Loading...
HomeMy WebLinkAboutBELLE CLAIRE, 310 S. COLLEGE AVE. - FDP - 26-05/A - SUBMITTAL DOCUMENTS - ROUND 1 - ROUTING SHEETR_ \a1., \ FINAL PLAN ROUTING SHEET Item: CV_ X r2 �,%I rNc+x �?V� 6a This project went to / has been scheduled for Public Hearing on C F� CI;RRR&\T PLN'!iIPIG The following table lists final plan submittal requirements for this project. A final fee of $1,000.00 is required at the time of submittal unless otherwise waived or reduced. Fee Waiver/Re uct' Appro al: Amount: Date: Planner: Engineer: _Sy So 7:S7 1 Building Inspection Engineering avement Light & Power Poudre Fire Authority Stormwater Street Oversizing Traffic Qperations�_ r.1 • Water & Wastewater ■ ■