HomeMy WebLinkAboutBELLE CLAIRE, 310 S. COLLEGE AVE. - FDP - 26-05/A - SUBMITTAL DOCUMENTS - ROUND 1 - ROUTING SHEETR_ \a1.,
\ FINAL PLAN ROUTING SHEET
Item: CV_ X r2 �,%I rNc+x �?V� 6a
This project went to / has been scheduled for Public Hearing on C F�
CI;RRR&\T PLN'!iIPIG
The following table lists final plan submittal requirements for this project.
A final fee of $1,000.00 is required at the time of submittal unless otherwise waived or reduced.
Fee Waiver/Re uct' Appro al: Amount: Date:
Planner: Engineer: _Sy So 7:S7 1
Building Inspection
Engineering avement
Light & Power
Poudre Fire Authority
Stormwater
Street Oversizing
Traffic Qperations�_
r.1 •
Water & Wastewater
■ ■