Loading...
HomeMy WebLinkAboutSUNRISE RIDGE, 2ND FILING - PDP - 13-05D - CORRESPONDENCE - OTHER WATER AND OR SANITATION DISTRICTSFORT COLLINS-LOVELAND WATER DISTRICT v January 8, 2007 Mr. Ted Shepard, Planner City of Fort Collins P.O. Box 580. Fort Collins, CO 80525 RE: #13-05D Sunrise Ridge, 2°d Filing PDP Dear Mr. Shepard, C0SOUTH FORT COLLINS SANITATION DISTRICT JAN 0 9 2007 The Fort Collins - Loveland Water District and the South Fort Collins Sanitation District have reviewed the above mentioned project and submit the following comments. The District does not allow trees, tree canopies or landscaping within the District's easement or within10 feet of District facilities. There are numerous errors in the general notes regarding the Fort Collins — Loveland Water District and the South Fort Collins Sanitation District. For example, in note #13 there is no entity known as the Fort Collins — Loveland Sanitation District. The general notes need to be reviewed and corrected. The Districts do not sign the plat; therefore, the signature lines are to be removed. The proposed water line lowering is to be accomplished by joint deflection. The lowering typical is to be deleted. The District will require another review due to the nature of the above comments. Please do not hesitate to contact me at 226-3104, ext. 104, if you have any questions or require additional information. Respectfully, Mr.. W. Farrill, P.E. Di 'ct Engineer xc: Mr. Michael D. DiTullio, District Manager Mr. Mark Oberschmidt, P.E., Northern Engineering Mr. Kelly Smith 5150 Snead Drive, Fort Collins, CO 80525 Phone (970) 226-3104 Fax (970) 226-0186