HomeMy WebLinkAboutSPRING CREEK RANCH - PDP - 14-05 - CORRESPONDENCE - REVISIONSTypical planting details, are shown for the duplex and 8-plex units. The entire
landscape plan will be completed at final compliance.
Number: 8 Created: 3/23/2005
[3/23105] Please note the building height on the duplex elevations'
A dimension string has been added to the elevations showing heights from
ground to roof.
Comment from Current Planning: Please show a higher level of buffering
for the Heffington property to the east.
Linda Ripley met with Mr. And Mrs. Heffington to discuss buffering options. The
landscape plans have been revised along the east property lines. Deciduous
canopy trees have replaced some ornamental trees and 2-3 Blue Spruce trees
will be planted on the Heffington's property at a location specified by the Mr. And
Mrs. Heffington. Mr. and Mrs. Heffington have also asked that a mesh fence be
added to prevent pets from chasing their horses. They would also like signs
added along the fence line stating, "Do not feed horses — they bite'.
Sincerely: / o
Sandy McF ron
Project Manager
V.F. Ripley. Associates, Inc.
Lee Watkins
Project Manager
JR Engineering
Number: 2 Created: 3/23/2005
[3/23/05] 1 don't see any bicycle parking. Please show bike racks on the
site plan.
Bike parking has been added. Refer to revised site plan.
Number: 3 Created: 3/23/2005
[3/23/05] How will trash service be handled? I don't see any
dumpsters/enclosures called out on the plans. Will trash/recyclables be
set out by the individuals. Please either show dumpsters etc or add a note
to General Notes addressing how services will be handled.
Trash picked up from each individual unit. Buildings, which back up to, an alley
will have their trash picked up from the alley side.
Number: 4 Created: 3/23/2005
[3/23/05] There is a 54 space parking area right off Hull St. There is a
sidewalk that connects to the units on lots 1-8, but the sidewalk does not
connect over to the walkway around tract C - Open space area. Please add
a connecting sidewalk from the parking area to the open space area
sidewalk.
A connecting sidewalk has been added to connect the parking area to the open
space area, refer to revised plans. There are no 54 space parking areas in this
development.
Number: 5 Created: 3/23/2005
[3/23/05] Please be consistent. on your HC ramp symbols where the
sidewalk meets road crossings. EX: Creekview Dr and Trailway Dr
intersection.
HC ramp symbols.have been revised. Refer to revised plans.
Number: 6 Created: 3/23/2005
[3/23/05] The arrows pointing to the building envelopes are actually just
pointing to the middle of the units. Please clearly define and label the
building envelopes.
The arrows have been adjusted. Refer to revised site plan.
Number: 7 Created: 3/23/2005
[3/23/05] Please show a more detailed "Landscape Detail" plan, calling out
the shrubs, perennial types and counts.
Number: 14 Created: 4/5/2005
[4/5105] Extend water mains and sanitary sewers to the property lines in
Creekview Drive.
Water mains and sanitary sewers are now extended to the property lines in
Creekview Drive.
Number: 15 Created: 4/5/2005
[4/5/05] Maintain 10 feet of separation between water/sewer mains and all
storm inlets.
10' of separation is maintained.
Number: 16 Created: 4/5/2005
[4/5/05] Show and label curb stops. Curb stops and meter pits may not be
located in'drives or other hard surfaces. Maintain 4 feet minimum
separation between curb stops/meter pits and all building envelopes.
Acknowledged.
Number: 17 1 Created: 4/5/2005
[4/5/05] Provide a 15 foot tract of land between lots 2 and 3 for sanitary
sewer main. Include a 5 foot utility easement on both side of this tract of
land. Place sanitary sewer mains on the center line of drives and water 10,
feet away. Provide off site utility easement for the proposed sanitary sewer
connection.
Site plan was revised and comment is no longer valid.
Number: 18 Created: 4/5/2005
[4/5/05] See site, landscape and utility plans for other comments.
Acknowledged.
Department: Zoning Issue Contact: Jenny Nuckols
Topic: Zoning
Number: 1 Created: 3/23/2005
[3/23/05] Please note which handicap spaces are to be van accessible.
Also van Access. Spaces need to be signed as such.
Van accessible spaces have been added and signed. Refer to revised site plan.
facility? Will it be gated? Basically, I am asking if this will be for exclusive
use by bicyclists and pedestrians, unless an emergency vehicle is using it.
This is an important consideration since the high PED LOS ranking for this
project requires unrestricted connectivity for bikes/pedestrians to this
destination.
s
Removable bollard will be added at the end of Hull Street. Pedestrian and bicycle
will be provided.
Number:57 - Created:416/2005
[4/6/05] Please show the sidewalk along the portion of Hull (east of
Trailway) on the utility plans. Also, please provide some detail as to how
this will tie into the proposed emergency/bke/ped access that will tie into
the neighborhood to the east. Thanks.
The sidewalk has been added to the utility plans. The sidewalk along the east
property line has been extended to the asphalt paving to allow for connectivity to
the neighborhood.
Department: Water Wastewater Issue Contact: Roger
Buffington
Topic: Utility
Number: 51 Created: 4/6/2005
[4/6/05] Schedule a utility coordination meeting prior to starting these
revisions. There are potentially many conflicts to be resolved.
A utility coordination meeting was held on April 20th and utility conflicts were
resolved.
Department: Water Wastewater Issue Contact: Jeff Hill
Topic: Utility
Number: 12 Created: 4/5/2005
[4/5/05] The existing water main stub from Taft Hill into Hull street is a 12-
inch. This stub must be extend along Hull street until the point of curvature
at which point it can be reduced to an 8-inch main. Extend this main on the
south side of Hull street.
Acknowledged.
Number: 13 Created: 4/5/2005
[4/5105] A profile of the proposed sanitary sewer main will be required prior
to hearing.
Provided, see sheet 9 of the utility plan set.
add ramps at this location to the Overall Utility Plan (sheet 7). See redlined
utility plan for clarification.
Landscape, Site Plan and Utility Plan ramp locations now match.
Number: 23 Created: 4/5/20051, '
[4/5/05] 1 agree with Zoning Staff's comment above (NO.4). Please add a 6'
wide walkway from this parking space (is it 54 or 5-4 spaces?) to the
walkway around the open space. Thanks.
A six-foot walkway has been added to the plans, refer to revised plan set. The
parking space was clearly labeled, 5 spaces, refer to revised plans because this
area has been modified.
Number: 25 Created: 4/5/2005
[4/5105] From my perspective the street plan and profiles for Trailway Dr
and Creekview Dr. look pretty good, but please add the crosswalks
indicated on the site plan to the utility plans.
Landscape, Site Plan and Utility Plan ramp locations now match.
Number: 27 Created: 4/5/2005
[4/5/05] The walkways that you are providing to the Spring Creek Trail
(currently shown at 5') are not wide enough for concurrent use by a
pedestrian and passing cyclist. The LUC stipulates that all shared use
facilities such as this shall be 8' in width, minimum. Understanding that it
may be overkill to require 3 separate 8' wide trail connections with this
project, lets put our minds together (Trans. Planning and/or Parks staff as
well as the Applicant) and come up with at least one connection that meets
the standard. Also, these trail connections should lie in a public access
easement that is reflected on the plat. Thanks.
The walkway connecting to Spring Creek Trail is now 8'. One 8' wide trail
connection is provided. Tract A is a public access easement.
Number: 31 Created: 4/5/2005
[4/5/05] The sidewalk along that portion of Hull (that will become Swallow
at some point in the future) should have a 5' sidewalk from Trailway Dr. to
Taft Hill Road. This is the collector standard. Also, there is no sidewalk
along Hull shown on the overall utility plan (sheet 7) but is shown on the
landscape plan. Please rectify.
Sidewalk is now shown on sheet 7 of the overall utility plan set.
Related question(s): How is the emergency access (as mentioned in the
TIS, page 3) controlled? Will private vehicles be able to access this interim
7. Show all proposed grading for the bike -path and outlet pipe in the
floodway. No fill is allowed in the floodway unless a modeling report is
done that shows no -rise to the 100-year water surface elevation. If all
grading is at or below existing ground elevation than only the "No -Rise
Certification" form needs to be completed both before constructm'h and
after. Please add some existing spot elevations to the grading plan to use
as easy reference during the as -built certification phase.
Proposed grading for the bike -path is shown. The outlet pipe has been moved
and no longer is in the floodway. No fill is proposed for the floodway. A "No -Rise
Certification" form has been included in the drainage report and will be completed
before construction and after.
8: Add to general notes section that a No -Rise Certificate must be
obtained prior to the start of construction in the floodway and an as -built
No -Rise Certificate must be submitted with the site certification.
A note stating that a No -Rise Certificate must be obtained prior to the start of
construction in the floodway and an as -built No -Rise Certificate must be
submitted with the site certification has been added to the General Notes section.
Please refer to note #4 of Storm Drainage and Floodplain Notes on sheet 2 of the
utility plan set.
9. Drainage Report: Add more description of the floodplains/floodways
and how the proposed site improvements will meet the floodplain
regulations. Include the "No -Rise Certificate" in the report if no floodplain
modeling is needed. If changes in the site layout result in structures in the
floodplain, please add a detailed section in the report covering this. (See
attached checklist for the specific information to include.) In the
compliance section, please refer to Chapter 10 also (floodplain
regulations).
More description of the floodplains/floodways has been added to the Drainage
Report. Please refer to Section 1.7. A "No -Rise Certificate" has been added to
Appendix A of the Drainage Report. We have also included a 50% Floodplain
Checklist.
Department: Transportation Planning Issue Contact: David Averill
Topic: General
Number: 22 Created: 4/5/2005
[415/05] On the Preliminary Landscape Plan, the T walkway behind the
units on the east side of Trailway Dr. has ramps at Creekview Dr but the
overall utility plan is lacking ramps at this location. The same comment
holds true for the crossing at the eastern boundary of this project. Please
the 2-year flows of the spring creek floodplain to avoid backwater into the
site detention pond during the 2-year storm.
Detention pond discharge is above the Spring Creek BFE.
Topic: Floodplain e
Number: 74 Created: 4/8/2005
[4/8/05] Susan Hayes - April 8, 2005
1. It appears the floodplain lines aren't quite right. Please verify the
FEMA (100-year floodplain and floodway, 500-year) and City (100-year
floodplain and floodway) boundaries are correct.
Floodplain lines have been adjusted.to show the correct boundaries.
2. Show all floodplain boundaries (both FEMA and City) on both the Site
Plan and Landscaping Plan.
Floodplain boundaries have been added to both the site plan and landscape
plan.
3. On the Landscaping Plan, add a note stating any changes to the plan
inside the Floodway must be approved by the Stormwater Utility Floodplain
Administrator.
Acknowledged.
4. Make sure all legends include the FEMA and City floodplain
information.
Legends now include the FEMA and City Floodplain information.
5. On the grading plan, include the cross-section lines and base flood
elevation (BFE) lines.
The grading plan now includes the cross-section lines and BFE lines
6. Potential Structures in Floodplain: If changes in the site layout result
in any structure in the floodplain, the floodplain regulations must be met.
This includes no basements and elevation of the lowest finished floor to 18
inches above the BFE. A.floodplain use permit is required for all structures
in the floodplain. A completed and approved Elevation Cert. is required
prior to the release of a CO for any structure in the floodplain. Garages are
allowed, however they must be either elevated or vented. (See attached
check list to see what specific information has.to be included on the plans.)
Acknowledged.
Number: 49 Created: 4/5/2005
[4/5/05] Landscaping: The two sets, of Austrian Pines on south side of
Creekview Drive need to be moved south - conflict with pedestrian/vehicle
intersections. Avoid locating plant materials that would screen ground
floor entrances or windows.
This has been adjusted on the landscape plan. Rrefer to revised landscape plan.
Department: Stormwater Utility Issue Contact: Wes Lamarque
Topic: Drainage
Number: 68 Created: 4/8/2005
[4/8/05] The southern basins that drain to Hull Street and then east need to
be detained with water quality and not free release. Conveyance and
drainage easements need to be provided as well from the site to either
Spring Creek or the regional channel to the east.
The grading and stormwater management design has been revised to detain
these basins for water quality and quantity.
Number: 69 Created: 4/8/2005
[4/8/05] The building finish floor elevations in basin 108 are lower than the
adjacent street. There needs to be at least a 2% slope from the front of the
buildings to the back of sidewalk. The 100-year street capacity calculations
may also dictate a higher building finish floor elevation.
Finish floor elevations have been adjusted based on the revised grading.
Number: 70 Created: 4/8/2005
[4/8/05] Storm sewer should preferably be located in tracts and not lots. If
a storm sewer is to be located on a lot, no fences would have to be
required and no trees within 10 feet of centerline.
All storm sewer is located in tracts and not lots.
Number: 71 Created: 4/8/2005
[4/8/05] The detention pond sizing and release rate needs to take into
account the tailwater conditions of the Spring Creek floodplain. Timing of
the two peaks may show that the site pond is full before the peak of the
floodplain.
/ Detention pond discharge is above the Spring Creek BFE.
Number: 75 Created: 4/8/2005
[4/8/05] The water quality volume portion of the detention pond (or the
invert of the detention pond) needs to be higher than the high water line for
2. The second floor units with 200's
3. The third floor units with 300's, and so forth.
B. All brass letters and numerals shall be posted on a black background.
C. Some multi -family layouts may require address postings from the back
side as well as the front of the buildings.
D. A clockwise addressing pattern shall be maintained when ever possible.
Acknowledged. Ron Gonzales has offered suggestions to how the interior units
may be addressed.
Number: 66 Created: 4/7/2005
[4!7/05] WATER SUPPLY: Commercial
No commercial building can be greater then 300 feet from a fire hydrant.
Fire hydrants are required with a maximum spacing of 600 feet along an
approved roadway. Each hydrant must be capable of delivering 1500
gallons of water per minute at a residual pressure of 20 psi. 1997 UFC
901.2.2.2
NOTE: The fire hydrant located at the West end of Creekview Drive needs
to be relocated to the South West corner of Creekview Drive and Trailway
Drive.
Hydrant has been relocated.
Number: 67 Created: 4/7/2005
[4/7/05] STREET NAMES:
Street names shall be verified and reviewed by County / City Planning Dept.
prior to being put in service. 1997 UFC 901.4.5
Acknowledged.
Department: Police Issue Contact: Joseph
Gerdom
Topic: General
Number: 48 Created: 4/5/2005
[4/5/05] Lighting std. calls for min of 1.Ofc in parking and drive areas -
especially important at intersections where pedestrian and vehicle issues
arise. Walkways require min of 0.5fc.
Acknowledged. All interior walkways are lighted.
Number: 54 Created: 4/6/2005
[4/6/05] The Natural Habitats and Features Buffer Zone for spring creek will
be required to be restored to Fort Collins native plant material. 3.4.(C),
3.4.1(E)(1)(g)
Acknowledged.
Number: 55 Created: 4/6/2005.
[4/6/05] This project will need to comply with 3.4.1 (1)(1) and (2).
Acknowledged.
Number: 56 Created: 4/6/2005
[4/6/05] Proof of Compliance, section 3.4.1 (0)(1) and, (2) will also apply.
3.4.1 (0)(1) if utility installation, such as Stormwater out falls need to be
installed in to Spring Creek. 3.4.1 (0)(2) a letter from the USFWS or the US
Army Corp stating that there no concerns with Preble's Meadows Jumping
Mouse, Ute ladies' -tresses orchids, and the Colorado Butterfly Plant.
Department: PFA Issue Contact: Michael Chavez
Topic: General
Number: 64 Created: 4/7/2005
[4/7/05] REQUIRED ACCESS:
A fire lane is required. The fire lane shall be visible by painting and
signage, and maintained unobstructed. 1997 UFC 901.2.2.1; 901.3; 901.4.2;
902.2.1; FCLUC
The criteria for a required fire lane contain several conditions that must be
met.
1. The minimum width shall be 20 feet.
2. Inside turning radius shall be 25 feet and outside turning radius shall
be 50 feet.
3. Compacted road base shall be used during the construction phase
only. The permanent fire lane shall consist of asphalt or concrete and shall
be required to support 40 tons
4. The fire lane shall be platted as an "Emergency Access Easement" on
the final plat.
Acknowledged.
Number: 65 Created: 4/7/2005
/ [4/7/05] PREMISES IDENTIFICATION: Approved numerals or addresses
shall be provided for all new and existing building in such a position as to
be plainly visible and legible from the street or road fronting the property.
1997 UFC 901.4.4
A. In Multi -story buildings the following requirements shall pertain.
1. The first floor units shall be designated with 100's.
Number: 10 Created: 4/5/2005
[4/5/05]Electric facilities may be installed in alleys, but only with proper
clearances between other underground utilities. If there is no curb a
protected area must be provided for transformers and vaults.
Acknowledged.
Number: 11 Created: 4/5/2005
[4/5/05] Light and Power will install streetlights along public roadways.
Other site lighting is not usually installed in the ROW. Please contact Light
& Power if you plan to install lighting in the ROW.
Acknowledged.
Department: Natural Resources Issue Contact: Doug Moore
Topic: General
Number: 24 Created: 4/5/2005
[4/5/05] Some existing trees are shown as being removed. Tim Buchanan
needs to be contacted to see if these trees can be removed and if so if
mitigation will be required. If tree mitigation is required please label the
mitigated tree appropriately. Mitigation trees are in addition to the
standards landscaping required.
Sandy McFeron met with Tim Buchanan on April 12, 2005 at the site to inspect
the trees. A separate landscape sheet will be added to the set to show all
mitigated trees per Tim Buchanan's requirements.
Number: 52 Created: 4/6/2005
[4/6/05] Ecological Characterization Study will be required with next
submittal. Submittal will not be accepted without a completed study.
The Ecological Characterization Study is completed and being submitted.with the
revised plans.
Number: 53 Created: 4/6/2005
[4/6/05] NRD staff doesn't support encroachment in to the 100' Natural
Habitat and Feature Buffer Zone for Spring Creek.
The site plan has been revise so there will be no buildings encroaching into the
buffer zone.
Number: 63 Created: 4/6/2005
[4/6/05] From Technical Services: Many lots are not locatable.
Lots should now be locatable.
Topic: Soils Report
Number: 72 Created: 4/8/2005
[4/8/05] From Pavement Management: Need swell tests in the preliminary
soils report. Please provide an updated soils report with the next
submittal.
A completed soils reporte is being submitted with the revised plans.
Topic: Utility
Number: 37 Created: 4/5/2005
[4/5/05] Only one typical street section was provided. There are several
street sections proposed (emergency, ultimate Hull and interim Hull) and
they each must have their own typical street section.
All typical street cross sections have been added to the utility plan cover sheet.
Number: 38 Created: 4/5/2005
[4/5/05] Remove "PDP" from the project title.
Removed.
Number: 44 Created: 4/5/2005
[4/5/05] Please provide the access ramps and sidewalk shown on the Site
plan.
Provided.
Number: 46 Created: 4/5/2005
[4/5/05] Show existing features for a minimum of 150' of the property
boundaries.
Existing features within 150' of the property have been added.
Department: Light & Power Issue Contact: Alan Rutz
Topic:. Utility
Number: 9 Created: 4/5/2005
[4/5105] Electric lines are installed between.the curb and the sidewalk
along public streets. Electric facilities are not installed in rear lot areas.
The majority of this design does not fit these criteria.
Acknowledged.
Topic: Landscape Plans
Number: 73 Created: 4/8/2005
[4/8105] Remove the contour lines.
Contours will be turned off for final compliance.
s
Topic: Plan and Profiles
Number: 43 Created: 4/5/2005
[4/5/05] Need to dimension crosspans. Local streets require 6' crosspans
and Collectors require 8' min.
Crosspans are dimensioned on the plan and profile sheets.
Number: 45 Created: 4/5/2005
[4/5/05] Final compliance - station all driveways where vertical curb is
used.
Acknowledged.
Topic: Plat
Number: 59 Created: 4/6/2005
[4/6/05] From Technical Services: Legal description is incomplete.
Legal description has been revised.
Number: 60 Created: 4/6/2005
[4/6105] From Technical Services: ROW for Hull Street plus additional 9'
UE is required for the ultimate and possibly the interim. Will need to
dedicate a public access easement for the sidewalk along the south
property line and possibly for the temp road if it does not fall within the
existing row.
Tract C is a utility easement. An 8' public access easement has been placed
where the sidewalk is not within the ROW.
Number: 61 Created: 4/6/2005
[4/6/05] From Technical Services: Locate easements and show geometry.
Easements are located and geometry is now shown.
Number:. 62 Created: 4/6/2005
[416/05] Number lots consecutively 1-45 (better than blocks and lots).
Lots have been renumbered.
Number: 39 Created: 4/5/2005
[4/5/05] Please provide a signature block for the ditch company on both
the landscape and utility plans. If they have an easement that you are
vacating with this plat, then they'll have to sign the plat as well.
A signature block has been provided for the ditch company on the utility plan
cover sheet and the landscape plan. No existing easements have been located.
Number: 42 Created: 4/5/2005
[4/5/05] See Doug Moore regarding tree buffer requirements and other
natural resource requirements.
Acknowledged.
Number: 47 Created: 4/5/2005
[415/05] High volume driveways must be a minimum of 150' from a local
street intersection. -The driveway closest to Trailway Drive is proposed at
only 120' and will require a variance prepared in accordance with 1.9.4 of
LCUASS.
Per the Transportation Impact Study dated March 9, 2005, these driveways are
not high volume. Matt Delich has reviewed the revised plan and does not believe
the driveways will be high volume even with the increased units. Therefore, we .
anticipate that no variance will be required.
Number: 50 Created: 4/5/2005
[4/5/05] Local street curb returns must be 20' radii.
Local street curb returns have been adjusted to reflect 20' radii.
Number: 58 Created: 4/6/2005
[4/6/05] The proposed driveways do not meet the standards set forth in
Chapter 9 of LCUASS. Chances are the utility coordination will change the
overall layout and those changes will either require a change to the product
or fewer of whats proposed. Those changes may change the driveway
placement and eliminate this comment.
Acknowledged.
Topic: Grading
I Number: 40 Created: 4/5/2005
[4/5/05] Contours must extend a minimum of 50' offsite and proposed must
tie into existing.
All contours tie into existing contours. Contours extend a minimum of 50' offsite.
Number: 33 Created: 4/5/2005
[4/5/05] This development is responsible for both the interim and ultimate
design of Hull Street as well as a preliminary design for Hull all the way to
Swallow. A total of 76' of row plus a 9' utility easement has to be dedicated
now to accommodate the future minor collector. The ultimate design has
to realign the driveway to the west so that it intersects with the future Hull
at a 90 degree angle (plus or minus 10 degrees) for a minimum of 25'. The
ultimate design also has to show how the driveway to the east will tie into
the future Hull and provide an access for the existing house off the
driveway. The existing house off Hull may not have a driveway access into
the ultimate Hull. Rather than having the developer build the ultimate Hull
at this time, money in the form of a contribution in aid will be required. An
estimate must be submitted for the City's review and approval during Final
Compliance and that amount will be written into the development
agreement. This amount must be paid prior to the issuance of the
Development Construction Permit.
Acknowledged.
Number: 34 Created: 4/5/2005
[4/5/05] An offsite 100' temporary cul-de-sac must be provided in order to
pull building permits for lots 1 and 2. If this is not desired, than no building
permits for lot 1 and 2 can be issued until the property to the west develops
and eliminates the dead end condition.
Acknowledged. Applicant would like to discuss this item with the City in further
detail.
Number: 35 Created: 4/5/2005
[4/5/05] A 15' radius is required for all high volume driveways accessing a
local or collector street. See LCUASS 8.2.9 for curb return radii
requirements.
Per the Transportation Impact Study date March 9, 2005, these driveways are
not high volume. Matt Delich has reviewed the revised plan and does not believe
the driveways will be high volume even with the increased units.
Number: 36 Created: 4/5/2005
[4/5/05] Please provide a sidewalk along the south side of the property for
the entire frontage.
A sidewalk what been provided. Reference revised site plan.
Number: 20 Created: 4/5/2005
[4/5/05] Will need a utility coordination meeting prior to your next
submittal. Sidewalks are shown over the gas and electric and there are
numerous other conflicts. Please call me at 221-6605 to schedule one.
A utility coordination meeting was held on April 20th and utility conflicts Were
resolved.
Number: 21 Created: 4/5/2005
[4/5/05] All offsite grading will require a grading easement. All offsite
utility work on private property will require a utility and drainage easement.
A letter of intent will be required from the effected property owner prior to
scheduling the public hearing. The actual easements will have to provided
during Final Compliance. Same applies for the offsite row.
No offsite grading has been proposed with this project.
Number: 28 C reated: ' 4/5/2005
[4/5105] See Appendix E6 for scanning requirements.
Acknowledged.
Number: 29 Created: 4/5/2005
[4/5/05] How will these units be addressed? Has PFA seen this layout and
agreed to it? Do the sliding glass doors on the garage side meeting.their
emergency access requirements? Please see PFA as soon as possible.
Linda Ripley and Sandy McFeron met with Ron Gonzales from PFA on April 27
to address these comments. Mr. Gonzales reviewed the new revised layout. He
commented that the sliding doors located on the garage side of the units are
acceptable to PFA. He also mentioned to make sure we have adequate turning
radii within the alleys. JR engineering has run the Auto Turn program to insure
the project will have the required turning radius. Mr. Gonzales also offered
suggestions to how the interior units may be addressed.
Number: 30 . Created: 4/5/2005
[4/5/05] This development is proposing 24' wide drive aisles and does not
meet the minimum 28' required width when serving more than.12 units.
The 28' drive width is. now incorporated into the driveways serving the alleys.
Number: 32 Created: 4/5/2005
[4/5/05] The plan sets do not present the same information.
Acknowledged.
u
NFtiplgyASSOCIATES [NO
Landscape Architecture Urban Design Planning
May 11, 2005
Mr. Ted Shepard
Fort Collins Planning Department
281 North College Avenue
Fort Collins, CO 80524
Spring Creek Ranch — TYPE I
Response to staff Project Review comments
Dear Mr. Shepard,
We have reviewed the staff letter dated April 12, 2005 and have the following
comments: Please note the site plan and building plan have been completely
redesigned since conceptual review.
ITEM: 88 Townhome Units located on Hull Drive, east of Taft Hill Road.
COMMENTS:
Department: Engineering Issue Contact: Susan Joy
Topic: Erosion Control
Number: 41 Created: 4/5/2005
[4/5/05] See Bob Zakely for specific notes and requirements.
Erosion control calculations will be included during final compliance.
Topic: General
Number: 19 Created: 4/5/2005
[4/5/05] Street names do not match from plan set to plan set.
Plan sets have been coordinated. Streets name match on all sets.