Loading...
HomeMy WebLinkAboutSUNRISE RIDGE - ANNEXATION & ZONING - 13-05 - CORRESPONDENCE - (6)Ted Shepard - Re: Fwd: Sunrise Ridge �stion about Parcel F Willowbrook Page 2 >>> "Smith, Kelly Dean (OpenView Software)" <kelly.smith5@hp.com> 04/06/2005 9:41:34 AM >>> Ted, We're currently negotiating with Village Homes to purchase Parcel F, Willow Brook, FTC (2001075030). Parcel F is a triangular 1/4-acre lot that's physically attached to our Sunrise Ridge property. Rock Creek Drive currently stops in front of this property. As part of their compensation, Village Homes is requiring us to take over their escrow with The City of Ft. Collins for the completion of Rock Creek Drive in front of the parcel. The escrow obligation in Subheading II (Special Conditions), Paragraph D.5.(A) of the August 13, 2001 development agreement is $16,149.90. Will a irrevocable Letter of Credit work for the escrow, or is cash required? Is this a fairly easy process to provide substitution for part of their development agreement? Part of the contract states that Sunrise Ridge will be able to use the Village Homes detention pond in the southwest corner of our property (I think it's Parcel G). Do you see any problems with this arrangement? Our plan is to make the detention pond a little bigger, and then landscape, etc., as required. Thanks in advance for your response. Hope all is well with you. Kelly Smith CC: <TSHEPARD@fcgov.com> Ted Shepard - Re: Fwd: Sunrise Ridge -istion about Parcel F Willowbrook Page 1 From: "Mark McCallum" <MMcCall um@villagehomes.com> To: <MVIRATA@fcgov.com>, <kelly.smith5@hp.com> Date: 04/26/2005 10:38:29 AM Subject: Re: Fwd: Sunrise Ridge - question about Parcel F Willowbrook Marc and Kelly - Sorry for the late response. We tracked down the spreadsheet and the check that we submitted to the City of Fort Collins for Rock Creek Drive. The check was for $67,019.58 (ck # 098423), which is for all three stubbed streets within our development. We agreed on the amount with Matt Baker. The amount for Rock Creek Drive was $22,017.30. Kelly I quoted the 1/2 price width, thus the contract would have to be modified. I hope this helps. -Mark >>> "Marc Virata" <MVIRATA@fcgov.com> 4/12/2005 11:44:12 AM >>> Kelly, You had emailed Ted Shepard last week with regards to an escrow obligation that was specified on the development agreement for Willow Brook (Observatory Village). Per the DA, cash is required, a letter of credit will not satisfy this requirement. I do have a question or concern relating to the dollar amount. I have been unable to track thus far the agreed to dollar amount and whether such a dollar amount was received (I've copied Mark McCallum on this email to see if he may have some information on this.) The estimate that I have for our files prepared by TST Engineers (the consultant for Willow Brook) shows an estimate of $19,064.45 and I don't have information to indicate the dollar amount is for $16,149.90. Perhaps Mark has records to show otherwise, which would be helpful for all. Assuming a deposit was originally received it shouldn't be of any difficulty to substitute you providing the deposit in the same dollar amount. Thanks, Marc P. Virata, P.E. Civil Engineer II City of Fort Collins - Engineering Department Phone: (970) 221-6605 Fax: (970) 221-6378 mvirata@fcgov.com