HomeMy WebLinkAboutRAVEN VIEW - MODIFICATION OF STANDARD - 12-05A - SUBMITTAL DOCUMENTS - ROUND 1 - TRAFFIC STUDYco
(n
L0
O
CD
0
0
Q
0
J
0
U
z
z
Q
J
W
'o
J
W
7
Cr
0
z
W
z
W
'Jn
V
N
r
N
N
W
IL
7
TW
Li
r
d
07
0
LO
d)
(0
to
O
rn
X
Q
LL
CD
0
N
CD
0
rn
iii
z
0
0-
0
z
R
W
W
z
z
W
z
0
a
¢
0
a
W
z
d
¢
05
U
LL
LL
Q
cc
-
MEMORANDUM
To:
Anne Aspen,
Fort Collins Planning
Susan Joy, Fort Collins Engineering
Eric Bracke,
Fort Collins Traffic Engineer
Russ Wells,
Anchor Development Corporation
Tom Peterson, Stanford Real Estate LLC
From:
Matt Delich
4i
_ l�
Date:
October 7, 2005
Subject:
Raven View
Development Transportation Impact Study -
Response to
staff comments (File: 0477ME03)
This memorandum responds to transportation related comments contained
in Staff Project Review for Raven View PDP, Type 1, dated October 5,
2005. The comments are: #108 - Pedestrian LOS; and 490 - Traffic
Study.
The pedestrian level of service comment is being addressed in a
separate letter requesting a modification of standard. I had a
conversation with David Averill, Transportation Planner. He requested
the modification letter. I am sending five copies to Anne Aspen and
one copy directly to David Averill.
The traffic study comment requests another copy of the updated TIS.
The traffic study was not updated, but an amendment memorandum (dated
April 27, 2005) was prepared and submitted. This memorandum provided
updated pedestrian level of service analysis and a request to accept
the TIS and the memorandum, rather than revising the entire TIS for a
few minimal changes.
It is respectfully requested that these two documents (the TIS and the
Memorandum) be accepted as they currently stand. Thank you.