Loading...
HomeMy WebLinkAboutCOLUMBINE EAST LONG TERM CARE - PDP - 11-05 - REPORTS - CORRESPONDENCE-HEARING'p14iyA8s0CIATE8 INC Landscape Architecture Urban Design Memorandum February 28, 2005 PROJECT I NO.: Columbine East — Existing Trees TO: Tim Buchanan / Ted Shepard From: Louise Herbert / Sandy McFeron. The following was discussed and determined at a site visit on 2123/05: 1) Trees — on site: Planning a) 1 — mature spruce. Mitigate with 5 trees. b) 1 — mature apple. Mitigate with 4 trees. c) 3 — cottonwood. Mitigate with 9 trees. d) 1 — mature tulip tree. Mitigate with 2 trees. e) 1 — mature cottonwood. The base of the tree was hollow. It was agreed that this did not qualify to be mitigated and should be removed. 2) Trees/ vegetation — South Lemay. (Right -of -Way). a) 2- cottowood north.Mitigate with 4 trees. b) Tim Buchanan to evaluate other mature cottonwood and confirm their speck requirements. c) Smaller vegetation can be romoved with no mitigation required. d) Existing grades on Lemay should be maintained especially around the existing trees. e) Proposed sidewalk adjacent to Lemay. Alignment was satisfactory in relation to the existing trees. f) Trimming. Trees were last trimmed 7 years ago. Tim confirmed that the cost for further trimming / pruning will be the client's responsibility. 401 West Mountain Ave. Suite 201, Fort Collins, CO 80521-2604 Phone 970.224.5828 Fax 970.224.1662