HomeMy WebLinkAboutBELLE CLAIRE, 310 S. COLLEGE AVE. - FDP - 26-05/A - SUBMITTAL DOCUMENTS - ROUND 1 -Number: 61 Created: 9/21 /2005
[9/21/05] It is noted that the roof drains are routed to the pumped connection to the storm
sewer. The flows from a major storm event will have a significant impact on the pump
sizing. Has this been accounted for in the pump design? Is a duplicate pump being
installed to provide backup in the event of pump failure? Failure of this system could result
in flooding of the underground parking area. Was a gravity connection from the roof drains
to the storm sewer considered?
Department: Zoning Issue Contact: Gary Lopez
Topic: Zoning
Number: 50 Created: 9/20/2005
[9/20/05] no comment
Be sure and return all of your redlined plans when you re -submit
If you have any questions regarding these issues or any other issues related to this project,
please feel free to call me at (970) 221-6750.
Sincerely,
Ted Shepard
City Planner
Page 6
[6/14/05] Basin 01 drainage will increase from existing to developed conditions, which will
result in increased flows onto Highway 287. CDOT normally does not allow increased flows
onto their highways. The increase of .3 cfs is small, but approval by CDOT would be
required for this increase. Basin 1 also now drains onto CDOT right-of-way and would need
their approval as well.
Acknowledged.
Number: 62 Created: 9/23/2005
[9/23/05] After floodplain issues are resolved, Stormwater is ready for the project to go to a
hearing. At final, additional comments may follow.
Department: Water Utilities Issue Contact: Roger Buffington
Topic: Utility plans
Number: 51 Created: 9/21 /2005
[9/21/05] Indicate proposed new location for the existing irrigation service current on SE
corner of College and Olive.
Parks dept. has been contacted for location.
Number: 52 Created: 9/21 /2005
[9/21/05] What is the clear distance between the storm and sanitary at the crossing point in
Olive? What can be done to increase this distance?
0.30', condition discussed with Roger Buffington.
Number: 53 Created: 9/21 /2005
[9/21/05] Show curb stops on the water services.
Added.
Number: 54 Created: 9/21 /2005
[9/21/05] Include water sewer trench details.
Added.
Number: 55 Created: 9/21 /2005
[9/21/05] Meter pit and water service details are outdated. Include current version of these
details.
Updated w/ current details.
Number: 56 Created: 9/21 /2005
[9/21/05] See utility plans for other comments.
Acknowledged.
Number: 58 Created: 9/21 /2005
[9/21/05] Water services and fire line are shown passing between two existing trees.
Trenching in this area may severely damage these trees. Check with City Forester to see if
adequate separation is being provided.
Meetings and drawing approval of proposed layout accepted.
Number: 59 Created: 9/21 /2005
[9/21/05] Will there be a conflict between the water services/fire line and the underground
electric lines?
No.
Page 5
Removed.
Number: 70 Created: 9/27/2005
[9/27/05] Sheet 8 - Are the parking spaces on the north side typical or compact spaces?
Listed as compact on sheet.
Department: Natural Resources
Topic: General
Number: 60
[9/21/051 No issues.
Issue Contact: Doug Moore
Created: 9/21 /2005
Department: Water Utilities Issue Contact: Wes Lamarque
Topic: Floodplain
Number: 57 Created: 9/21 /2005
[9/21/05] 1. Please include additional existing and proposed spot elevations within the
floodway that can be used for comparison to document no -rise. (REPEAT)
Addditional elevations added.
2. The ramp on College Avenue and the wall between the two ramps appears to still be in
the floodway and we suspect includes fill in the floodway. Please review and revise as
necessary to eliminate any fill in the floodway. Please provide additional existing and
proposed elevations to document the no -rise.
There is no wall between the ramps, there will be no fill in floodway, additional elevations
added.
3. Please add a note to the plans and include a note in the drainage report:
- All work in the floodway must beat or below existing ground. A no -rise certification
required before building permit. (REPEAT)
Added.
4. Please delete the part of Floodplain Note 3 that talks about venting of the parking garage.
This does not apply to this property. (REPEAT)
Deleted.
Department: Water Utilities Issue Contact: Jeff Hill
Topic: General
Number: 13 Created: 6/13/2005
[9/21/05] As previously noted, provide fire sprinkler flow requirements.
Acknowledged.
[6/13/05] Provide flow calculations which justify the need for an 8-inch fire line.
Number: 19 Created: 6/14/2005
[9/21/05]
[6/14/051 Maintain the required landscape/utility separation distance on the landscape
plans.
See site, landscape and utility plans for other comments.
Department: Water Utilities
Topic: Stormwater
Number: 44
[9/21/051 REPEAT COMMENT
Issue Contact: Wes Lamarque
Created: 6/14/2005
Page 4
Department: Engineering Issue Contact: Katie Moore
Topic: Pavement
Number: 22 Created: 6/14/2005
[9/20/05] Just keeping this comment alive until FC.
Acknowledged.
[6/14/05] Rick Richter has commented that Olive Street is less than 5 years old. This
means that street cut fees for Olive will be triple the normal rate.
Topic: Plat
Number: 24 Created: 6/14/2005
[9/20/05] 1 am routing a variance request to all applicable utilities and should have an
answer back in two weeks.
[6/14/05] Unless otherwise approved in writing by all applicable utilities, an 8' utility
easement is required along the Alley ROW.
Department: Engineering Issue Contact: Susan Joy
Topic: Plat
Number: 65 Created: 9/27/2005
[9/27/05] Please provide the sight distance note.
Department: Engineering Issue Contact: Katie Moore
Topic: Site
Number: 33 Created: 6/14/2005
[9/20/05] Missing a few dimensions.
Dimensions have been added per redlines.
[6/14/05] On the site plan, please label all sidewalk, parkway, and ROW widths, and parking
stall dimensions.
Department: Engineering Issue Contact: Susan Joy
Topic: Site
Number: 63 Created: 9/27/2005
[9/27/05] Please label the sight distance easement.
Topic: Utility plans
Number: 66 Created: 9/27/2005
[9/27/05] Cover Sheet: Please provide typical street sections for College and Olive.
Added Typical sections.
Number: 67 Created: 9/27/2005
[9/27/05] Cover Sheet: Please make the corrections to the typical alley sections as noted
on the redlines.
Corrected.
Number: 68 Created: 9/27/2005
[9/27/05] Line 48 of the General Notes: Need to add the variance for the sight distance in
addition to the 3' setback if both are approved.
Added.
Number: 69 Created: 9/27/2005
[9/27/05] Sheet 3: Remove note 5. The information you are disclaiming in this note is what
you are basing your design on and what you will eventually sign off on.
Page 3
Number: 27 Created: 6/14/2005
[9/20/05] A variance request will be routed to all applicable utilities and we should have an
answer within two weeks.
Acknowledged.
[6/14/051 Fences/walls must be set back at least 3' from the Alley ROW (LCUASS Figure 7-
11 F). Please relocate the wall currently shown on the edge of the alley ROW.
Number: 28 Created: 6/14/2005
[9/20/05] A variance request was received and will be taken to Transportation Coordination
this Thursday, the 22nd. I will have an answer for you then.
Acknowledged.
[6/14/05] Sight distance is a concern at the two driveway intersections with the alley.
Please redesign the walls adjacent to these driveways to allow drivers to see oncoming
traffic in the alley in both directions.
Number: 30 Created: 6/14/2005
[9/20/05] Just keeping this comment open through Final Compliance.
Tables have been removed from the plans.
[6/14/05] Please remove the dining tables shown on the landscape plan. Approval for
dining areas encroaching in the ROW takes place in a separate encroachment permit
process through the City's Chief Inspector. FYI - The tables shown separately from the
building (the walk would be between the building and the tables) will not be permitted if
alcohol is to be served. Also, if no alcohol is served in that location, only a single row of
tables would be permitted in order to maintain the required clear space. The typical clear
space required is 7' from the fence surrounding the dining area to the edge of walk, but
when there is an obstruction on the other side (a retaining wall/fence/etc) then the distance
required is 9'. Please take this into account when applying for dining area encroachments.
Number: 36 Created: 6/14/2005
[9/21/051 Please provide more information about the subdrains. The city does not allow
subdrains in public rights of way and it appears that there is a proposed exterior perimeter
drain. Still need the hydrologic study.
Subdrains approved in e-mail dated 9-29-05 from City. Need for hydrologic study has not
been determined yet as subdrain system was not a requirement of soils investigation.
Subdrain install is at request of owner.
[6/14/05] Are subdrains proposed with this project? If so, a hydrologic study may be
needed per LCUASS.
Number: 42 Created: 6/14/2005
[9/27/05] The actual grade requirement is 8% max.
Acknowledged.
[6/14/05] The first car -length of the driveway heading to the underground parking area
should be at a grade of approximately 4% to increase visibility and reduce conflicts at the
intersection with the alley.
Department: Engineering Issue Contact: Susan Joy
Topic: Landscape
Number: 64 Created: 9/27/2005
[9/27/05] Please label the sight distance easement and provide the sight distance note.
Done.
Pa,-e 2
STAFF PROJECT REVIEW
City of Fort Collins
VF RIPLEY ASSOCIATES Date: 11/7/2005
CATHY MATHIS
401 W. MOUNTAIN AVE, SUITE 201
FORT COLLINS, CO 80521
Staff has reviewed your submittal for BELLE CLAIRE PDP, 310 S. COLLEGE (OLD TOWN
LOFTS) - TYPE II
I, and we offer the following comments:
ISSUES:
Department: Engineering Issue Contact: Katie Moore
Topic: Alley
Number: 49 Created: 6/17/2005
19/21/05] The plan and profile sheet shows cross slopes exceeding the maximum allowed.
In addition, please show more information to the south so that we can see how your
improvements are tying into the existing.
Added.
[6/17/05] Since the alley is to be re -built, with some alterations, please provide a plan and
profile design of the alley.
Topic: General
Number: 20 Created: 6/14/2005
[9/20/05] Just keeping this comment alive until FC.
Acknowledged.
[6/14/05] College Avenue is a state highway, and as such, CDOT regulations must be
followed for construction within that ROW and drainage onto the highway. CDOT has
indicated that retaining walls and/or stairs are not permitted within the ROW. Planter boxes
would be ok with a permit; closing the access on College will require a permit (free for
removal) that would also cover the other work within the ROW.
Please discuss drainage issues with CDOT, as well as the proposed relocation of the light
pole and associated curbing to the center of College Avenue, to see what CDOT will allow.
Number: 23 Created: 6/14/2005
[9/20/05) Just keeping this comment alive until FC.
Acknowledged.
[6/14/05] All eaves/balconies/awnings/etc that encroach into either the College or Olive
ROW will require an approved encroachment permit from the City. Retaining walls, planter
boxes, etc in the ROW will also be required to have an encroachment permit. Fees for the
permit will be determined after approval of the project.
Number: 25 Created: 6/14/2005
[9/20/05] Please label who owns this easement, all plan sets (City, REA, etc). Final
Compliance.
Added City of Fort Collins as owner.
[6/14/05] A powerline easement is shown on the plat, but does not appear on any of the
other plans. This easement (and all easements) must be shown on the site, landscape, and
utility plans.