Loading...
HomeMy WebLinkAboutKINGDOM HALL - ODP - 18-05A - SUBMITTAL DOCUMENTS - ROUND 2 - ROUTING SHEETProject: Date: Planner: Traffic Operations: Engineer: Items Requested Redlinedems Being Returned m �^ J — Y Y 9 � 0 Other Items Required ODP a, Ln a n ° � c J � � 0 Other Items being Returned 9 Enciineering X Engineering Pvmt. Light & Power PFA Stormwater X Technical Services X Traffic Operations Tra nsfo rt Transportation PlanningX Water/Wastewater/FCLWD TOTALS (This Side) Add to reverse side l/ Other: Note: All redlined items should be returned with the resubmittal/revisions. Please call 221-6750 to schedule a resubmittal ^JMf1A /M�'f11�If� REVISION ROUTING SHEET— Po�2 Co rnnn dUe (� � ITEM: 9 1 rJ C, D d O. D . ? -lot. t� DATE RECErVED: �� Z F a Z > w a � a t � F w �W as Z W az zw za w W 2z z o a� aix c F "•z• " C a ly 0 FILE: PROJECT PLANNER X ADVANCE PLANNING X BUILDING INSPECTION CDOT CO M CAST DITCH COMPANY FORESTRY NATURAL RESOURCES PARK PLANNING POLICE - JOE GERDOM POST OFFICE W EST R.O.W. PLANNING RAILROAD: UP or BNSF REA/DOE/PRPA SCHOOLS: POUDRE / THOMPSON STREETS WATER CONSERVATION XCELENERGY ZONING R C i rt 2,covs TOTAL THIS SIDE 3 TOTAL OTHER SIDE y TOTAL BOTH SIDES I D