HomeMy WebLinkAboutKINGDOM HALL - FDP - 18-05C - SUBMITTAL DOCUMENTS - ROUND 1 - ROUTING SHEETti W of 3/2Z/6& FINAL PLAN ROUTING SHEET
Item: 'e/tv C P 0 M H/t L L fzy� It- le, 6r2- G
This project went to / has been scheduled for Public Hearing on FEDS. I Vs .— cvnnC2 / 0 G CURRnrr runn•n•c
The following table lists final plan submittal requirements for this project.
A final fee of $1,000.00 is required at the time of submittal unless otherwise waived or reduced.
Fee Waiver/Reduction Approval: G • e.. Amount: 500.00 Date: 3 - I
Planner: _7= S . Engineer: S. W .
File: P ect Planner
• ` 4d■*
■■■MM■
■■■■■■■■■■■
MM■■■■
BuildinonspectionMEMO
• "NW■
■MWJM■MM■■■■
= I_p
■■MM■■■
Engineering Pavement ■■■■r
■■■■■■■
• ■■
■
■■■■■■■■Light
■ ■■■■■■■■■■■■■
& Power
Natural Resources
Park Planning
Poudre Fire Authority
Street Oversizing
Technical Services
Traffic Operations
Transportation Planning
Water & Wastewater
Water District:
Water Conservation ■■■
■■■■■■■■■■■
County Assessor
Schools: Poudre
Thompson
■■■■■■■■■■■■■■
TOTAL To be Submitted