased vehicle miles of travel and
potential impact on residential neighborhoods makes a right -turn -only access
on College Avenue for the Waterstone Apartments development an undesirable
option. It is therefore recommended that the Waterstone Apartments develop-
ment access intersection with College Avenue be a full movement intersection.
F-3
Fairway Ln.
Approx. Scale
1" = 800,
00
CPP
i f
Re —stripe for
v
Right —Turn Decel. v
Lane 450' Length g
+ 270' Toper At
Southbound Shoulder. Re —stripe Center Left —Turn Lone
Lane As Left —Turn Decel. Lane,
510' Length + 270' Taper.
SITE
m
Milky Way Dr.
Re —stripe Southbound Shoulder
S For Rlght—Turn Lane From
C Access to Crestridge St.
n u Saturn Dr.
z
Star Way
LEIGH. SCOTT & CLEARY. INC
Skywoy Dr.
I Figure 9
Recommended
Improvements
Waterstone Apartments
(LSC #961680)
January, 1997
F-2
SECTION F
Access Recommendations
Based on the analysis of traffic impacts associated with the proposed Waterstone Apart-
ments development, the following recommendations are offered:
• Analysis of the intersection of the site access point with College Avenue
indicates that left turns exiting the site are expected to experience long delays.
However, the volume of left turns exiting the site is not large enough to meet
any signalization warrants, and therefore this intersection should not be
signalized.
• It is recommended that a right -turn deceleration lane be striped at the south -
bound approach to the access driveway's intersection with College Avenue. This
deceleration lane should have a length of 450 feet with an additional taper
length of 270 feet. This deceleration lane may be designated within the
shoulder area on the west side of College Avenue. A left -turn deceleration lane
should be designated in the center left -turn lane at the northbound approach
to the site access intersection with College Avenue. This deceleration lane
should have. a length of 485 feet with an additional 25 feet. of storage length.
Additional to this length should be a 270 foot taper. These recommendations
are based on the requirements of The State Highway Access Code, 2 CCR 601-1
(1985). The lane and taper lengths are based on a posted speed of 55 mph. To
facilitate exiting right turns onto College Avenue and right turns onto Crest -
ridge, a continuous right -turn lane should be designated at the southbound
shoulder on College Avenue between the access and Crestridge Street. This
recommendation is illustrated in Figure 9.
• A report dated November 1988 entitled South College Avenue Access Control
Studu, compiled by Krager and Associates, Inc. for the City of Fort Collins
makes several recommendations affecting the vicinity of the proposed Water -
stone Apartment site. In this report, the following recommendation is made:
"Full turning movements are to be allowed only at signalized intersections....".
In addition, a circulation roadway is shown in Figures 13 and 14 that would
connect Crestridge Street south of the site with Fairway Lane north of the site,
thereby allowing traffic generated by the Waterstone Apartments as well as
traffic from other developments in this vicinity to access a full -movement
signalized intersection. This access proposal appears to be an acceptable
method to access College Avenue without creating a new full -movement,
unsignalized intersection as an access for the Waterstone Apartments site.
However, according to updated proposed land uses, the area to the north of the
Waterstone Apartments, through which this proposed circulation roadway
would pass, is now designated as open space and a city park. With these land
uses in place, a circulation roadway would not be possible and the access plan
proposed in the 1988 South College Avenue Access Control Study would not be
workable.
F-1
Description of Results
It is expected that for the Year 2000 total traffic condition, the left -turning traffic exiting
the site is expected to experience a Level of Service (LOS) "F" (failure) for both morning
and evening peak -hour periods. This LOS is expected to persist through 2015. Despite
the long delays that will be experienced by vehicles attempting this left -turning move-
ment, the volume of vehicles is not expected to be large enough to warrant the
signalization of this intersection.
E-6
LEGEND:
1.240 AM Peak —Hour Traffic
z'480 = PM Peak —Hour Traffic
40,000 = Average Weekday Traffic
H, SCOTT & CLEARY, INC
e
rigure 8
2015 Total Peak -Hour and
Average Weekday Traffic
Waterstone Apartments
(LSC #961680)
January, 1997
E-5
LEGE(�U.
10 _
ao —
AM Peak —Hour Traffic
PM Peak —Hour Traffic
LEIGH. SCOTT & CLEARY. INC
7
LV\J<J 1 V LQk
Peak -Hour Traffic
Waterstone Apartments
(LSC #961680)
January, 1997
E-4
LEGENu:
z.o _ AM Peak —Hour Traffic
z.aeo — PM Peak —Hour Traffic
40,000 = Average Weekday Traffic
LEIGH, SCOTT & CLEARY, INC
e
A
2015 Background Peak -Hour
and Average Weekday Traffic
Waterstone Apartments
(LSC #961680)
January, 1997
E-3
LEGEN
795 MM reoK—nour IraTTIC
`sso = PM Peak —Hour Traffic
25,600 = Average Weekday Traffic
LEIGH, SCOTT & CLEARY, INC
�IALIT wJ
e
5
1U-t-UM EMM E
Background Traffic
Waterstone Apartments
(LSC #961680)
January, 1997
E-2
SECTION E
Traffic Impacts
In this report, traffic impacts are expressed in terms of future intersection operational
analyses and in terms of project -generated traffic as an increment of future total traffic.
Future total traffic volumes in the vicinity of the Waterstone Apartments development will
be the sum of the project -generated traffic and the future"background traffic" which is
all other traffic that would be on the street system without any development on the
subject site.
Background Traffic
The estimates of future morning and evening background traffic are shown in Figures 5
and 6 for the Years 2000 and 2015, respectively. These projected traffic volumes were
provided by the City of Fort Collins and represent a three percent growth rate.
Total Traffic
The combined project -generated and future background traffic volumes for morning and
evening peak -hours are shown in Figures 7 and 8 for 2000 total traffic and 2015 total
traffic, respectively. Volumes have been rounded up to the nearest five vehicles per hour.
These volumes have been used as input into intersection capacity calculations discussed
in the following section.
Intersection Capacity Analysis
The traffic impacts of the Waterstone Apartments development can be described by
evaluating the resulting Levels of Service (LOS) at the intersections and the access points
that will be directly impacted by the development. The only intersection that is expected
to be significantly impacted will be the proposed access intersection with College Avenue.
Intersection capacities have been analyzed in accordance with the requirements of the
1985 Highway Capacity Manual (HCM), using the 'operations" methodology. Traffic
volumes used in the analyses include those from Figures 7 and 8. The complete analysis
reports are contained in Appendix B of this report.
E-1
LEGEN
55 _ AM Peak —Hour Traffic - r
s5 PM Peak —Hour Traffic
LEIGH. SCOTT & CLEARY. INC
I VjCI.L-%.=l ICI ULC�
Peak -Hour Traffic
Waterstone Apartments
(LSC #961680)
January, 1997
D-4
Assignment of Project -Generated Traffic
The assignment of project -generated traffic to the surrounding street system and to the
access points is shown in Figure 4 for the morning and evening peak -hour periods of an
average weekday. These assignments are made by applying the trip generation estimates
of Table 1 to the trip distribution percentage factors of Figure 3. The morning and
evening peak -hour traffic volumes are given in vehicle -trips per hour.
D-3
LEGEND:
e
..J 3
Directional Distribution of
Project -Generated Traffic
60% = Percent Distribution of Project —Generated Traffic waterstone (LS Apartments
LSC /J961680)
January, 1997
. LEIGH. SCOTT & CLEARY. INC.
D-2
SECTION D
Traffic Distribution and Assignment
Traffic Distribution
The directional distribution of generated vehicular traffic on the roadways providing
access to and from the proposed Waterstone Apartments development is one of the most
important elements in planning its specific access requirements and in determining its
traffic impacts on surrounding roadways and intersections. Major factors which have
influenced the traffic distribution assumptions include:
• The location of the development with respect to its planned land uses, other
nearby residential areas, and other activity and employment centers.
• The roadway network serving the site.
• The planned access system on the site.
• The existing traffic distribution system as evidenced by counts conducted
on January, 1997 by Counter Measures, Inc.
• The types of land uses to be constructed.
After considering the combined effects of these factors, specific distribution estimates
have been made. The results of these estimates and the percent of project -generated
traffic on the surrounding roadway system are shown in Figure 3. The percentages
shown are descriptive of the traffic during the evening peak -hour, which is the highest
traffic period in the day.
It is estimated that 60 percent of the traffic generated by the Waterstone Apartments
project will be directed to and from the north on College Avenue toward Fort Collins and
Harmony Road which has an interchange with Interstate 25. It is estimated that the
remaining 40 percent will be directed to and from the south on College Avenue.
D-1
0
N
Table 1
TRAFFIC GENERATION ESTIMATES
Waterstone Apartments
Fort Collins, Colorado
Trip Trip Generation Rates
Generatior Average Peak -Hour Trips (1) Averag
Land Use Units Weekday AM In AM Out PM In PM Out Weekd
Apartments 220 d.u. (2) 6.29 0.09 0.42 0.41 0.19 1,384
(2) Dwelling Units.
Generation", 5th Edition, 1991,
Vehicle -Trips Generated
Peak -Hour Trips
AM In AM Out PM In PM Ou
19 92 90 42
SECTION C
Traffic Generation
The amount of traffic to be generated by the Waterstone Apartments development has
been determined using trip generation rates published by the Institute of Transportation
Engineers (ITE) in its report, Trip Generation, 5th Edition, 1991. The resulting forecasts
are given in Table 1. The number of vehicle -trips expected to be generated by the Water -
stone Apartments development during morning and evening peak -hours and for an
average weekday are shown. The number of dwelling units is the basis for the trip -
generation estimate for an apartment development.
Based on these land uses and the ITE trip generation rates and the assumptions
described previously, the Waterstone Apartments development is estimated to generate
approximately 1,384 vehicle -trips per day on the average weekday (692 entering and 692
exiting trips within a 24-hour period). During the morning peak -hour, there will be about
19 entering vehicles and about 92 exiting vehicles. During the evening peak -hour, there
will be about 90 entering vehicles and about 42 exiting vehicles.
C-1
surveyed during the morning and evening peak travel periods of 6:30 to 8:30 AM and
4:00 to 6:00 PM, respectively. The actual peak -hours at these intersections generally
occurred from 6:30 to 7:30 AM and from 4:00 to 5:00 PM. The 24-hour counts on
College Avenue indicate that College Avenue south of the site carries about 23,400
vehicles per day.
Access Plan
One access point is planned to the public road system from the Waterstone Apartments
development. This access point, the site plan, and surrounding land uses are illustrated
in Figure 1. The access is planned to .be a full -movement, stop sign controlled inter-
section located approximately 900 feet north of the Crestridge Street/College Avenue
intersection, lining up with Bueno Drive. A future connection of the site is planned to
Crestridge Street.
B-4
LEA
"" PM Peak —Hour Traffic
23,400 = Average Weekday Traffic
LEIGH. SCOTT & CLEARY. INC
e
2
L. AIQLII IIJ. I VCLK I IVUI MI I
24-Hour Traffic Counts
Waterstone Apartments
(LSC #961680)
January, 1997
B-3
LEGEND:
Scale
D00'
Figure 1
s = Signal Site Location and
f = Stop Sign Existing Traffic Controls
H. SCOTT & CLEARY. INC
Woterstone Apartments
(LSC #961680)
January, 1997
B-2
SECTION B
Roadway and Traffic Conditions
The location of the proposed Waterstone Apartments development is shown in Figure 1.
This site is in an area which is located near the intersection of College Avenue/Crestridge
Street in Fort Collins. The area consists of residential and commercially zoned land.
Presently, the site is undeveloped. North of the site is a 40-acre city park and land
proposed as open space. Immediately to the south of the site exists undeveloped land
and further south is single-family residential development. College Avenue lies to the
east of the site and Crestridge Street lies somewhat south of the site.
Area Roadways
Major roadways, lane configuration, and traffic control devices in the vicinity of the site
are also illustrated in Figure 1. These roadways are described below along with a brief
discussion of anticipated future roadway construction and improvements.
• College Avenue (US 287) is a north -south major arterial with two through lanes
in each direction and a center left -turn lane. The cross-section width is 88 feet.
This width includes 12-foot wide shoulders on both sides as well as curb and
gutter. US 287 begins in Denver as Federal Boulevard and progresses north-
ward through Longmont, Loveland and Fort Collins and then onward toward
Wyoming. In the vicinity of the site, there are signalized intersections on
US 287 at Harmony Road, Fossil Creek Parkway and Skyway Drive, and there
is an unsignalized, full movement intersection at Crestridge Street at which
traffic from Crestridge Street is controlled by a stop sign. College Avenue is
classified as a Category 3 state highway with a posted speed limit of 55 mph.
• Crestridge Street is a two-lane, east -west, minor collector roadway that serves
the area south of the site. It has a 42-foot wide cross-section with curb and
gutter on the south side.
Present Traffic Volumes and Traffic Controls
Peak -hour turning movement counts were conducted by Counter Measures, Inc. on
January 2, 1997 at the intersection of College Avenue/Crestridge Street. Also, 24-hour
counts were conducted on College Avenue near the College Avenue/Crestridge Street
intersection. Figure 2 summarizes the results of these counts. These intersections were
SECTION A
Introduction
The Waterstone Apartments development is a proposed apartment development located
near the College Avenue/Crestridge Street intersection in Fort Collins, Colorado. The
project is planned to contain 220 dwelling units at completion of construction.
Paramount Concepts, Inc. has retained Leigh, Scott & Cleary, Inc. to prepare a traffic
impact analysis of this development. This report was prepared in accordance with the
latest requirements of Fort Collins. The purpose of this study is to determine the effects
on the safety and capacity of surrounding roadways and intersections due to the
construction and operation of the Waterstone Apartments. Specific steps taken in this
analytic process are described as follows:
• A review and analysis of present roadway and traffic conditions in the
vicinity of the site. This task included the review of intersection turning
movement counts conducted at the intersection of College Avenue/ Crest -
ridge Street.
• A determination of the amount of daily and peak -hour traffic that would
be generated by the proposed development and an analysis of the
directional distribution of the proposed traffic on the surrounding road-
way system.
• Projections of future background traffic and total traffic volumes (back-
ground plus site -generated) on the adjacent street system for Year 2000
and 2015 traffic conditions (beyond buildout).
• A determination of future traffic impacts associated with the proposed
development. These impacts are based upon estimates of the total
amount of traffic on the surrounding roadway system and the resulting
Levels of Service (LOS) at the key intersections in the vicinity of the
development.
• A determination of street and access improvements that will be necessary
to mitigate the traffic impacts associated with the proposed development.
A-1
TABLE OF CONTENTS
Section Description Page
A Introduction ......................................... A-1
B Roadway and Traffic Conditions .......................... B-1
C Traffic Generation ..................................... C-1
D Traffic Distribution and Assignment ....................... D-1
E Traffic Impacts ....................................... E-1
F Access Recommendations ............................... F-1
G Conclusions ......................................... G-1
Appendix A: Existing Traffic
Appendix B: Level of Service Analyses
LIST OF ILLUSTRATIONS
Figure Description Page
1 Site Location and Existing Traffic Controls .................. B-2
2 Existing Peak -Hour and 24-Hour Traffic Counts .............. B-3
3 Directional Distribution of Project -Generated Traffic ........... D-2
4 Project -Generated Peak -Hour Traffic ....................... D-4
5 2000 Peak -Hour Background Traffic ....................... E-2
6 2015 Background Peak -Hour and Average Weekday Traffic ...... E-3
7 2000 Total Peak -Hour Traffic ............................ E-4
8 2015 Total Peak -Hour and Average Weekday Traffic ........... E-5
9 Recommended Improvements ............................ F-2
Table
LIST OF TABULATIONS
Description
Page
1 Trip Generation Estimate ............................... C-2
Traffic Impact Analysis
Waterstone Apartments
Fort Collins, Colorado
Prepared for
Mr. Bernard Shomberg
Paramount Concepts, Inc.
3333 S. Wadsworth, # 104
Lakewood, CO 80227
Prepared by
Leigh, Scott & Cleary, Inc.
1889 York Street
Denver, CO 80206
(303) 333-1105
January 7, 1997
(LSC #961680)
Ji(
LEIGH, SCOTT & CLEARY, INC.
TRANSPORTATION PLANNING
& TRAFFIC ENGINEERING CONSULTANTS
1889 York Street
Denver, CO 80206
(303)333-1105
FAX (303) 333-1107
January 7, 1997
Mr. Bernard Shomberg
Paramount Concepts, Inc.
3333 S. Wadsworth, # 104
Lakewood, CO 80227
Re: Waterstone Apartments,
Fort Collins, CO
(LSC #961680)
Dear Mr. Shomberg:
We are pleased to submit our report of the traffic impacts of the proposed Waterston Apart-
ments project in Fort Collins, Colorado. This proposed 12-acre project site is located near
College Avenue and Crestridge Street. A total of 220 apartments is proposed.
We trust that our findings and recommendations will assist in obtaining approvals for the
Waterstone Apartments development. Please call if there are any questions or if we can be of
additional assistance.
Respectfully submitted,
LEIGH, SCOTT & CLEARY, INC.
By: C�
C:\PROJECTS\961680\WAIERSM.RPr
` TRAFFIC IMPACT .A.NALYSIS
FRT COLLINS, COLORADO
Lefgrh, Scaftt & Clear, Inc.
DEC 2 3 ROM
ATTACHMENT L