Loading...
HomeMy WebLinkAboutPETERSEN SUBDIVISION - PDP - 23-05 - CORRESPONDENCE - (3)If you have any questions regarding these issues or any other issues related to this project, please feel free to call me at (970) 221-6750. Sincerely: Ted Shepard Chief Planner Page 2 STAFF PROJECT REVIEW Cityof Fort Collins r® STEWART AND ASSOCIATES Date: 11/07/2005 JACK BLAKE 103 S MELDRUM ST FORT COLLINS, CO 80521 Staff has reviewed your submittal for PETERSEN SUBDIVISION PDP, TYPE I, and we offer the following comments: ISSUES: Department: Engineering Issue Contact: Marc Virata Topic: General Number: 7 Created: 6/3/2005 [10/25/05] Will defer to the various utilities on whether this has been addressed to their satisfaction. [6/3/05] Theā€¢plat needs to provide for utility easements in a width and layout consistent with criteria set forth by the various utilities and coinciding with improvements as constructed. Number: 9 Created: 6/3/2005 [10/25/05] Technical Services offers the following comments with this submittal: 1. Boundary and legal close 2. Add note to Stormwater (unrecorded easement), "to be dedicated by this plat". 3. What monumentation was found to determine Mason right-of-way? [6/3/05] Technical Services offers the following comments: 1. Boundary & legal close 2. How was the right-of-way determined on Mason Street? 3. Title is wrong, replace "subdivision" with "plaza". 4. How does Lot 2 get service for utilities? 5. It would be helpful if the adjoiner were identified by parcel number. 6. Does the stormwater detention easement on file with the City have a reception number or location? Department: Water Utilities Issue Contact: Jeff Hill Topic: General Number: 4 Created: 5/27/2005 [10/25/05] ( Repeat comment. Information not received.) [5/27/05] Provide information regarding location of water/sewer services to the west building and check to see that the services are within an adequate utility easement on the plat. Be sure and return all of your redlined plans when you re -submit. Page 1