HomeMy WebLinkAboutHARMONY OAKS - FDP - 17-05A - CORRESPONDENCE -Department: Stormwater-Water-Wastewater Issue Contact: Wes Lamarque
Topic: Stormwater
Number: 34 Created: 8/19/2005
[11/30/051 A structural design for the retaining wall taller than 4 feet is required at building
permit as stated on the plans. Please note this on the site plan as well.
Also, please revise notes pertaining to the retaining wall as redlined on sheet 6 of the plan
set.
[8/19/05] The retaining wall on the north side of the site will need to be completely within the
property, including and footings, unless an easement is obtained from the property to the
north. At final design, the retaining wall will need to be structural designed due to the wall
being taller than 4 feet from bottom of footing to top of wall.
Number: 41 Created: 11 /30/2005
[11/30/05] Please state the variances for the release rate and freeboard of the detention
pond in the drainage report.
Number: 42 Created: 11 /30/2005
[11/30/05] Please provide a drainage easement for the storm sewer on the plat.
Number: 43 Created: 11 /30/2005
[11/30/05] Please revise emergency overflow spillway calculation. See drainage report.
Number: 44 Created: 11 /30/2005
[11/30/05] Please see comments regarding water quality outlet structure on sheet 7.
There will be no need for another round of forma review for the next submittal. Instead,
please contact Marc Virata, Engineering and Wes Lemarque, Stormwater directly with
revised prints prior to bringing in signed mylars.
Be sure and return all of your redlined plans when you re -submit.
If you have any questions regarding these issues or any other issues related to this project,
please feel free to call me at (970) 221-6750.
Sincerely:
Ted Shepard
Chief Planner
Page 2
STAFF PROJECT REVIEW
City of Fort Collins
CITYSCAPE URBAN DESIGN Date: 12/05/2005
CHRIS WHITTED
3555 STANFORD ROAD, SUITE 105
FORT COLLINS, CO 80525
Staff has reviewed your submittal for HARMONY OAKS PDP AND FINAL PLANS, 608 E
HARMONY RD, TYPE II, and we offer the following comments:
ISSUES:
Department: Engineering Issue Contact: Marc Virata
Topic: Plat
Number: 49 Created: 11 /30/2005
[11/30105] Technical Services notes the following:
1. Legal and boundary close.
2. Interior easement line is not tied to anything to locate.
Topic: Site Plan
Number: 46 Created: 11/30/2005
[11/30/05] Remove the phrase "by others" regarding the retaining wall. "By others" implies
someone other than the developer or someone working for the developer.
Topic: Utility plans
Number: 47 Created: 11 /30/2005
[11/30/05] Remove "City Engineer" from the approval block that has outside City utilities
listed (REA, Xcel, etc).
Number: 48 Created: 11 /30/2005
[11/30/05] It is the developer (developer's engineer, etc.) responsibility to obtain signatures
on the construction plan mylars for the entities outside of the City requiring signature (Xcel,
FCLWD, etc.) All outside entity signatures must be obtained prior to submittal to the City for
signature.
Number: 50 Created: 12/2/2005
[12/2/05] Add to the list of approved variances the 9' utility easement along Harmony Road
(instead of the 15' normally required).
Department: Transportation Planning Issue Contact: David Averill
Topic: General
Number: 40 Created: 11 /29/2005
[11/29/05] No further comments. Please route future submittals. Thanks.
Department: Stormwater-Water-Wastewater Issue Contact: Roger Buffington
Topic: General
Number: 45 Created: 11 /30/2005
[11/30/05] No further comments.