HomeMy WebLinkAboutTIMBERVINE - FDP - FDP140017 - SUBMITTAL DOCUMENTS - ROUND 1 - REVISIONSComment Number: 7
Comment Originated: 06/13/2014
06/13/2014: Striping notes on RF-14 need to be updated to include City of Fort Collins Traffic Engineer
instead of City of Fort Collins engineer. This affects notes F, K and N.
Notes updated.
Comment Number: 8 Comment Originated: 06/13/2014
06/13/2014: Mexico Way needs to be striped with yellow centerline, and white bike lane striping.
Please also include a bike stencil northbound just north of International, and southbound south of
Saison.
Striping shown.
Comment Number: 9 Comment Originated: 06/13/2014
06/1312014: Please remove the stop sign on Saison at Mexico. Just the northbound stem (Mexico)
should be stopped.
Sign removed.
Comment Number: 10 Comment Originated: 06/13/2014
06/13/2014: Note that street name signs need to include two panels crossed at 90 degrees with both
street names. This is typical at all intersections.
Noted. Additional street nameplates added and typical details will be added.
Comment Number: 11 Comment Originated: 06/13/2014
06/13/2014: Please add street name signs at the three comers of the development: Lager/Stout,
Lager/Saison, and Saison/Lager.
Street signs added.
Comment Number: 12 Comment Originated: 06/13/2014
06/13/2014: Work with staff to create a flared westbound entry from International to Mexico in lieu of a
right turn lane.
Updated to match flare agreed to on June, 172014.
Page 12 of 13
3.18, or similar.
Updated.
Comment Number: 6 Comment Originated: 05/13/2014
O6/09/2014: There are still issues. See redlines.
05/13/2014: There are line over text issues on several sheets. See redlines.
Updated.
Comment Number: 7 Comment Originated: 05/14/2014
O6/09/2014: There are still issues. See redlines.
05/14/2014: There are text over text issues on several sheets. See redlines.
Updated.
Comment Number: 8 Comment Originated: 05/14/2014
06/09/2014: There are still issues on sheet SD02. See redlines.
05/14/2014: There is text on sheets SS04 & SS05 that needs to be rotated 180 degrees. See redlines.
Updated.
Comment Number: 15 Comment Originated: 06/09/2014
06/09/2014: Please correct the spacing/extra character issue masked up on sheets CV01 & CV02.
See redlines.
This was a printer issue.
Comment Number: 16 Comment Originated: 06/09/2014
06/09/2014: Change "Map" to "Plan" on sheet DR01.
Updated.
Topic: Landscape Plans
Comment Number: 17 Comment Originated: 06/09/2014
06/09/2014: There is text that needs to be masked on sheets LP101, LP401 & LP402. See redlines.
Updated
Topic: Plat
Comment Number: 14 Comment Originated: 05/14/2014
06/09/2014: Please make changes as marked. See redlines. If changes are not made or you
disagree with comments, please provide written response of why corrections were not made.
05/14/2014: There are many issues. Please make changes as shown on redlines.
Comments addressed, please see redlines for written responses to comments.
Comment Number: 18 Comment Originated: 06/09/2014
O6/09/2014: Please provide current acceptable monument records.
Department: Traffic Operation
Contact: Martina Wilkinson, 970-221-6887, mwilkinson@fcgov.com
Topic: Construction Drawings
Comment Number: 2 Comment Originated: 05/16/2014
06/13/2014: sight distance evaluated and variance request received
05/16/2014: Sight Distance at Mexico and International will need to accommodated.
Noted. Thank You.
Page 11 of 13
Comment Number: 3
Comment Originated: 05/12/2014
05/12/2014: ADDRESSING
Please provide information showing how the alley loaded lots (not fronting a named street) are
intended to be addressed.
Department: Stormwater Engineering
Contact: Jesse Schlam, 970-218-2932, Ischlam@fcgov.com
Topic: Erosion Control
Comment Number: 1
Comment Originated: 05/14/2014
05/14/2014: The site disturbs more than 10,000 sq-ft and in a sensitive area, therefore Erosion and
Sediment Control Materials need to be submitted for FDP. The erosion control requirements are in the
Stormwater Design Criteria under the Amendments of Volume 3 Chapter 7 Section 1.3.3. Current
Erosion Control Materials Submitted dose not meet requirements. Please submit; Erosion Control Plan,
Erosion Control Report, and an Escrow / Security Calculation. If you need clarification concerning this
section, or if there are any questions please contact Jesse Schlam 970-218-2932 or email
jschlam@fcgov.com
Erosion control report submitted.
Contact: Wes Lamarque, 970-416-2418, wlamargue@fcgov.com
Topic: General
Comment Number: 3 Comment Originated: 05/15/2014
05/15/2014: At final, Pond B needs more natural features including undulating contours to meet our
Landscape Standards.
Pond updated.
Comment Number: 4 Comment Originated: 05/15/2014
05/15/2014: At final, lot grading needs to include building footprints and detailed contours with spot
elevations.
FHA grading provided.
Comment Number: 5 Comment Originated: 05/15/2014
05/15/2014: At final, detailed design and construction details for the LID treatments need to be
included.
Details added.
Comment Number: 6 Comment Originated: 06/11/2014
06/11/2014: At final, a detailed design of the proposed bio-swale is needed. This includes slope,
cross-section, and media specifications.
Information provided.
Comment Number: 7
06/11/2014: Stormwater is ready for a public hearing.
Noted. Thank you.
Department: Technical Services
Contact: Jeff County, 970-221-6588, ]county@fcgov.com
Topic: Construction Drawings
Comment Originated: 06/11/2014
Comment Number: 5 Comment Originated: 05/13/2014
06/09/2014: Please change "NGVD29" to "NVGD29 Unadjusted" on sheets CV01 & CV02.
05/13/2014: If the NGVD 1929 Unadjusted elevations were used, please remove the NAVD 1988
elevations, and provide an equation to get from NGVD 1929 to NAVD 1988. NAVD88 = NGVD29 +
Page 10 of 13
• Show existing utility crossings in profile at approximately STA 10+50, and STA 11+50.
Added to profile view.
Sheet SS02
• Callout at profile STA 20+30.57 seems labeled incorrectly.
Labeled correctly.
• Provide profile callout for segment upstream of SSMH-9
Added pipe label.
Sheet SS03
• Callout arrow at profile STA 32+47.98
Updated.
• Readability at STA 40+00 in plan.
Updated.
Sheet SS04
• Crossing at STA 18+91.87 in profile.
Crossing updated.
Sheet SS05
• Provide profile callout for segment downstream of SSMH5-4.
Added Pipe label.
• Missing station in plan.
Comment Number: 5
05/13/2014: BSD - Signature Block insert:
BOXELDER SANITATION DISTRICT
UTILITY PLAN REVIEW
Comment Originated: 05/13/2014
Reviewed By:
General Manager Date
Review does not constitute "approval" of plans. Plan Engineer is responsible for accuracy and
completeness of plans.
Updated signature block.
Department: PFA
Contact: Jim Lynxwiler, 970-416-2869, jynxwiler@poudre-fire.org
Topic: General
Comment Number: 1
06/11/2014: WATER SUPPLY
the hydrant plan has been revised and is acceptable.
Noted. Thank you.
05/12/2014: WATER SUPPLY
Comment Originated: 05/12/2014
Overall the hydrant plan for the development is sufficient however, a few adjustments should be made.
As I will be out of town and unable to attend the PDP meeting on 5/14/14, 1 would like to follow up this
comment over the phone or by meeting with the project team in person. Please contact me after
5/20/14 to discuss this further (970-416-2869).
Comment Number: 2
05/12/2014: FIRE LANES
Comment Originated: 05/12/2014
Private drives shall have be dedictated as Emergency Access Easements (See Tracts G, I,& K) and
as stated in prior review rounds, all standard fire lane standards shall apply.
In order to meet minimum fire access requirements, no parking is to be allowed in the private drives
(alleys).
Page 9 of 13
2.
Landscaping in the area of the easement where a sanitary sewer is installed shall not create impediments to
ingress and egress, nor shall landscaping material be installed or any trees or shrubs whose height is
greater than 2-feet be planted in the easement area that may impinge on the overall operation and
maintenance of the infrastructure placed in the easement. Driplines of all trees shall not extend over the
installed sanitary sewer line(s).
3.
No fence, which may impede access to and across the easement, shall be installed without prior approval
from Boxelder Sanitation District. Any such fence, installed with the Boxelder Sanitation District's
approval, must have gates to allow access to and across the easement of Boxelder Sanitation District's
maintenance vehicles, and must be paid for by the developer or property owner. 4.
Boxelder Sanitation District, which owns infrastructure installed in the utility easement, has the right from time to
time to enlarge, improve, reconstruct, relocate and replace any underground utility lines, improvements or other
appurtenances constructed hereunder with any other number or type of underground utilities and pipelines, or
other structures either in the original location or at any alternate location or locations within said utility easement.
5.
Boxelder Sanitation District shall have the right to mark the location of its infrastructure by suitable markers
set in or on the ground; provided that permanent markers shall be placed in locations which will not
interfere with any reasonable use of said utility easement.
6.
Boxelder Sanitation District shall have the right to install and maintain a gravel access road within the utility
easement for use by District personnel, equipment and vehicles.
Comment Number: 4
05/13/2014: BSD General Comments:
Comment Originated: 05/13/2014
General Review Notes
1. Boxelder is spelled without a space.
Updated
2. Provide 0.2 FT drop across all manholes.
Drop Provided.
3. Shift sewer segments to be more in the center of the road and manholes away from gutters as much
as practical.
Adjusted as much possible without adding manholes per our conversation. If there are still concerns 1 will
schedule a meeting to resolve remaining issues.
4. Add the Plan and Profile notes included.
Notes Added
5. Add the Plat notes and signature block included.
Utility Plan Review Notes
Sheet U4
• Add "INT2020" at EXMH-1.
Added note
• Call out 15-inch PVC for existing sanitary sewer to/from EXMH-1.
Added note.
Sheet SS01
• Add "INT2020" at EXMH-1.
Added to structure callout.
• Call out 15-inch PVC for existing sanitary sewer to/from EXMH-1.
Added note to plan view.
• Confirm that EXMH-1 can accept a new core for the proposed 10-inch sewer. Angle may be too acute
between the proposed 10-inch sewer and the existing 15-inch sewer from the west to allow for a core.
Indicate flowline to be created from the 10-inch proposed sewer.
Previous plans showed a stub to be built at this location and we discussed field verifying.
Page 8 of 13
Contact: Eric Garner, ,
Topic: General
Comment Number: 2 Comment Originated: 05/13/2014
05/13/2014: Boxelder Sanitation - Sanitary Sewer Notes for all plan and profile sheets:
Notes 1.
All sanitary sewer line construction shall conform to the latest Boxelder Sanitation District "Standards and
Specifications for Sanitary Sewer Pipeline Construction and Improvements"
2.
All sewer services shall be minimum 4-inch diameter constructed at a slope of 2% from the building to the
sewer main, unless otherwise specified and approved by the District.
3.
All 6-inch diameter sewer services shall be constructed at a slope of 1 % from the building to the sewer main.
4.
When groundwater is encountered clay cut off walls shall be installed on the upstream side of all
manholes, in the mid -section of each main line run at intervals not to exceed 300-feet, or as required by
the District. See detail sheets for clay cut-off wall detail.
5.
Field verify invert elevation of sanitary sewer and basement finished floor elevation for gravity flow prior to
constructing foundations.
6.
The Contractor shall schedule a pre -construction meeting with Boxelder Sanitation District a minimum of one
week before construction to coordinate schedules and clarify any additional District requirements. Contact
number is 970-498-0604.
7.
Contractor shall notify the District's inspector forty-eight hours prior to start of construction. 8.
Contractor shall be responsible for coordinating field locates of all existing utilities prior to any construction.
9.
Service connections to structures require an elder valve (sewer shut-off valve) and a cleanout. Elder
valves must be installed upstream of the cleanout and a minimum 3-feet from any wall, overhang or other
structure that might limit access to the valve. Elder valves may be purchased from vendors in Fort Collins,
Colorado.
10.
All construction shall be inspected by District inspector prior to backfill. 11.
For off -site sewer line manholes: Manhole rims shall be set flush with the surface when within an
all-weather access roadway, rims shall be set 6-inches above grade if they are not within an all-weather access
roadway.
Notes added to plan and profile sheets.
Comment Number: 3 Comment Originated: 05/13/2014
05/13/2014: Boxelder Sanitation - Easement use language:
Boxelder Sanitation District Easement Use Language
(for Platted Easements Where Sanitary Sewer Will be Installed - to be Included on all Plats) 1.
There shall be no erection or construction of any building or other structure, or any permanent obstruction,
or decrease or substantial increase in ground level, from the finished elevations on this set of plans, in a
manner that will interfere with use of the utility easement or impede access over and across the easement
for purposes of operation, maintenance or future installation, repair or replacement of an existing or future
sanitary sewer.
Page 7 of 13
National Electrical Code (NEC) as amended by the State of Colorado
Accessibility: State Law CRS 9-5 & ICC/ANSI A117.1-2009. Snow
Load Live Load: 30 PSF / Ground Snow Load 30 PSF. Frost Depth:
Winches.
Wind Load: 100- MPH 3 Second Gust Exposure B. Seismic
Design: Category B.
Climate Zone: Zone 5 Energy
Code Use
1. Single Family; Duplex; Townhomes: 2009 IRC Chapter 11 or 2009 IECC Chap 4.
2. Multi -family and Condominiums 3 stories max: 2009 IECC Chapter 4.
3. Commercial and Multi -family 4 stories and taller: 2009 IECC Chapter 5.
Fort Collins Green Code Amendments effective starting 1-1-2012. A copy of these requirements can be
obtained at the Building Office or contact the above phone number.
Project specific concerns:
1. A new code amendment effective in Aug 1-2014 will require a sprinkler system in all property -line
townhomes and duplexes.
2. New Green Code requires:
a. Upgraded insulation is required for buildings using electric heat or cooling.
b. Low -flow Watersense plumbing fixtures (toilet, faucets, shower heads) are required.
c. Special combustion safety requirements for natural draft gas appliances.
d. Low VOC interior finishes.
3. Any project with more than 6 townhomes must provide accessible units per CRS 9-5.
City of Fort Collins
Building Services Plan
Review
416-2341
Department: Light And Power
Contact: Justin Fields, 970-224-6150, *fields@fcgov.com
Topic: General
Comment Number: 3 Comment Originated: 05/12/2014
05/12/2014: The location of the water and electric services will need to be coordinated with Light and
Power Engineering, 970-221-7600.
Noted.
Comment Number: 4 Comment Originated: 05/12/2014
05/12/2014: Meter locations for the single family attached units will need to be coordinated with Light
and Power Engineering.
Noted.
Department: Outside Agencies
Contact: Alden Hill, ,
Topic: General
Comment Number: 1 Comment Originated: 05/13/2014
05/13/2014: Lake Canal. Replace representative Roy Roth with Alden V. Hill (Secretary of the Board of
Directors).
Updated
Page 6 of 13
Block 5, lot 12: Driveway access cannot be moved due to proximity of intersection, no tree added
Block 5, lot 2T Driveway access cannot be moved due to proximity of intersection, no tree added
Comment Number: 14 Comment Originated: 06/11/2014
06/11/2014:
Please edit landscape note number 20 adding information to this note that says in effect that an
ornamental tree is used by lots to provide a street tree near street lights.
Note has been edited to explain.
Comment Number: 15
O6/11/14:
Comment Originated: 06/11/2014
On sheet LP103 there is a separate plant list for Mexico Way Larimer County that lists 7 honeylocust
and 14 American lindens. If they are not shown as to location should these trees be shown on the
landscape plan? If this area will be annexed in the future Forestry benefits from having street trees
shown on the plan that we would become responsible for.
Trees are shown on the plans on sheet LP104 with the matchline.
Comment Number: 16 Comment Originated: 06/11/2014
06/11/2014:
Review LUC 3.2.1 G and include all 7 of the tree protection specifications including the table
associated with note number 7.
All notes & charts have been added with the exception of note #2. Any hazards from protected trees along Lake
Canal will be managed by the Timbervine HOA as noted.
Comment Number: 17
06/11/2014:
Comment Originated: 06/11/2014
Plant note number 5 should also include City of Fort Collins for approval of plant substitutions.
City of Fort Collins added to the note.
Department: Internal Services
Contact: Russell Hovland, 970-416-2341, rhovland@fcgov.com
Topic: Building Insp Plan Review
Comment Number: 1
04/30/2014:
Comment Originated: 04/30/2014
Building Permit Pre -Submittal Meeting
Pre -Submittal meetings are offered to assist the designer/builder by assuring, early on in the design, that the
new commercial or multi -family projects are on track to complying with all of the adopted City codes and
Standards listed below. The proposed project should be in the early to mid -design stage for this meeting to
be effective and is typically scheduled after the Current Planning conceptual review meeting. Applicants of
new commercial or multi -family projects are advised to call 416-2341 to schedule a pre -submittal meeting.
Applicants should be prepared to present site plans, floor plans, and elevations and be able to discuss
code issues of occupancy, square footage and type of construction being proposed.
Construction shall comply with the following adopted codes as amended: 2012
International Building Code (IBC)
2012 International Residential Code (IRC)
2012 International Energy Conservation Code (IECC) 2012
International Mechanical Code (IMC)
2012 International Fuel Gas Code (IFGC)
2009 International Plumbing Code (IPC) as amended by the State of Colorado 2011
Page 5 of 13
nesting, should the project gain final approval.
Noted.
Comment Number: 9 Comment Originated: 05/14/2014
06/12/2014: Environmental Planning is ready for a hearing. Thank you.
05/14/2014: When the tree mitigation issue is resolved with the Russian olives and the south detention
ponds are labeled as buffer zones, I will be ready for a hearing.
On site meeting has resolved the tree mitigation issues. Notes have been added to buffer zones.
Department: Forestry
Contact: Tim Buchanan, 970-221-6361, tuchanan@fcgov.com
Topic: Landscape Plans
Comment Number: 2 Comment Originated: 05/14/2014
05/14/2014:
Street Tree Species Selection:
List American linden as American Sentry Linden - Tilia americana 'Sentry'
Change made
List Coffeetree as Expresso Kentucky Coffeetree - Gymnocladus dioica 'Expresso'
Change made
Use around 15 fewer Chinkapin Oak and around 15 fewer Texas Red Oak. Change these
approximately 30 street trees to Shademaster honeylocust. Market availability of these oaks has been
low.
Change made
Change the eight Spring Snow Crabs in the median in Mexico Way to Thunderchild Crabapples.
Change made
Consider for any lot that does not have a street tree in front due to a street light location using
Chanticleer Pear, which can be planted 15 feet from the light.
Pears added where shade tree not possible.
Comment Number: 12 Comment Originated: 06/11/2014
06/11/2014:
For ornamental street trees a tree symbol has been added but it appears that this symbol is not
identified in the plant. Label this symbol as Chanticleer pear in the plant list.
Tree added to legend on enlargement sheets, tree is listed on overall detailed plant list.
Comment Number: 13 Comment Originated: 06/11/2014
O6/11/2014:
Around 9 lots do not have a street tree in front of the lot. Please add a street tree by these lots unless
it is not feasible. If a canopy shade tree would not work then evaluate if a Chanticleer Pear could work.
Block 2, lot 1: Water service line moved to allow for tree.
Block 4, lot 9: Driveway access cannot be moved due to proximity of intersection, no tree added.
Block 2, lot 20: Tree moved to other side of lot 19, gas easement prevents tree.
Block 2, lot 11: Tree cannot be added due to ramp and driveway.
Block 4, lot 8: Driveway access cannot be moved due to proximity of intersection, no tree added
Page 4 of 13
Sidewalk labeled and shown.
Comment Number: 14
Comment Originated: 05/16/2014
06/10/2014: As discussed, please provide a variance request for the sight distance triangles
supporting the request to use AASHTO instead of LCUASS. 05/16/2014: Sight distance is an ongoing
concern on the intersection of Mexico Way and International. The applicant needs to provide some
data showing the sight distance and proposed easements if they are required.
Variance request provided
Comment Number: 15 Comment Originated: 05/16/2014
06/10/2014: See redlines for an alley that appears to still be draining more than the allowable surface
area. 05/16/2014: Additional information needs to be provided regarding the drainage from private
alley/driveways within the development that drain onto public right of way. It is understood that the
inverted crown of these alleys and driveways will be lined with porous pavers but there is no
information to support if all drainage can be captured by these pavers or if an inlet should be
proposed at the interface of the alley and the right of way to catch any excess drainage.
The Drainage of the west alley has been diverted to pass under the sidewalk to the east tree lawn,
and passes through a curb cut prior to the HC ramp. The alleys to the east flow to an area inlet and
have less than the 750 sgft required flowing to the street. The remainder of the alleys to the
southeast flow directly into pond A.
Comment Number: 16
Comment Originated: 06/11/2014
06/11/2014: The proposed grade along Mexico Way differs enough from existing grade that additional temporary
grading easements may be required along the back of Right of Way to allow grades to tie
to existing during construction. Letter of intent to provide a temporary grading/construction easement
will be needed if this is the case.
L01 has been provided.
Comment Number: 17
Comment Originated: 06/11/2014
06/11/2014: The pervious pavers in the private alleys need to end at the Right of Way line of the
adjacent public street. They need to be terminated with a concrete band. Engineering has been
working with stormwater on details and can be addressed at final.
Pavers terminated prior to Utility easement remainder of alleys are concrete.
Contact: Sheri Langenberger, 970-221-6573, slangenberger@fcgov.com
Topic: General
Comment Number: 18
Comment Originated: 06/11/2014
06/11/2014: Please provide a check for the filing fees for the off -site drainage easement that was
provided so this can be recorded. The document is 6 pages therefor a check for $36 made out to
"Larimer County Clerk and Recorder" is needed. It can be dropped off to my attention.
Department: Environmental Planning
Contact: Lindsay Ex, 970-224-6143, lex@fcgov.com
Topic: General
Comment Number: 3 Comment Originated: 05/14/2014
05/14/2014: A weed management plan will need to be developed with the first season of construction,
should the project be approved, to ensure removal of the Canada thistle and leafy spurge on the site.
Management plan has been provided.
Comment Number: 5
Comment Originated: 05/14/2014
05/14/2014: A raptor survey will be required prior to a DCP being issued to ensure no raptors are
Page 3 of 13
be outside of this line. Boundary fence has been removed on this side due to lack of space.
2. Any trees within the ditch or easement which are determined by Lake Canal Company to interfere
with the delivery of irrigation water will be removed by Lake Canal Company as needed.
Noted.
3. Lake Canal Company requests protection from debris being blown into the ditch during
construction, and restriction from homeowner s placing debris in the ditch after development is
completed.
Note has been added to site plans.
Comment Number: 11
Comment Originated: 06/11/2014
06/11/2014: Building elevations for single-family attached (Sheet A1.01) Add more detail including
dimensions, identify building materials etc. ' Required prior to Hearing.
Additional information has been added.
Comment Number: 12 Comment Originated: 06/13/2014
O6/13/2014: Aside from comment 11 above, we are ready for hearing. As stated at review meeting,
please submit PDF plan set with pertinent revisions for hearing staff report packet.
Department: Engineering Development Review
Contact: Andrew Gingerich, 970-221-6603, agingerichOfcgov.com
Topic: Construction Drawings
Comment Number: 3 Comment Originated: 05/14/2014
05/14/2014: On the final plans please call out the utilties that will be built in each phase. See redlines
for longer explanation.
A table has been added listing the utilities to be built.
Topic: General
Comment Number: 10
Comment Originated: 05/14/2014
O6/11/2014: Thank you for changing all local vertical curve lengths to 75'. Mexico Way requires vertical
curves of 90' instead of 75' to meet commercial local standards. 05/14/2014: See redlines for
additional comments on street profiles. These will be available on Friday.
Vertical curves have been updated.
Comment Number: 11
Comment Originated: 05/16/2014
Needed prior to Hearing: 06/10/2014: We will need a letter of intent from the owners of the property
regarding the off -site grading/construction easement that will be needed to construct Mexico Way and
for the additional right of way to be dedicated for Mexico Way. Additionally, if the intent is to annex
Mexico Way into City of Fort Collins so that City takes over maintenance than we will delay the
finalization of the Development Agreement until Mexico Way is annexed. 05/16/2014: The right of way
dedicated for Mexico Way needs to be 72' to accommodate a Commercial Local and not a Connector
Local as proposed. The existing zoning adjacent to Mexico Way as well as the need for bike lanes to
serve the residential project were some of the reasons for making this determination.
A letter of intent provided.
Comment Number: 12 Comment Originated: 05/16/2014 06/10/2014: Please label and show the
sidewalk along Mexico Way even if it will exist within the
proposed right of way that will be dedicated by separate document. 05/16/2014: Mexico Way will
need to have at least one sidewalk provided from the Timbervine Development to International. This
sidewalk should exist on the east side of Mexico Way to tie into the existing attached sidewalk on
International.
Page 2 of 13
City of
/OvI'tCollins
`i`
June 13, 2014
Craig Russell
Russell + Mills Studio
141 S. College
Ave, Ste 104 Fort
Collins, CO 80524
RE: Timbervine, PDP140002, Round Number 2
Community Development and Neighborhood Services
281 North College Avenue PO Box 580
Fort Collins, CO 80522
970.221.6750
970.224.6134 - tax
lcgov. com/developmentreview
Please see the following summary of comments from City staff and outside reviewing agencies for your
submittal of the above referenced project. If you have questions about any comments, you may contact
the individual commenter or direct your questions through the Project Planner, Pete Wray, at 970-221-
6754 or pwray@fcgov.com.
Comment Summary:
Department: Planning Services
Contact: Pete Wray, 970-221-6754,
pwrayCfcgov.com Topic: General
Comment Number: 8 Comment
Originated: 06/10/2014 06/10/2014: Please include the following comments from GIS:
1. Addresses will be assigned by the GIS Department after the plans have met final
approval through Development Review and are recorded with the City.
2. All proposed street names are approved and reserved in the Larimer County
Street Inventory System.
Noted.
Comment Number: 9
Comment
Originated: 06/10/2014 06/10/2014: Site Plan. Add signature block title "Planning Certificate".
Replace director of "Current
Planning" - with "Director of Community Development and Neighborhood Services".
Changes made.
Comment Number: 10 Comment Originated: 06/11/2014
06/11/2014: Lake Canal. Change primary contact representative from Roy Roth to Justin Green.
PDP140002 Timbervine-Type I
2nd Round of Review
1. Lake Canal Company requires an easement fifty feet (50') in width from the center of the canal, and
thirty feet (30) of useable access for maintenance of the ditch.
New easement line of 50' from centerline shown on site and landscape plans. New plantings have been adjusted to
Page 1 of 13