HomeMy WebLinkAboutHARMONY OAKS - PDP - 17-05 - CORRESPONDENCE - (4)Number: 7 Created: 4/13/2005
[4/13/05] Is the land use to the east residential? If so, please see section
3.2.1(E)(4)(b) regarding screening parking lots from adjacent uses
Comments from Current Planning are on three redline sheets.
Be sure and return all of your redlined plans when you re -submit.
If you have any questions regarding these issues or any other issues related to this
project, please feel free to call me at (970) 221-6750.
Sincerely -
Ted Shepard
Chief Planner
Page 6
connectivity requirements for Pedestrian LOS. There are a number of options
available - including: a). Building the ultimate sidewalk in concrete, b). Building an
interim asphalt connection c). Escrowing the money for the improvement to be done
at some point in the future, or d). Providing a contribution in aid so that the
improvement can be built at a later date. Since this is a considered an offsite
improvement on private property, choosing options a, c, or d will make this applicant
eligible for a repay from the adjacent property owner at such time as the parcel to
the east re -develops. Option b, construction of the interim asphalt connection, will
not be eligible for repay.
I understand that there is some utility infrastructure in this area, I simply want to start
the discussion on this item at this point in the process.
Department: Water Wastewater Issue Contact: Jeff Hill
Topic: General
Number: 22 Created: 4/26/2005
[4/26/05] Label size of the existing stub in the existing sanitary sewer manhole.
Label size of proposed sanitary sewer service (max 6-inch).
Number: 23 Created: 4/26/2005
[4/26/05] Provide copy of off site utility easement for the sanitary sewer service for
our review.
Number: 24 Created: 4/26/2005
[4/26/05] Include the standard sewer bedding detail on the detail sheet.
See site, landscape and utility plans for other comments.
Department: Zoning Issue Contact: Jenny Nuckols
Topic: Zoning
Number: 3 Created: 4/13/2005
[4/13/05] NOTE: One of the handicap spaces needs to be signed as "Van
Accessible"
Number: 4 Created: 4/13/2005
[4/13/051 Label the building envelope, footprint, note distance to property lines
Number: 5 Created: 4/13/2005
[4/13/05] At the crosswalk at the entrance, please show patterned concrete or
striping (Patterned looks nicer)
Number: 6 Created: 4/13/2005
[4/13/05] A shadow analysis will be required. Required on buildings over 40' in
height.
Page 5
D. A clockwise addressing pattern shall be maintained when ever possible.
Number: 16 Created: 4/21 /2005
[4/21/05] WATER SUPPLY: Commercial
No commercial building can be greater then 300 feet from a fire hydrant.
Fire hydrants are required with a maximum spacing of 600 feet along an approved
roadway. Each hydrant must be capable of delivering 1500 gallons of water per
minute at a residual pressure of 20 psi. 1997 UFC 901.2.2.2
Number: 17 Created: 4/21/2005
[4/21/05] SPRINKLER REQUIREMENTS:
This proposed building shall be fire sprinklered.
1997 UFC 1003.2.9
Number: 18 Created: 4/21 /2005
[4/21/05] KNOX BOX:
Poudre Fire Authority requires a "Knox Box" to be mounted on the front of every new
building equipped with a required fire sprinkler system or fire alarm system.
1997 UFC 902.4; PFA POLICY 88-20
Number: 19 Created: 4/21 /2005
[4/21/05] FIRE LINE REQUIREMENT:
Buildings that are required to be fire sprinklered shall have a minimum 6-inch fire line
unless hydraulic calculations can support a smaller fire line.
Department: Stormwater Utility Issue Contact: Wes Lamarque
Topic: Stormwater
Number: 28 Created: 4/29/2005
[4/29/05] This site is in the McClelland's drainage basin with a required detention
pond release rate of .2 cfs/acre for the 10-year storm and .5 cfs/acre for the 100-
year storm. Please revise the release rate for this site.
Number: 29 Created: 4/29/2005
[4/29/05] The outfall for this site needs to be addressed in the drainage report.
Please investigate where the site drainage will outfall to and if any drainage
easements are required. The swale on the north side of the pier apartments is the
destination the site flows needs to drain to.
Department: Transportation Planning Issue Contact: David Averill
Topic: General
Number: 27 Created: 4/27/2005
[4/27/05] This project will need to facilitate an offsite sidewalk improvement to the
east or west, it is the applicants choice, It would seem that going east would be most
favorable for this project as the gap between the existing sidewalk to the east and
the edge of this projects property line is about 40 feet or so. This will satisfy the
Page 4
Department: Light & Power Issue Contact: Doug Martine
Topic: Landscape plan
Number: 1 Created: 4/8/2005
[4/8/05] A streetlight layout drawn on the landscape plan was sent to Ted Shepard
on 4-8-05 via inter -office mail. The planned lights need to be shown on the
landscape plan. The street tree locations will need to be adjusted to provide 40'
clearance between the trees and lights (15' if the tree is an ornamental). Note that
the lights may not be installed initially, until Xcel removes their existing overhead
power line in the area.
Topic: Power
Number: 2 Created: 4/8/2005
[4/8/05] The developer will need to coordinate power requirements and electric
development charges with Light & Power Engineering (221-6700).
Department: PFA Issue Contact: Michael Chavez
Topic: General
Number: 14 Created: 4/21/2005
[4/21/05] REQUIRED ACCESS:
A fire lane is required. The fire lane shall be visible by painting and signage, and
maintained unobstructed. 1997 UFC 901.2.2.1; 901.3; 901.4.2; 902.2.1; FCLUC
The criteria for a required fire lane contain several conditions that must be met.
1. The minimum width shall be 20 feet.
2. Inside turning radius shall be 25 feet and outside turning radius shall be 50 feet.
3. Compacted road base shall be used during the construction phase only. The
permanent fire lane shall consist of asphalt or concrete and shall be required to
support 40 tons
4. The fire lane shall be platted as an "Emergency Access Easement" on the final
plat.
Buildings three stories or more in height must have access to a 30 foot unobstructed
access roadway on at least (1) one side for aerial operations. PFA Policy 85-5 (B)
Number: 15 Created: 4/21 /2005
[4/21/05] PREMISES IDENTIFICATION: Approved numerals or addresses shall be
provided for all new and existing building in such a position as to be plainly visible
and legible from the street or road fronting the property. 1997 UFC 901.4.4
A. In Multi -story buildings the following requirements shall pertain.
1. The first floor units shall be designated with 100's.
2. The second floor units with 200's
3. The third floor units with 300's, and so forth.
B. All brass letters and numerals shall be posted on a black background.
C. Some multi -family layouts may require address postings from the back side as
well as
the front of the buildings.
Page 3
Number: 20 Created: 4/25/2005
[4/25/05] It is anticipated that Harmony Road will soon be a City road and no longer
a State Highway. Until that time, however, the City will not be able to approve plans
showing improvements (or lack thereof) to Harmony that are not to State standards.
If for some reason Harmony Road remains a State Highway, quite a few additional
items will need to be addressed.
The City could take the project to Hearing with the condition that if Harmony remains
a State highway, then the site will need to be redesigned as needed to meet State
standards (drainage, access design, A -line process, etc.). Final approval of the
project, however, will not take place until either the road changes hands and the City
takes ownership of it, or it is decided that the road stays in the State's hands and the
condition of approval is met.
Number: 21 Created: 4/25/2005
[4/25/05] Please provide a public access easement along the west side of the
property to accommodate future shared access with property(ies) to the west.
Number: 25 Created: 4/26/2005
[4/26/05] Please see redlines and utility plan checklist for additional items.
Number: 32 Created: 4/29/2005
[4/29/05] Please note that the access shown on these plans as full -movement on
Harmony will, in the future, become right in/right out at a minimum, or it might
possibly be eliminated in conformance with the Harmony Road Access Control Plan.
This will be noted in the project's Development Agreement.
Topic: Utility plans
Number: 12 Created: 4/17/2005
[4/17/05] Please show existing features for min. 150' offsite (per LCUASS). Need to
see how the proposed site plan fits in context.
Number: 13 Created: 4/17/2005
[4/17/05] Please provide grade numbers on proposed grade lines, and make the
existing grade lines/numbers legible.
Number: 30 Created: 4/29/2005
[4/29/05] Please underground any exiting overhead utilities per LUC 3.3.2D(7)
Number: 31 Created: 4/29/2005
[4/29/05] Please list access spacing from public streets as an approved engineering
variance in the utility plan general notes.
Page 2
STAFF PROJECT REVIEW
Gtyof Fort Collins
CITYSCAPE URBAN DESIGN Date: 05/05/2005
JOE CARTER
3555 STANFORD ROAD, SUITE 105
FORT COLLINS, CO 80525
Staff has reviewed your submittal for HARMONY OAKS PDP, 608 E HARMONY
RD, TYPE II, and we offer the following comments:
ISSUES:
Department: Engineering Issue Contact: Katie Moore
Topic: General
Number: 8 Created: 4/17/2005
[4/17/05] Emergency access easement radius and width requirements are set forth
under the LUC. Adjacent to buildings 3+ stories tall, the EAE should be 30' wide.
Curve radii should be min. 25' interior, 50' exterior, measured from the same
centerpoint.
Number: 9 Created: 4/17/2005
[4/17/05] 1 am unsure as to why the Developer was under the impression that ROW
dedication on Harmony would not be required with this project. My indication from
Eric Bracke is that his previous comments to the Developer were that he did not
anticipate that this development should have to dedicate ROW in excess of that
dedicated in front of Home Depot, but that the Developer needed to work with
Engineering to determine the exact requirements. To my knowledge, no contact
was made with the Engineering Department after the discussion with Traffic. This
development needs to determine the existing centerline of Harmony, then dedicate
70.5' of ROW from that point north (this is the same as what Home Depot
dedicated). This development also needs to dedicate a 15' utility easement behind
that ROW. Parking setbacks should be measured from the future flowline (75'
required per LCUASS).
Number: 10 Created: 4/17/2005
[4/17/05] Please note that any retaining wall 4' or taller from bottom of foundation to
top of wall requires a building permit.
Number: 11 Created: 4/17/2005
[4/17/05] A drainage pipe is shown to outlet offsite at the northeast corner of the
property. Since there is no drainage easement there, an offsite easement will be
required. Please provide a letter of intent from the adjacent property owner prior to
scheduling a hearing, and provide the completed easement prior to signing of
mylars.