Loading...
HomeMy WebLinkAboutKINGDOM HALL - ODP - 18-05A - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE REPORTI f� I 1 City of Fort Collins - Rainfall Intensity -Duration -Frequency Table for using the Rational Method (5 minutes - 30 minutes) Figure 3-1a Duration (minutes) 2-year Intensity in/hr 10-year Intensity in/hr 100-year Intensity in/hr 5.00 2.85 4.87 9.95 6.00 2.67 4.56 9.31 7.00 2.52 4.31 _8.80 8.00 2.40 4.10 8.38 9.00 2.30 3.93 .8.03 10.00 2.21 3.78 7.72 11.00 2.13 3.63 7.42 12.00 2.05 3.50 7.16 13.00 1.98 3.39 6.92 14.00 1.92 3.29 6.71 15.00 1.87 3.19 6.52 16.00 1.81 3.08 6.30 17.00 1.75 2.99 6.10 18.00 1.70 2.90 5.92 19.00 1.65 2.82 5.75 20.00 1.61 2.74 5.60 21.00 1.56 2.67 5.46 22.00 1.53 2.61 5.32 23.00 1.49 2.55 5.20 24.00 1.46 2.49 5.09 25.00 1.43 2.44 4.98 26.00 1.40 2.39 4.87 27.00 1.37 2.34 4.78 28.00 1.34 2.29 4.69 29.00 1.32 2.25 4.60 30.00 1.30 2.21 4.52 No Text APPENDIX D FIGURES AND TABLES 9 Emergency Overflow Spillway Sizing LOCATION: Kingdom Hall of Jehovahs Witness PROJECT NO: 242-01 ' COMPUTATIONS BY: ppk DATE: 4/3/05 ' Equation for flow over weir _ top of berm 54 Q = CLH'" it spill elevation ' where C = weir coefficient = 3.1 L � �— H =overflow height 0 100 YP W$�L L = length of the weir ' The pond has a spill elevation 0.0 ft above the maximum water surface elevation in the pond Spillways will be designed with 0.5 ft flow depth, thus H = 0.5 ft Size the spillway assuming that the pond outlet is completely clogged. Qioo = 13.90 cfs Spill elev = 4951.00 ft 100 yr WSEL = 4950.35 ft Min top of berm elev.= 4951.50 Weir length required: L = 12.7 ft ' Use L = 24 ft (width of entry drive) v = 0.99 ft/s 11 I [1 Detention Pond Outlet Sizing (100 yr event) LOCATION: Kingdom Hall of Jehovahs Witness PROJECT NO: 242-01 COMPUTATIONS BY: ppk SUBMITTED BY: North Star Design, Inc DATE: 4/3/05 Submerged Orifice Outlet: release rate is described by the orifice equation, ' Q. = C.Ao sgrt( 2g(h-E.)) where Qo = orifice outflow (cfs) Co = orifice discharge coefficient g = gravitational acceleration = 32.2 ft/s ' Ao = effective area of the orifice (fe) Eo = greater of geometric center elevation of the orifice or des HGL (ft) h = water surface elevation (ft) Q,,,,x = 0.76 cfs outlet pipe dia = D = 12.0 in Invert elev. = 4947.65 ft Ea = 4947.82 ft ' h = . 4950.35 ft - 100 yr WSEL Co = 0.68 solve for effective area of orifice using the orifice equation Ao = 0.088 fe = 12.6 in ' orifice dia. = d = 4.01 in Check orifice discharge coefficient using Figure 5-21 (Hydraulic Engineering) d/D= 0.33 kinematic viscosity, v = 1.22E-05 ftZ/s Reynolds no. = Red = 4Q/(pdv) = 2.38E+05 Co = (K in figure) = 0.68 check ' Use d = 4.00 in A o = 0.087 ft ' = 12.57 in 2 Q o = 0.76 cfs DetPond-prelim.xls LOCATION: PROJECT NO: COMPUTATIONS BY: DATE: WQCY 100 year WSE'L STAGE - STORAGE TABLE (10 & 100-YEAR) Kingdom Hall of Jehovahs Witness 242-01 ppk 4/3/05 100 yr Detention Volume Required = 0.272 Water Quality Volume Required = 0.039 Total 100 yr Volume Required = 0.310 Stage (ft) Surface Area (ft) Incremental Storage (ac-ft) Total Storage (ac-ft) 4947.65 0 4948.0 1221 0.003 0.003 4948.60 4310 0.036 0.039 4949.0 6369 0.079 0.079 4950.0 7830 0.163 0.242 4950.35 10205 0.072 0.314 4951.0 14615 0.254 0.496 WATER QUALITY POND SIZE LOCATION: Kingdom Hall of Jehovahs Witness PROJECT NO: 242-01 COMPUTATIONS BY: ppk SUBMITTED BY: North Star Design, Inc DATE: 4/3/05 From Urban Storm Drainage Criterial Manual Use 40-hour brim -full volume drain time for extended detention basin Required Storage = a * ( 0.91 * 13 - 1.19 * 12 + 0.78 * 1 ) Water Quality Capture Volume = WQCV = (required storage/12)*(tributary drainage area) Trib. % Imperv. Req. Storage WQCV DWo req. vol req. area/row area from Fig. EDB-2 I WQCV *1.2 from Fig. EDB-3 (ac) (in. of runoff) (ac-ft) (ft) (ac-ft) (in 2/row) POND 1.52 65 0.254 0.032 1.00 0.039 0.242 WQ outlet sizing for pond 1 From Figure 5, for 9/16 in. hole diameter Area of hole = 0.249 in # of columns = 1 Area provided/row = 0.249 in Area Required/row = 0.242 in . Use 1 columns of 9/16" diam holes MINIMUM DETENTION VOLUME REQUIRED FAA METHOD (100-YEAR) LOCATION: Kingdom Hall of Jehovahs Witness PROJECT NO: 242-01 COMPUTATIONS BY: ppk DATE: 4/3/05 Equations: A trib. To pond = 1.52 QD = CA Cioa = 0.87 Vi = T*CiA = T*QD Developed C*A = 1.3 V. =K*Qro*T QPo = 0.76 S=Vi -V. K= 1 Rainfall intensity from City of Fort Collins IDF Curve acre acre cfs (0.5 cfs/acre) (from fig 2.1) Storm Duration, T (min) Rainfall Intensity, i (in/hr) QD (cfs) Vol. In Vi (ft) Vol. Out Va (ft3) Storage S (ft3) Storage S (ac-ft) 5 9.95 13.2 3947 228 3719 0.09 10 7.72 10.2 6125 456 5669 0.13 20 5.60 7.4 8887 912 7975 0.18 30 4.52 6.0 10759 1368 9391 0.22 40 3.74 4.9 11870 1824 10046 0.23 50 3.23 4.3 12814 2280 10534 0.24 60 2.86 3.8 13615 2736 10879 0.25 70 2.62 3.5 14552 3192 11360 0.26 80 2.38 3.1 15107 3648 11459 0.26 90 2.22 2.9 15853 4104 11749 0.27 100 2.05 2.7 16266 4560 11706 0.27 140 1.93 2.6 16845 5016 11829 0.27 120 1.80 2.4 17138 5472 11666 0.27 130 1.60 2.1 16504 5928 10576 0.24 140 1.40 1.9 15551 6384 9167 0.21 150 1.20 1.6 14282 6840 7442 0.17 160 1.15 1.5 14599 7296 7303 0.17 170 1.10 1.5 14837 7752 7085 0.16 180 1.05 1.4 14996 8208 6788 0.16 Required Storage Volume: 11829 ft3 0.272 acre-ft I 1 I I I I 1 I I I i E1 1 i 111 1 APPENDIX C DETENTION CALCULATIONS 14 I M M M= r= M M = = = M r= M= i i r North Star Design, Inc. 700 Automation Drive, Unit I Windsor, CO 80550 RATIONAL METHOD PEAK RUNOFF (100-YEAR) LOCATION: Kingdom Hall of Jehovahs Witness PROJECT NO: 242-01 COMPUTATIONS BY: ppk DATE: 4/3/05 DIRECT RUNOFF CARRYOVER TOTAL Inlet Capacity REMARKS Design Point SUBBASIN DESIGNATION A (ac) C1w TOgw (min) i (in/hr) Q1w (cfs) from Design Point Q1w (cfs) Qiw Total (cfs) (cfs) 1 1 1.52 0.87 7.0 8.80 11.6 11.6 to detention pond 2 2 1.07 0.25 9.6 7.85 2.1 1 2.1 Undeveloped Q=CiA Q = peak discharge (cfs) C = runoff coefficient i = rainfall intensity (in/hr) from IDF curve A = drainage area (acres) Flow.xls Q100 r= r r r r rr r r rs r r, r r r r North Star Design, Inc. 700 Automation Drive, Unit I Windsor, CO 80550 RATIONAL METHOD PEAK RUNOFF (10-YEAR) LOCATION: Kingdom Hall of Jehovahs Witness PROJECT NO: 242-01 COMPUTATIONS BY: ppk DATE: 4/3/05 DIRECT RUNOFF CARRY OVER TOTAL Inlet Capacity REMARKS Design Point SUBBASIN DESIGNATION A (ac) CIO TOC" (min) i (in/hr) Q10 (cfs) from Design Point Qio (cfs) Qio Total (cfs) (cfs) 1 1 1-.52 0.69 9.1 3.91 4.1 4.1 2 2 1.07 0.20 10.0 3.78 0.8 0.8 Q=CiA Q = peak discharge (cfs) C = runoff coefficient i = rainfall intensity (in/hr) from IDF curve A = drainage area (acres) Flow.xls Q10 s M M M r r it r M r" r i M s MIft m r TIME OF CONCENTRATION 100-YEAR LOCATION: Kingdom Hall of Jehovahs Witness PROJECT NO: 242-01 COMPUTATIONS BY: SB DATE: 4/3/05 SUB -BASIN DATA INITIAL / OVERLAND TIME W TRAVEL TIME / CHANNEL FLOW 00 t, CHECK (URBANIZED BASIN) FINAL t, REMARKS DESIGN POINT SUBBASIN DESIGNATION (1) Area (ac) (2) C*Cr (Cr= 1.25) (3) Length (ft) (4) Slope (%) (5) t; (min) (6) Length (ft) (7) Slope (%) (8) V (ft/s) (9) 4 (min) (10) t, (min) (11) Total L (ft) (12) t (L / 180)+10 (min) (13) (min) (14) 1 1 1.52 0.87 45 1.2 2.74 300 0.6 1.2 4.30 7.0 345 11.9 7.0 2 2 1.07 0.25 20 I.0 7.11 290 1.7 2.0 2.47 9.6 310 11.7 9.6 EQUATIONS: tc=ti+t t;=[1.87(1.1-C*Cr)05]/S113 t,=L/V where V=C,,*Sw5 final t, = minimum of t; + 4 and urbanized basin check (C,, from Table RO-2) M r m r M m r r M " M " M m m m in r TIME OF CONCENTRATION 10-YEAR LOCATION: Kingdom Hall of Jehovahs Witness PROJECT NO: 242-01 COMPUTATIONS BY: ppk DATE: 4/3/05 SUB -BASIN DATA INITIAL / OVERLAND TIME (t,) TRAVEL TIME / CHANNEL FLOW (t,) t, CHECK (URBANIZED BASIN) FINAL t, REMARKS DESIGN POINT SUBBASIN DESIGNATION (1) Area (ac) (2) C*Cf (Cf= 1.0) (3) Length (ft) (4) Slope (%) (5) t; (min) (6) Length (ft) (7) Slope (%) (8) V (ft/s) (9) t, (min) (10) t, (min) (11) Total L (ft) (12) t,= (L / 180)+10 (min) (13) (min) (14) l 1 1.52 0.69 45 1.2 4.79 300 0.6 1.2 4.30 9.1 345 11.9 9.1 2 2 1.07 0.20 20 1.0 7.53 290 1.7 2.0 2.47 10.0 310 11.7 10.0 EQUATIONS: tc=t;+t, t;=[1.87(L1-C*Cf)L0.5]/S113 t,=L/V whereV=C,*Sw5 final t, = minimum of t; + t, and urbanized basin check (C from Table RO-2) r, M NoMW DesPW. M M � M r M a IMIM WSW M M I r 700 Automation Drive, Unit I Windsor, CO 80550 RUNOFF COEFFICIENTS & % IMPERVIOUS LOCATION: Kingdom Hall of Jehovahs Witness PROJECT NO: 242-01 COMPUTATIONS BY: ppk DATE: 4/3/05 Recommended % Impervious from Urban Storm Drainage Criteria Manual Streets, parking lots (asphalt): Sidewalks (concrete): Roofs: Lawns (Average <2%, heavy soil): Runoff %. coefficient Impervious C 0.95 100% 0.95 96% 0.95 90% 0.20 0% SUBBASIN DESIGNATION TOTAL AREA (ac.) TOTAL ,AREA (sq.ft) ROOF AREA (sq.ft) PAVED AREA (sq.ft) SIDEWALK AREA (sq.ft) LANDSCAPE AREA (sq.ft) % Impervious RUNOFF COEFF. (C) 1 1.52 66,014 6,270 35,910 1,340 22,494 65% 0.69 2 1.07 46,420 0 0 0 46,420 0% 0.20 Flow.xls Cval I ' APPENDIX B HYDROLOGIC COMPUTATIONS i l 1 1 I 1 1 1 1 1 1 i I No Text I I I I C G i I 1 APPENDIX A VICINITY MAP A Conveyance systems have been sized and will convey the required flows to the pond as required. The storm system on site will be a privately owned and maintained. If, at the time of construction, groundwater is encountered, a Colorado Department of Health Construction Dewatering Permit would be required. 7. REFERENCES 1. City of Fort Collins, "Storm Drainage Criteria Manual", (SDCM), dated March, 1986. 2. Urban Drainage and Flood Control District, "Urban Storm Drainage Criteria Manual", Volumes 1 and 2, dated March, 1969, and Volume 3 dated September, 1992. 3. McClellands Creek Master Drainage Plan Update by ICON Engineering, Inc. dated November 30, 2000. 5 I 4.3 Drainage Summary . The City of Fort Collins will be responsible for maintenance of the existing storm drainage facilities located within the right-of-way. The drainage facilities located outside of the right of way (including the detention pond and detention outlet pipe) will be maintained by the owners of the site. 5. EROSION CONTROL 5.1 General Concept This site lies within the Moderate Rainfall and Wind Erodibility Zone per the City of Fort Collins Zone Maps. The potential exists for silt movement from the site and into the existing storm system during construction. Potential also exists for tracking of mud onto existing streets which could then wash into existing storm systems. Silt fence will be provided around the perimeter of the site, a construction entrance will be provided at the exit from the site and wattles will be provided around the outlet pipe and in all swales. The incorporation of these best management practices will reduce the amount_ of sediment leaving the site during construction. The detailed design and required calculations for the erosion control will be completed with the final design for this project. 't 6. CONCLUSIONS 6.1 Compliance with Standards All computations that have been completed within this report are in compliance with the City of Fort Collins Erosion Control Reference Manual for Construction Sites and the Storm Drainage Design Criteria Manual. 6.2 Drainage Concept The proposed drainage concepts presented in this report and on the construction plans adequately provide for the collection and conveyance of runoff to the detention area. 1 4 I I 3.4 Hydraulic Criteria All hydraulic calculations will be prepared with the final design for this site. 4. DRAINAGE FACILITY DESIGN 4.1 General Concept The runoff from this site will be collected in the on site curb and be conveyed to the proposed detention area in the southeast corner of the site. This pond will attenuate the runoff to 0.5 cfs per acre and will discharge the water to the proposed storm pipe system along the east boundary of the site. This pond will also provided extended detention for water quality. No off site flows enter the site from adjacent properties. Flow from offsite is intercepted by Timberline Road on the west, an existing irrigation ditch on the north and Kechter ' Road on the south. Only small portions of the landscape areas on the south, north and east will be released from this site undetained. 4.2 Specific Flow Routing jThe site has been divided into two basins and a summary of the drainage patterns within each basin is provided in the following paragraphs. Basin 1 contains the majority of the proposed development including all of the proposed building, the parking lot, a majority of the drives and the detention basin. The runoff from this basin is conveyed via concrete pans and curb & gutter to a curb opening in the southeast comer of the parking lot. The runoff then enters the detention pond and is detained before being released to the proposed storm pipe -system on the east. Basin 2 contains the north portion of the site which is not proposed to be developed at this time. The runoff from this basin will be allowed to flow to the northeast corner of the site as it currently does. Detention and water quality extended detention will be required for this site when development is proposed. 3 1 I convey the runoff from the proposed development to a detention pond and then north in a storm pipe and proposed swale to the existing concrete channel in Stetson Creek Second Filing. This pan will then convey the water east to the McClellands Basin Drainageway. 3. DRAINAGE DESIGN CRITERIA 3.1 Regulations This report was prepared to meet or exceed the "City of Fort Collins Storm Drainage Design Criteria Manual" specifications. Where applicable, the criteria established in the "Urban Storm Drainage Criteria Manual" (UDFCD), 1984, developed by the Denver Regional Council of Governments, has been used. 3.2 Development Criteria Reference and Constraints The runoff from this site has been routed to the proposed detention pond on site. Detention and water quality facilities will be provided for the proposed development on site and the undeveloped portion of the site will not be detained at this time. The pond will release to the northeast corner of the overall site and be conveyed in a proposed Swale to the existing concrete channel along the south side of the Stetson Creek Second Filing. 3.3 Hydrologic Criteria Runoff computations were prepared for the 5 and 10-year minor and 100-year major ' storm frequency utilizing the rational method. All hydrologic calculations associated with the basins are included in Appendix B of this report. Standard Form 8 (SF-8) provides time of concentration calculations.. for --all sub - basins. Standard Form 9 (SF-9) provides a summary of the design flows for all Sub - basins and Design Points associated with this site. Detention volume was calculated based on a release rate of 0.5 cfs per acre. The FAA method for detention pond sizing was utilized to determine the required volume. Water quality volume was calculated using the method recommended in the "Urban Storm Drainage Criteria Manual'. 2 I 1. GENERAL LOCATION AND DESCRIPTION 1.1 Location This site is located on the northeast corner of the intersection of Timberline Road and Kechter Road in Fort Collins. This project is located in the Southwest Quarter of Section 5, Township 6 North, Range 68 West of the Sixth Principal Meridian, in the City of Fort Collins, Larimer County, Colorado. See the location map in Appendix A. The project is bounded on the north and east by existing estate lot residential properties, on the west by existing Timberline Road and on the south by Kechter Road. 1.2 Description of Property The entire project consists of approximately 2.75 acres of land. A house and several outbuildings exist on the site and the site slopes to the southeast and the northeast at slopes ranging from 1 to 1.5 percent. An irrigation ditch exists on the site which divides the runoff into two directions. With this project, the site will be divided into two lots and only the south lot will be developed at this time. This project will include demolishing the existing structures on site and construction of a church building and a residence with associated parking and drives. Detention will be provided in the southeast comer of the site. The pond will outlet to the northeast comer of the overall site. 2. DRAINAGE BASINS AND SUB -BASINS 2.1 Major Basin Description The proposed development lies within the McClellands-Mail Creek Drainage Basin. It is proposed that the detention area on site release at 0.5 cfs per acre. 2.2 Sub -basin Description The portion of the site that is proposed to be developed at this time currently drains southeast and into the existing roadside ditch along Kechter Road. The runoff then flows east along Kechter to Mail Creek. With the proposed development, it is proposed to t 1� I TABLE OF CONTENTS .. TABLE OF CONTENTS............................................................................................................... iii 1. GENERAL LOCATION AND DESCRIPTION 1.1 Location...................................................................................................................1 1.2 Description of Property............................................................................................1 2. DRAINAGE BASINS AND SUB -BASINS 2.1 Major Basin Description..........................................................................................I 2.2 Sub -Basin Description.............................................................................................1 3. DRAINAGE DESIGN CRITERIA 3.1 Regulations....................................................................................:..........................2 3.2 Development Criteria Reference and Constraints....................................................2 3.3 Hydrologic Criteria..................................................................................................2 3.4 Hydraulic Criteria....................................................................................................3 4. DRAINAGE FACILITY DESIGN 4.1 General Concept .......................................................................................................3 4.2 Specific Flow Routing.............................................................................................3 . 5. 4.3 Drainage Summary ...................................................................................................3 EROSION CONTROL 5.1 General Concept......................................................................................................4 5.2 Specific Details........................................................................................................4 6. CONCLUSIONS 6.1 Compliance with Standards....................................................................................4 6.2 Drainage Concept.....................................................................................................4 7. REFERENCES ................................ W APPENDICES A Vicinity Map . B Hydrologic Computations C Detention Pond Sizing D Figures and Tables I 1 V North Star aft=, design, inc. April 5, 2005 Basil Hamdan City of Fort Collins Stormwater 700 Wood Street Fort Collins, CO 80522-0580 RE: Preliminary Drainage & Erosion Control Study for Kingdom Hall Addition Dear Basil, I am pleased to submit for your review and approval, this Preliminary Drainage and Erosion Control Study for Kingdom Hall Addition church facility. I hereby certify that this report for the drainage design was prepared in accordance with the criteria in the City of Fort Collins Storm Drainage Manual. . I appreciate your time and consideration in reviewing this submittal. Please call if you have any questions. ii 700 Automation Drive, Unit I Windsor, Colorado 80550 970-686-6939 Phone • 970-686-1 188 Fax PRELIMINARY DRAINAGE AND EROSION CONTROL STUDY KINGDOM HALL ADDITION Prepared for: Poudre Valley Congregation KC Johnson 4985 Hogan Drive Fort Collins, CO 80525 Prepared by: North Star Design 700 Automation Drive, Unit I Windsor, Colorado 80550 (970)686-6939 April 5, 2005 Job Number 242-01