Loading...
HomeMy WebLinkAboutCOLUMBINE EAST LONG TERM CARE - FDP - 11-05A - CORRESPONDENCE -Number: 72 Created: 10/26/2005 [10/26/05] Provide calculations for the restrained length each direction from the 3- inch 90-degree bend on the domestic water service and label on the plans. Comments from Current Planning: On the Lighting Plan, please specify that the wall -mounted fixtures labeled as "CC" are "Full' cutoff. Also, please specify that the under -canopy fixtures labeled as "DID" are to be mounted with "Flush Mount and Flat Lens." Finally, please add the quantity of each fixture. Be sure and return all of your redlined plans when you re -submit. If you have any questions regarding these issues or any other issues related to this project, please feel free to call me at (970) 221-6750. Sincerely: T� Ted Shepard Chief Planner Page 4 Department: Water Utilities Issue Contact: Basil Hamdan Topic: Detention Ponds Number: 52 Created: 5/10/2005 [10/27/05] [5/10/05] Please provide an overflow spillway detail and location for all proposed detention ponds. Topic: Off -site easements Number: 37 Created: 3/29/2005 [10/25/05] Please provide a copy of the separate document that would allow the off - site construction of line ST-1. [3/29/05] The construction of ST-1 will involve acquiring an off -site easement from the owners of Tract A of Oakridge, if the area within Tract A where the work is proposed is already a drainage easement, then approval from the owner of that property should be secured. Topic: Retaining Wall Number: 38 Created: 3/29/2005 [10/25/05] The provided details on the grading plan show top and bottom of wall elevation, please specify material. [5/10/05] [3/29/05] At final, please provide a detail of the retaining wall being proposed in the detention pond. Topic: Utility Plans Number: 77 Created: 10/27/2005 [10/27/05] Please specify the riprap proposed to be buried. Please add note to the storm sewer profiles indicating that the system is privately owned and will be maintained by the property owner. Detail D-10 was modified to include holes drilled into the plate. Please clarify why was the detail modified, has the owner experienced icing problems with the typical detail before ? Department: Water Utilities Issue Contact: Roger Buffington Topic: Utility Plans Number: 70 Created: 10/26/2005 [10/26/05] There is an updated detail for 3- and 4-inch meter vaults. Please provide an email address and we will forward it to you. Number: 71 Created: 10/26/2005 [10/26/05] Correct the labeling of sizes and fittings on the water main as noted on the plans. Page 3 Number: 76 Created: 10/27/2005 [10/27/05] From Technical Services: The NW corner of Section 6 exists. You need to tie/survey to it. Topic: Sheet 2 Number: 67 Created: 10/25/2005 [10/25/05] Correct the spelling mistake in line 48 and add the other variance requests (total of 4 were approved). Topic: Sheet 6 Number: 62 Created: 10/25/2005 [10/25/05] Please add the street cut note: Limits of street cut are approximate. Final limits are to be determined in the field by the City Engineering Inspector. All repairs to be in accordance with Ctiy street repair standards. Number: 63 Created: 10/25/2005 [10/25/05] Please label sections A -A and B-B as "Onsite' . Topic: Utility Plans Number: 60 Created: 10/25/2005 [10/25/05] Please see JR in Technical Services regarding scanning requirements and bring your plans with you so that you can go over them with him. Number: 61 Created: 10/25/2005 [10/25/05] Construct the drive entrance off Rule Drive in accordance with detail 707. Number: 73 Created: 10/27/2005 [10/27/05] Please provide a legal and exhibit for the offsite 30' drainage easement to be dedicated to the city. Once reviewed and approved, the actual dedication statement will need to be completed prior to plan approval. The offsite temp construction easement needs to be recorded at the county and a copy of the recorded document has to be submitted to the city UNLESS stormwater is ok with just a letter from the property owner stating that you have permission to construct the drainage improvements. If Basil is ok with this, then I am too. Just provide me a copy of the letter and get the original to Basil in Stormwater. Department: Transportation Planning Issue Contact: Kurt Ravenschlag Topic: Transportation Number: 53 Created: 5/10/2005 [5/10/05] The intersection at Lemay Avenue and Rule Drive along the front of your site indicates directional ramps, which are to standard, that align with radial ramps to the south and west. This creates an awkward maneuver and could be mitigated by moving the directional ramps closer together to reduce the offset currently created. Page 2 STAFF PROJECT REVIEW City of Fort Collins VF RIPLEY Date: 11/02/2005 SANDY MCFERON 401 W. MOUNTAIN AVE, SUITE 201 FORT COLLINS, CO 80521 Staff has reviewed your submittal for COLUMBINE EAST LONG TERM CARE PDP, 4824 S LEMAY AVE, TYPE II AND FINAL PLANSI, and we offer the following comments: ISSUES: Department: Engineering Issue Contact: Susan Joy Topic: Detail Sheets Number: 64 Created: 10/25/2005 [10/25/05] Please remove the revised detail D10 and replace it with the City's approved detail D10. Topic: Elevations Number: 59 Created: 10/25/2005 [10/25/05] Cool! I really like the 3D effect - it makes it easy to visualize the project. Thanks. Topic: Landscape Plans Number: 57 Created: 10/25/2005 [10/25/05] Please see JR in Technical Services regarding scannability requirements. Number: 58 Created: 10/25/2005 [10/25/05] Please show, label, and dimension all easements. Topic: Plat Number: 65 Created: 10/25/2005 [10/25/05] From Technical Services: Boundary and Legal close. Number: 66 Created: 10/25/2005 [10/25/05] From Technical Services: The NW corner of Section 6 exists. Need to tie the survey to it. Number: 68 Created: 10/25/2005 [10/25/05] Please spell out all abbreviations (esmt = easement). Number: 75 Created: 10/27/2005 [10/27/05] From Technical Services: The boundary and legal close. Page 1