HomeMy WebLinkAboutAIRPARK VILLAGE - ODP - 16-05A - CORRESPONDENCE - REVISIONSResponse: A HEC-RAS model for the interim condition has been added to the Drainage Report. This model indicates that the interim condition flow is contained in the easement. 2. Based on the modeling results submitted by the Engineer, Staff is in agreement with the Engineer's conclusion that stormwater detention for this site is not necessary (water quality detention will still be required as indicated in the report). Please provide the full SWMM model for the interim condition without detention in the Appendix of the drainage report and remove the model showing interim on -site detention. Also, please remove interim on -site detention elements from the SWMM Basin Map unless these elements will be proposed with the development. Response: Acknowledged. This SWMM model is provided in the Drainage Repor 3. Please also provide a HEC-RAS model for the ultimate condition that reflects the revised Airpark CDP basins and runoff. At PDP, also please provide digital copies of the models to allow for a more detailed review. Response: Acknowiedged Number: 47 Created: 3/4/2008 [3/4/08] It is suggested that extended detention not be the only water quality technique used. Alternative new technologies should be considered in order to provide a more sustainable development in proximity to Dry Creek. Any disturbance of the existing wetlands due to the proposed alignment of Dry Creek as shown on this latest submittal will require Army Corps of Engineers' approval through a 404 permit approval as well as the City' Natural Resources Department's approval. Response: Acknowledged Comments from Current Planning: 1. Please add to the General Notes on sheet one that the site is located within the Employment Zone District. 2. Please add the following to the General Notes on sheet one: "Street improvements will be subject to the design standards in effect at the time of application for the Project Development Plan(s)." 3. Please add the following to the General Notes on sheet one: "Fire hydrants will be provided as required by Poudre Fire Authority standards." 4. Please add the following to the General Notes on sheet one: "The O.D.P. is located within the East Mulberry Corridor Plan." Response: This notes have been added to sheet 1 of 5 as requested. Page 3 Topic: Traffic Number: 38 Created: 10/15/2007 [3/4/08] [10/15/071 Each individual PDP will need to evaluate the Pedestrian level of service for that portion of the development and install any pedestrian links that will be necessary for the development to meet adequate levels of service for pedestrians. Response: Acknowledged. Department: Transportation Planning Issue Contact: Denise Weston Topic: Transportation Planning Number: 50 Created: 3/5/2008 [3/5/08] Remove the label indicating a "Potential Future Arterial Connection to Timberline" on the connection south of International Blvd. We do not want to provide a false indication that we are approving this connection as it would result in non-compliance with the MSP. The segment of roadway southeast of the intersection of Airpark Drive and International Blvd. should not be identified as an arterial at the CDP level. Since the roadway does not connect under the current traffic study we would prefer to have it referenced as a collector or a local street. Response. This change nas nov been mane as regjestec Department: Stormwater-Water-Wastewater Issue Contact: Basil Hamdan Topic: F/oodp/ain Number: 5 Created: 9/28/2007 [3/4/08] [9/28/07] The site is in the FEMA and City of Fort Collins 100-year floodplain and floodway for DryCreek. It is also in the FEMA 500-year floodplain for the Poudre River. The City's Dry Creek Diversion Project may reduce the floodplain and floodway for this area. However, all applicable floodplain regulations found in Chapter 10 of City Code will apply based on the mapping that is in effect at the time of development. The Poudre River 500-year floodplain will not change as part of the Dry Creek Diversion Project. Therefore, no critical facilities will be allowed within the Poudre 500-year floodplain. At time of PDP submittal a floodplain report should be submitted. A copy of the floodplain report requirements are available upon request. Please show the current FEMA and City floodplain and floodway lines on the plans. Response: Critical facilities have been taken of the proposed use list. The floodplain and floodways are shown on the drainage plan. Topic: Stormwater Number: 46 Created: 3/4/2008 [3/4/08] 1. In the Detention Analysis — Interim Condition discussion in the drainage report, there is a reference to the 1240 cfs flow rate criteria at the Lincoln Avenue Bridge. As previously discussed with the applicant's Engineer, the 1240 cfs criterion is only applicable for the ultimate condition. In the interim condition, the applicant will be required to show that the flow in the channel does not exceed the capacity of the proposed DC-3 channel. Please modify the report text to clarify this point. Page 2 V% ; ISSUES: Department: Advance Planning Topic: Natural AreasJHabitats Number: 49 [3/4/08] No Comments. Response: Acknowledged. Issue Contact: Pete Wray Created: 3/4/2008 Department: Engineering Issue Contact: Sheri Langenberger Topic: General Number: 40 Created: 3/4/2008 [3/4/08] Please add the following notes to the ODP plans: 1) Any change in the location of access points with PDP submittals needs to comply with the City of Fort Collins Land Use Code and the Larimer County Urban Area Street Standards. 2) Street Improvements will be subject to the design standards in effect at the time of application for the project development plan(s). Response: The requested notes have been added on sheet 1 of 5 Number: 41 Created: 3/4/2008 [3/4/08] Sheet 4 The trail symbol is not dark enough. Suggest using a darker and different symbol, such as dots to represent the trail. Response: The trail symbol has been updated as requested. Number: 42 Created: 3/4/2008 [3/4/08] Sheet 4 Label the proposed channel area. Response: The proposed channel is now labeled. Number: 43 Created: 3/4/2008 [314/08] Sheet 4 Remove potential from the label for the northern crossing over the channel. This connection will be needed. Response: This change has now been made as requested. Number: 44 Created: 3/4/2008 [3/4/08] Sheet 4 Add the same label of "future street crossing of the channel' to the International Blvd crossing. If you are going to label one you need to label both. Response: This change has now been made as requested. Paee t