HomeMy WebLinkAboutBELLE CLAIRE, 310 S. COLLEGE AVE. - FDP - 26-05/A - CORRESPONDENCE -Department: Stormwater-Water-Wastewaterlssue Contact: Roger Buffington Topic: Landscape Number: 86 Created: 12/7/2005 [12/7/05] Show all water/sewer mains in streets adjacent to site and maintain landscape separation distances. Department: Stormwater-Water-Wastewaterlssue Contact: Wes Lamarque Topic: Stormwater Number: 44 Created: 6/14/2005 [12/9/05] Repeat Comment [9/21/05] REPEAT COMMENT [6/14/05] Basin 01 drainage will increase from existing to developed conditions, which will result in increased flows onto Highway 287. CDOT normally does not allow increased flows onto their highways. The increase of .3 cfs is small, but approval by CDOT would be required for this increase. Basin 1 also now drains onto CDOT right-of-way and would need their approval as well. Number: 93 Created: 12/9/2005 [12/9/05] The proposed storm sewers in Olive Street need to have manholes at the _ connections to the existing 60-inch. We need to discuss options, because it would be undesirable to have two manholes within 30-feet. Number: 94 Created: 12/9/2005 [12/9/05] A detail of the storm sewer connection is required once the best option is determined. Number: 95 Created: 12/9/2005 [12/9/05] Please see other comments on the redlined plans. Department: Stormwater-Water-Wastewaterlssue Contact: Roger Buffington Topic: Water/Wastewater Number: 84 Created: 12/7/2005 [12/7/05] Sand & oil interceptor shown on Sht 5 not included on Sht 8. Explain. Number: 85 Created: 12/7/2005 [12/7/05] See utility plans for other comments. Number: 87 Created: 12/7/2005 [12/7/05] As previously requested by Jeff Hill, provide fire flow requirements for the fire sprinkler system so that adequacy of distribution system can be checked. Be sure and return all of your redlined plans when you re -submit. If you have any questions regarding these issues or any other issues related to this project, please feel free to call me at (970) 221-6750. Page 4 Number: 73 Created: 12/6/2005 [12/6/051 Note #3 on existing conditions is unnecessary. Please turn on all necessary layers and remove the note from all sheets. Number: 74 Created: 12/6/2005 [12/6/05] Provide typical dimensions for parking on the overall utility plan and site plan. Number: 75 Created: 12/6/2005 [12/6/05] Existing utility line types do not match what is shown in legend. Number: 76 Created: 12/6/2005 [12/6/05] Please provide details and design info for perimeter drains and any retaining walls. Also, provide a construction detail for the flood gate. Number: 77 Created: 12/6/2005 [12/6/05] Note asphalt to be removed and replaced on overall utility plan. Number: 78 Created: 12/6/2005 [12/6/05] Add note: alley entrance to be reconstructed per standard drawing #803. Number: 80 Created: 12/6/2005 [12/6/05] Our inspectors will need to see a pavement design for the alley, likely need thicker than 6" due to heavy trucks that may use the alley. (Doesn't need to go on the plans). Number: 81 Created: 12/6/2005 [12/6/05] We need to see additional cross -sections in order to determine if cross slopes are acceptable. Number: 82 Created: 12/6/2005 [12/6/05] Add standard drawing #707 (high volume driveway access) to your detail sheet. Number: 83 Created: 12/6/2005 [12/6/05] Additional minor changes, labels and dimensions as indicated on redlines. Department: Stormwater-Water-Wastewaterlssue Contact: Wes Lamarque Topic: Erosion/Sediment Control Number: 89 Created: 12/9/2005 [12/9/05] 1.Please schedule a brief meeting with Bob Zakely to review the sediment/erosion control plan. Page 3 walls, planter boxes, etc in the ROW will also be required to have an encroachment permit. Fees for the permit will be determined after approval of the project. Number: 36 Created: 6/14/2005 [12/6/051 A hydrologic study still required.. [9/21/05] Please provide more information about the subdrains. The city does not allow subdrains in public rights of way and it appears that there is a proposed exterior perimeter drain. Still need the hydrologic study. [6/14/05] Are subdrains proposed with this project? If so, a hydrologic study may be needed per LCUASS. Department: Engineering Issue Contact: Dan DeLaughter Topic: General Number: 91 Created: 12/9/2005 [12/9/05] Have you thought about the construction staging for this project? Just something to keep in mind as you finalize the plans. Department: Engineering Issue Contact: Katie Moore Topic: Pavement Number: 22 Created: 6/14/2005 [12/5/05] [9/20/05] Just keeping this comment alive until FC. [6/14/05] Rick Richter has commented that Olive Street is less than 5 years old. This means that street cut fees for Olive will be triple the normal rate. Department: Engineering Issue Contact: Susan Joy Topic: Plat Number: 65 Created: 9/27/2005 [12/6/05] [9/27/05] Please provide the sight distance note. Department: Engineering Issue Contact: Dan DeLaughter Topic: Technical Services Number: 88 Created: 12/7/2005 [12/7/05] From Technical Services: 1. 'Boundary Closes." 2. 'Basis of bearing statement does not match the monumentation shown." Topic: Utility plans Number: 71 Created: 12/6/2005 [12/6/05] Cover: add line for engineer signature after note 2. Number: 72 Created: 12/6/2005 [12/6/05] Reference the nearest 2 benchmarks, currently only referencing 1. Page 2 STAFF PROJECT REVIEW Citv of Fort Collins VF RIPLEY ASSOCIATES Date: 12/13/2005 CATHY MATHIS 401 W. MOUNTAIN AVE, SUITE 201 FORT COLLINS, CO 80521 Staff has reviewed your submittal for BELLE CLAIRE PDP AND FINAL PLANS, 310 S. COLLEGE (OLD TOWN LOFTS) - TYPE II I, and we offer the following comments: ISSUES: Department: Engineering Issue Contact: Dan DeLaughter Topic: Alley Number: 90 Created: 12/9/2005 [12/9/05] Please show more detail on the portion of alley being cut across Olive to the north. Include a blow-up of the area with spot elevations, show curb and gutter, pans, etc., and show the materials (concrete or asphalt). The street portion can be replaced with asphalt, but the alley portion must be concrete. Number: 92 Created: 12/9/2005 [12/9/05] Typical alley section must match what is proposed. Please provide 3 alley cross -sections on the plans: at 2+25, 3+00, and the south edge of the property line. Also, provide a spot at the lip of gutter on Olive, and a centerline profile of the alley across Olive to the north where the street is being cut, in addition to other detail requested in that location. Department: Engineering Issue Contact: Katie Moore Topic: General Number: 20 Created: 6/14/2005 [12/5/05] [9/20/05] Just keeping this comment alive until F.C. [6/14/05] College Avenue is a state highway, and as such, CDOT regulations must be followed for construction within that ROW and drainage onto the highway. CDOT has indicated that retaining walls and/or stairs are not permitted within the ROW. Planter boxes would be ok with a permit; closing the access on College will require a permit (free for removal) that would also cover the other work within the ROW. Please discuss drainage issues with CDOT, as well as the proposed relocation of the light pole and associated curbing to the center of College Avenue, to see what CDOT will allow. Number: 23 Created: 6/14/2005 [12/5/05] [9/20/05] Just keeping this comment alive until FC. [6/14/05] All eaves/balconies/awnings/etc that encroach into either the College or Olive ROW will require an approved encroachment permit from the City. Retaining Page 1