Loading...
HomeMy WebLinkAboutFORT COLLINS DISCOVERY MUSEUM - FDP - 6-10/A - CORRESPONDENCE -Topic: Plat Number: 177 Created: 7/27/2010 [7/27/10] For clarity purposes, the newly added third page of the plat should switch pages with the second page. Department: Light & Power Issue Contact: Doug Martine Topic: Light & Power Number: 173 Created: 7/22/2010 [7/22/10] Light & Power will need a copy of the recorded plat, a completed Commercial Service (C-1) form, and name and address of who to bill for Light & Power development charges. Department: Transportation Planning Issue Contact: Jennifer Petrik Topic: Plat Number: 176 Created: 7/26/2010 [7/26/10] All Transportation Planning comments have been addressed. Department: Technical Services Issue Contact: Jeff County Topic: Plat Number: 174 Created: 7/23/2010 [7/23/10] The boundary & legal close. Number: 175 Created: 7/23/2010 [7/23/10] We suggest that the boundary sheet (#2) be sheet #3, to insure that the guarantees sheet (#3) is with the cover sheet (#1) & other signatures and not forgotten about. Department: Stormwater-Water-Wastewater Issue Contact: Roger Buffington Topic: WaterMastewater Number: 178 Created: 7/27/2010 [7/27/10] Add to note at point where sewer service connects to existing MH that the openings in the MH must be core drilled. Be sure and return all red -lined plans if/when you re -submit any documentation. If you have any questions regarding these issues or any other issues related to this project, please feel free to call me at (970) 221-6750. Yours Truly, S at City Planner We4ov Page 2 STAFF PROJECT REVIEW �\O Cit- of Port Collins DAVID SCHAFER Date: 7/28/2010 OZ ARCHITECTURE 1805 29TH ST., SUITE 2054 BOULDER, CO 80301 Staff has reviewed your submittal for FORT COLLINS DISCOVERY MUSEUM - FINAL PLANS, and we offer the following comments: ISSUES: Department: Current Planning Issue Contact: Steve Olt Topic: Building Elevations Number: 180 Created: 7/28/2010 [7/28/10] There are several changes to the Building Elevations since the plans went to the Planning & Zoning Board on April 29th, including an additional height of 3 to 3.5 feet to the "tower" element. Considering the Board's significant concerns about the architecture and design of the building, the changes are making it challenging for staff to review the plans and ensure that the Board's concerns are being addressed. Topic: General Number: 181 Created: 7/28/2010 [7/28/10] There are several Current Planning comments on the red -lined plans being forwarded to the applicant. Department: Engineering Issue Contact: Marc Virata Topic: General Number: 122 Created: 5/21 /2010 [7/27/10] The agreement for the off -site construction will be needed prior to sign off on the construction drawings. [5/21/10] Wasn't the previous iteration removing any offsite work on UP railroad property by the construction of a retaining wall along the eastern portion of the property? The current submittal seems to show that a fence is instead being installed with some grading taking place off of the platted property within presumably UP property, which would seem to again require an off -site easement. Number: 170 Created: 5/28/2010 [7/27/10] Carried over for reference. [5/28/10] With the construction plans showing an approval block by North Weld, please ensure that they sign off on mylars prior to routing to the City. Number: 179 Created: 7/27/2010 [7/27/10] Prior to sign off on the construction drawing mylars we'll need to see the temporary construction easement with the UP railroad in place and the agreement from Mason Street North for the construction of the sidewalk. Signature on the construction drawings from Park will signify their approval. Page 1