HomeMy WebLinkAboutKINGDOM HALL - FDP - 18-05C - CORRESPONDENCE - REVISIONSM 51 See revised drainage report. It is intended that the drainage from Pond 1 be routed through the future Pond 2, however I added notes in the report that the drainage for lot I pond and lot 2 pond to be investigated more thoroughly when lot 2 developes. 52 Revised to 15" minimum. 53 See revised detention pond calculations. 74 Acknowledged, revised plans to route pumped stormwater to the northwest into the irrigation ditch. Please let me know if you need additional information or if you have any comments on this submittal. Thank you for your time in reviewing this submittal. Sincerely, Troy Spraker, P.E. Page 3 of 3 Topic: Timberline 25 Added, see revised plans 61 Added, see revised plans 62 Added an inlet to accept drainage from the median low point, see revised plans. 63 Added. Topic: Utility Plans 48 See revised plans 64 Added plat to the plans 65 Acknowledged, will revise. 66 Acknowledged, will add. 68 We will need to take a closer look at this irrigation pipe. 69 Added, see revised plans Topic: PFA 70 See revised, will contact Carie Dann for requirements. 71 Will revise median to have roll-over curb and gutter. 72 By others 73 By others Department: Transportation Planning Topic: Site Plan 44 Will revise Department: Storm -water -Water -Wastewater Topic: Draianee 14 Acknowledged 50 Added, see revised report. Page 2 of 3 May 22, 2006 Sheri Wamhoff City of Fort Collins Engineering 281 N. College Avenue Fort Collins, CO 80524 Ms. Wamhoff, This letter is in response to redline comments for Jehovah's Witness Kingdom Hall, dated April 24, 2006. Department: Enzineerins Topic: General 33 Acknowledged 34 See Revised Plans 35 See Revised Plans 67 By others Topic: Kechter 54 Added, see revised plans 55 Added, see revised plans 56 See revised plans. It is proposed to leave the flowline and center lines the same and then do a 2" overlay on the lower portion of Kechter to resurface the existing asphalt to the east property line. With this proposed overlay the "K" value will be increased. See revised plans. 57 Per a meeting it was decided to lessen the travel widths to I and provide a paved 5' shoulder/Bike lane. See revised plans. 58 Added, see revised plans 59 See comment response for item 56 60 Added, see revised plans Page 1 of 3