HomeMy WebLinkAboutHARMONY OAKS - FDP - 17-05A - CORRESPONDENCE - REVISIONSNumber:41 Created:11/30/2005 [11/30/05] Please state the variances for the release rate and freeboard of the detention pond in the drainage report. The variances have been requested in the drainage report. Number:42 Created:11/30/2005 [11/30/05] Please provide a drainage easement for the storm sewer on the plat. Please refer to the revised plat. Number:43 Created:11/30/2005 [11/30/05] Please revise emergency overflow spillway calculation. See drainage report. The spillway calculation has been revised. Number:44 Created:11/30/2005 [11/30/05] Please see comments regarding water quality outlet structure on sheet 7. So noted. Thank you. All redlines received have been included with this review set. If you have any questions please feel free to call me. Sincerely, Chris Whitted Cityscape Urban Design, Inc. Page 3 Number:48 Created:11/30/2005 [11/30/05] It is the developer (developer's engineer, etc.) responsibility to obtain signatures on the construction plan mylars for the entities outside of the City requiring signature (Xcel, FCLWD, etc.) All outside entity signatures must be obtained prior to submittal to the City for signature. So noted. Thank you. Outside utility reviewer signatures will be obtained prior to submitting the mylars to the City for signature and recordation. Number:50 Created:12/2/2005 [12/2/05] Add to the list of approved variances the 9' utility easement along Harmony Road (instead of the 15' normally required). The variance has been added to the list on the general notes. Department: Transportation Planning Issue Contact: David Averill Topic: General Number:40 Created:11/29/2005 [11/29/05] No further comments. Please route future submittals. Thanks. So noted. Thank you. Department: Stormwater-Water-Wastewaterlssue Contact: Roger Buffington Topic: General Number:45 Created:11/30/2005 [11/30/05] No further comments. So noted. Thank you. Department: Stormwater-Water-Wastewaterlssue Contact: Wes Lamarque Topic: Stormwater Number:34 Created:8/19/2005 [11/30/05] A structural design for the retaining wall taller than 4 feet is required at building permit as stated on the plans. Please note this on the site plan as well. Also, please revise notes pertaining to the retaining wall as redlined on sheet 6 of the plan set. A note has been added to the site plan and the notes on sheet 6 of the engineering plans have been revised as requested. [8/19/051 The retaining wall on the north side of the site will need to be completely within the property, including and footings, unless an easement is obtained from the property to the north. At final design, the retaining wall will need to be structural designed due to the wall being taller than 4 feet from bottom of footing to top of wall. The retaining wall was moved away from the property line to accommodate the footings on site. Page 2 3555 Stanford Road, Suite ro5 Fort Collins, Colorado 80525 Phone: (970) 226-4074 Fax:(970) 226-4196 February 28`", 2005�o www.cityscapeud.com e(d)citysca peud. com Ted Shepard City of Fort Collins Community Planning and Environmental Services P.O. Box 580 Fort Collins, CO 80522 RE: Harmony Oaks — Response to Second Round PDP Comments Dear Ted, Included below are the comments received from City Staff on December 5", 2005 for the first round Final Compliance Plan review of the Harmony Oaks office building. An explanation (in italics) of how issues have been addressed follows each comment. The project received a decision of 'approval' at the September 15, 2005 Planning and Zoning Board Hearing. ISSUES: Department: Engineering Issue Contact: Marc Virata Topic: Plat Number:49 Created:11/30/2005 111/30/05] Technical Services notes the following: 1. Legal and boundary close. 2. Interior easement line is not tied to anything to locate. So noted. Thank you. The plat has been revised such that the interior easement line is now locatable. Topic: Site Plan Number:46 Created:11/30/2005 [11/30/05] Remove the phrase "by others" regarding the retaining wall. "By others" implies someone other than the developer or someone working for the developer. The note has been modified/removed. Topic: Utility plans Number:47 Created:11/30/2005 [11/30/051 Remove "City Engineer" from the approval block that has outside City utilities listed (REA, Xcel, etc). While it does not appear on this plan set, the correction has been made and will appear on the final mylars. Page 1