Loading...
HomeMy WebLinkAboutHARMONY OAKS - FDP - 17-05A - CORRESPONDENCE -Department: Stormwater-Water-Wastewater Issue Contact: Wes Lamarque Topic: Stormwater Number: 34 Created: 8/19/2005 [11/30/051 A structural design for the retaining wall taller than 4 feet is required at building permit as stated on the plans. Please note this on the site plan as well. Also, please revise notes pertaining to the retaining wall as redlined on sheet 6 of the plan set. [8/19/05] The retaining wall on the north side of the site will need to be completely within the property, including and footings, unless an easement is obtained from the property to the north. At final design, the retaining wall will need to be structural designed due to the wall being taller than 4 feet from bottom of footing to top of wall. Number: 41 Created: 11 /30/2005 [11/30/05] Please state the variances for the release rate and freeboard of the detention pond in the drainage report. Number: 42 Created: 11 /30/2005 [11/30/05] Please provide a drainage easement for the storm sewer on the plat. Number: 43 Created: 11 /30/2005 [11/30/05] Please revise emergency overflow spillway calculation. See drainage report. Number: 44 Created: 11 /30/2005 [11/30/05] Please see comments regarding water quality outlet structure on sheet 7. There will be no need for another round of forma review for the next submittal. Instead, please contact Marc Virata, Engineering and Wes Lemarque, Stormwater directly with revised prints prior to bringing in signed mylars. Be sure and return all of your redlined plans when you re -submit. If you have any questions regarding these issues or any other issues related to this project, please feel free to call me at (970) 221-6750. Sincerely: Ted Shepard Chief Planner Page 2 STAFF PROJECT REVIEW City of Fort Collins CITYSCAPE URBAN DESIGN Date: 12/05/2005 CHRIS WHITTED 3555 STANFORD ROAD, SUITE 105 FORT COLLINS, CO 80525 Staff has reviewed your submittal for HARMONY OAKS PDP AND FINAL PLANS, 608 E HARMONY RD, TYPE II, and we offer the following comments: ISSUES: Department: Engineering Issue Contact: Marc Virata Topic: Plat Number: 49 Created: 11 /30/2005 [11/30105] Technical Services notes the following: 1. Legal and boundary close. 2. Interior easement line is not tied to anything to locate. Topic: Site Plan Number: 46 Created: 11/30/2005 [11/30/05] Remove the phrase "by others" regarding the retaining wall. "By others" implies someone other than the developer or someone working for the developer. Topic: Utility plans Number: 47 Created: 11 /30/2005 [11/30/05] Remove "City Engineer" from the approval block that has outside City utilities listed (REA, Xcel, etc). Number: 48 Created: 11 /30/2005 [11/30/05] It is the developer (developer's engineer, etc.) responsibility to obtain signatures on the construction plan mylars for the entities outside of the City requiring signature (Xcel, FCLWD, etc.) All outside entity signatures must be obtained prior to submittal to the City for signature. Number: 50 Created: 12/2/2005 [12/2/05] Add to the list of approved variances the 9' utility easement along Harmony Road (instead of the 15' normally required). Department: Transportation Planning Issue Contact: David Averill Topic: General Number: 40 Created: 11 /29/2005 [11/29/05] No further comments. Please route future submittals. Thanks. Department: Stormwater-Water-Wastewater Issue Contact: Roger Buffington Topic: General Number: 45 Created: 11 /30/2005 [11/30/05] No further comments. Page 1