HomeMy WebLinkAboutBELLE CLAIRE, 310 S. COLLEGE AVE. - PDP - 26-05 - CORRESPONDENCE -Corrected. More detail is now given in the drainage report.
9. Please show on the plans or include a note that all HVAC will either be elevated or
floodproofed to an elevation of 4993.50.
Corrected.
Drainage Report
10. Please see comments in drainage report and refer to floodplain checklist for required
items.
Acknowledged.
11. Please better describe the location of the building and other site improvements relative
to the floodplain and floodway.
Corrected.
12. Please give a brief description of the floodproofing methods that are planned.
This information is now included in the drainage report.
13. Please give a brief description of how the underground parking will be floodproofed to
meet FEMA Tech. Bull 6-93. Venting is not part of that bulletin. Venting is for attached
garages at grade.
This information is now included in the drainage report.
14. Please give a brief description of how the elevator is going to be designed to meet
FEMA Tech. Bulletin 4-93.
This information is now included in the drainage report
15. Please include a note that all HVAC will either be elevated or floodproofed to an
elevation of 4993.50.
Corrected.
16. Please describe the use of the structure in more detail and include a statement that no
critical facilities as defined in Chapter 10 of City Code will be allowed.
Corrected.
Other requirements
17. A floodplain use permit for the building is required.
Acknowledged
18. A floodplain use permit for the other site work (sidewalk, stairs, etc.) is required.
Ackncvv!eogeo.
19. Floodproofing designs meeting Chapter 10 of City Code and the floodproofing
submittal guidelines is required.
Acknowledges.
20. A pre -construction floodproofing certification is required.
Acknowledged.
21. A post -construction floodproofing certificate is required to obtain a CO.
Acknowledged.
22. See notes above regarding no -rise certification both before and after construction.
Acknowledges.
Page 7
[6115105] Need photometric plan including values under second floor (walkways and
elevator area).
Department: Stormwater Utility Issue Contact: Basil Harridan
Topic: Floodplain
Number: 45 Created: 611412005
[6114105]
Plat
Please show the floodplain line on the plat. Only the floodway line is shown.
2. Please show the floodplain and floodway boundaries on the site plan.
3. Please include a note on the site plan that all tables and chairs in the floodway must be
anchored so as to not float during a flood. Vote added to site plan.
Grading Plans
4. No fill is allowed within the floodway without a technical analysis to show no -rise.
Because the sidewalk area within the floodway is being changed and steps are being
added, a no -rise certification by an engineer is required. This certification is required before
construction as well as at the time of as -built to obtain the CO. Please review the items on
the sidewalk area along College Avenue to determine if there is no increase in ground
elevations over existing (including planter boxes, stairs, etc.). If there are increases in
elevation, a technical analysis by a professional engineer is required to document no -rise.
This analysis may involve hydraulic modeling. Please include additional existing and
proposed spot elevations within the floodway that can be used for comparison. Contact
Marsha Hilmes-Robinson at 224-6036 to obtain the no -rise certification form and to discuss
this issue.
Correctec
5. Please see the floodplain checklist for the notes that should be on the plans, including:
• A floodplain use permit is required before the building permit.
• Floodproofing designs and certification are required before the building permit.
• No -rise certification required before building permit and before CO.
• Floodproofing certificate required before CO.
Corrected.
6. Please show the floodplain line on the plans.
Corrected.
7. Several of the spot elevations for proposed finished floor are below the 4991.5
elevation as stated on the plans. Please review and revise as necessary.
All spot elevations at doorways are for exterior flatwork and are 0.04' (0.5') below finish floor
to account for a 0.04' door threshold; thus after stepping through the door threshold you
would be at finish floor grade. There are some spot elevations on the southwest corner of
the building that are below finish grade but there are no entrances in this area; the
foundation will just be revealed some in this area.
8. Please include notes on the plans for the underground parking and elevator about
meeting FEMA Technical Bulletins 6-93 and 4-93. Please show more detail if possible or
add notes about how underground parking is going to be floodproofed (Ex. flood gate, ramp
with bump, etc.)
Page 6
This proposed building shall be fire sprinklered.
1997 UFC 1003.2.9
Acknewledged
Number: 8 Created. 61612005
[6161051 KNOX BOX:
Poudre Fire Authority requires a "Knox Box" to be mounted on the front of every new
building equipped with a required fire sprinkler system or fire alarm system.
1997 UFC 902.4; PFA POLICY 88-20
Acknowledged.
Number: 9 Created: 61612005
[616105] FIRE LINE REQUIREMENT. -
Buildings that are required to be fire sprinklered shall have a minimum 6-inch fire line unless
hydraulic calculations can support a smaller fire line.
Acknowledged.
Number: 10 Created. 61612005
[616105] STANDPIPE:
A standpipe system shall be required for this project.
Acknowledged.
Number 11 Created: 61612005
[616105] FIRE PUMP:
A fire pump shall be required for this project.
Acknowledged.
Number: 12
Created: 61712005
[6171051 HIGH-RISE BUILDING:
The building height exceeds 75' above the lowest level of fire department vehicle access.
This is defined as a high-rise building.. The following is required:
(1) Temporary Emergency Access
(2) Fire Hydrants
(3) Fire Sprinklers
(4) Standpipes
(5) Public Address System
(6) Automatic Fire Alarm
(7) Fireman Communication System
(8) Fire Pump
(9) Elevator Fireman Operation
(10) Elevator Pressurization
(11) Stairwell Pressurization
(12) Smoke Removal System
(13) Emergency Power
(14) Fire Command Center
These systems are required per. Sections 403, 904and 905 of the 1997 UBC.
Acknowledged.
Department: Police Issue Contact: Joseph Gerdom
Topic: General
Number: 47 Created: 611512005
Page 5
Number. 25 Created. 611412005
[6114105] A powerline easement is shown on the plat, but does not appear on any of the
other plans. This easement (and all easements) must be shown on the site, landscape, and
utility plans.
Corrected.
Number. 26 Created: 611412005
[6114105] Please dedicate ROW at the corner of the alley and Olive Street per LCUASS
Figure 7-1 1F, Detail 2 for sight distance purposes. No structure may be built in this ROW.
A sight distance easement is now provided at this location.
Topic: Utility plans
Number- 35 Created: 611412005
[61141051 The utility plan general notes refer to a generic soils report, but a soils report was
not received.
A soils report is now included with this submittal
Number.- 39 Created: 611412005
[6114105] For the retaining walls shown, please clarify how tall they are, if they are flush with
the adjacent walks, if railings are proposed, etc.
Top of wall and bottom of wall elevations are shown on the grading plans. Fencing on top of
walls is denoted by the fence line type and only occurs on top of the wall adjacent to the
alley. Please See the planner's site plan for more detail on the fencing.
Department: Natural Resources
Topic: General
Number 1
[5130105] No issues at this time.
Acknowledged.
Issue Contact: Doug Moore
Created: 513012005
Department: PFA Issue Contact: Michael Chavez
Topic: General
Number- 5 Created: 61612005
[616105] FIRE LINE REQUIREMENT -
Buildings that are required to be fire sprinklered shall have a minimum 6-inch fire line unless
hydraulic calculations can support a smaller fire line.
Acknowledged.
Number. • 6 Created. 61612005
[616105] WATER SUPPLY. • Commercial
No commercial building can be greater then 300 feet from a fire hydrant.
Fire hydrants are required with a maximum spacing of 600 feet along an approved roadway.
Each hydrant must be capable of delivering 1500 gallons of water per minute at a residual
pressure of 20 psi. 1997 UFC 901.2.2.2
An exhibit has been prepared which shows all hydrants nearby. The closest hydrant is on
the northwest corner of College and Olive, approximately 132' away.
Number. • 7 Created. 61612005
[616105] SPRINKLER REQUIREMENTS:
Page 4
Number: 37 Created: 611412005
[61141051 The overall utility plan is the only plan that shows the underground parking
configuration. Please provide dimensions for parking stalls and drive aisles.
Added to the grading plan for clarity purposes.
Number.• 38 Created: 611412005
[6114105] The alignment and width of the ramps on the corner of College and Oak should
match the access ramps across the street (s).
Corrected.
Number.• 40 Created: 611412005
[6114105] No doors (including trash enclosure doors) may open over ROW. Please
redesign.
The trash enclosure doors are now overhead doors so as not to open in the alley r.o.w.
Number: 41 Created: 611412005
[61141051 The alley apron at Olive should be rebuilt per LCUASS Drawing 803 to catch flows
from the alley and direct them to the inlet.
The alley apron has been redesigned with a trench drain.
Number: 42 Created. 611412005
[61141051 The first car -length of the driveway heading to the underground parking area
should be at a grade of approximately 4 % to increase visibility and reduce conflicts at the
intersection with the alley.
Due to site constraints this is not possible.
Number. 43 Created. 611412005
[6114105] Please see redlines and utility plan checklist for any additional comments.
Acknowledged.
Number. 49 Created: 611712005
[6117105] Since the alley is to be re -built, with some alterations, please provide a plan and
profile design of the alley.
A plan and profile sheet is now included.
Topic: Pavement
Number: 22 Created: 611412005
[6114105] Rick Richter has commented that Olive Street is less than 5 years old. This
means that street cut fees for Olive will be triple the normal rate.
Acknowledged.
Topic: Plat
Number: 24 Created: 611412005
[6114105] Unless otherwise approved in writing by all applicable utilities, an 8' utility
easement is required along the Alley ROW.
Per discussions with Jeff Hill 813105 this easement will not be required due to the fact that
there is a below grade wall that extends deeper than the sewer line (for the below grade
parking) adjacent to this alley. Thus if excavation occurred there would be risk of
undermining the building foundation.
Page 3
Number: 29 Created: 611412005
[6114105] The driveway widths need to meet the minimums in LCUASS: 28' for multifamily
serving 12 or more units, 24' for commercial uses. Will any of the surface parking be used
for the residences? If so, both driveways should be 28' wide.
The surface parking will be used only for the commercial uses. All of the residential parking
will be provided below -grade. The drive for the underground parking has been widened to
28'.
Number: 30 Created: 611412005
[6114105] Please remove the dining tables shown on the landscape plan. Approval for
dining areas encroaching in the ROW takes place in a separate encroachment permit
process through the City's Chief Inspector. FYI - The tables shown separately from the
building (the walk would be between the building and the tables) will not be permitted if
alcohol is to be served. Also, if no alcohol is served in that location, only a single row of
tables would be permitted in order to maintain the required clear space. The typical clear
space required is T from the fence surrounding the dining area to the edge of walk, but
when there is an obstruction on the other side (a retaining wall/fence%tc) then the distance
required is 9'. Please take this into account when applying for dining area encroachments.
OK. The dining tables have been removed from the landscape plan.
Number: 31 Created: 611412005
[6114105] The width of the walk on the northeast portion of the site should be widened to 9'
(see comment 30).
The walk his been widened to 8' per meeting with engineering staff.
Number: 32 Created: 611412005
[6114105] Of the attached walks proposed along Olive and College, please remove them
from the plans except for the two following locations: Along College from the south edge of
the site to where the bumpout begins, and along Olive where the attached walk is
approximately 6-T wide. The 3' section on Olive will be useless with the cars overhanging
the curb when parked, and the two walks along the bumpout don't seem to serve much
purpose, and would place pedestrians right next to traveling vehicles, which is what we want
to avoid.
Corrected.
Number: 33 Created. 611412005
[6114105] On the site plan, please label all sidewalk, parkway, and ROW widths, and parking
stall dimensions.
Corrected.
Number: 34 Created: 611412005
[6114105] The walkway from the ground -level parking north to Olive seems narrow at 3.5'.
Can this be widened?
Due to site constraints this walk cannot be widened but it is proposed at 4' wide
Number: 36 Created: 611412005
[61141051 Are subdrains proposed with this project? If so, a hydrologic study may be
needed per LCUASS.
The soils report indicates ground water is not a concern thus subdrains are not required,
however the client would like them added as a safety measure, they are now shown on the
utility plan.
Page 2
STAFF PROJECT REVIEW
VF RIPLEY ASSOCIATES Date: 0810112005
CATHY MATHS
401 W. MOUNTAIN AVE, SUITE 201
FORT COLLINS, CO 80521
Staff has reviewed your submittal for BELLE CLAIRE PDP (310 S. COLLEGE) - TYPE Il,
and we offer the following comments:
ISSUES:
Department: Engineering
Topic: General
Number: 20
Issue Contact: Katie Moore
Created: 611412005
[6114105] College Avenue is a state highway, and as such, CDOT regulations must be
followed for construction within that ROW and drainage onto the highway. CDOT has
indicated that retaining walls and/or staris are not permitted within the ROW. Planter boxes
would be ok with a permit, closing the access on College will require a permit (free for
removal) that would also cover the other work within the ROW.
Please discuss drainage issues with CDOT, as well as the proposed relocation of the light
pole and associated curbing to the center of College Avenue, to see what CDOT will allow.
A permit application has been filled out in order to close this access. The light pole is no
longer being relocated.
Number- 21
Created: 611412005
[6114105] Please remove the landscaping layer from the utility plans.
Done.
Number.- 23 Created: 611412005
[6114105] All eaves/balconies/awnings/etc that encroach into either the College or Olive
ROW will require an approved encroachment permit from the City. Retaining walls, planter
boxes, etc in the ROW will also be required to have an encroachment permit. Fees for the
permit will be determined after approval of the project.
The contractor will provide an encroachment permit at the time of building permit.
Number. • 27 Created. 611412005
[6114105] Fences/walls must be set back at least 3' from the Alley ROW (LCUASS Figure 7-
11 F). Please relocate the wall currently shown on the edge of the alley ROW.
A variance request has been submitted.
Number. • 28
Created: 611412005
[6114105] Sight distance is a concern at the two driveway intersections with the alley.
Please redesign the walls adjacent to these driveways to allow drivers to see oncoming
traffic in the alley in both directions.
Page 1
[6114105] Provide a 15 foot utility easement on the west side of the existing sanitary sewer
main. Include a note to core drill all openings into the existing sanitary sewer manholes.
Per discussions with Jeff Hill 813105 this easement will not be required due to the fact that
there is a below grade wall that extends deeper than the sewer line (for the below grade
parking) adjacent to this alley. Thus if excavation occurred there would be risk of
undermining the building foundation.
Number.- 18 Created: 611412005
[61141051 Include all appropriate utility details (see utility plans detail sheet for the list).
Corrected.
Number.- 19 Created. 611412005
[6114105] Maintain the required landscape/utility separation distance on the landscape
plans. See site, landscape and utility plans for other comments.
We have removed any shrubs in the area where the services are coming into the site from
Olive. There is groundcover only.
Topic: Zoning
Number. • 2 Created: 61212005
[612105] Indicate bldg. dimensions and distances to property lines on site plan.
Done.
Number: 3 Created: 61212005
Entry to underground parking requires some form of landscaping buffer between it and lot 2.
Can something be done there such as cascading juniper over wall/omamenta/ trees or
similar "urban" landscape treatment to avoid a masonry wall by itself? Lets get creative.
This is a tough area to put landscape in. First of all. there are horizontal constraints
between the wall, the sidewalk. the existing trees and the Perkins building. The wall along
the walkway will only be 3 or 4 feet high and will have a decorative wrought iron railing on
top. There are also columns to help break it up.
Be sure and return all of your redlined plans when you re -submit.
If you have any questions regarding these issues or any other issues related to this project,
please feel free to call me at (970) 221-6750.
Page 9
Department: Stormwater Utility Issue Contact: Wes Lamarque
Topic: Stormwater
Number: 44 Created: 611412005
[6114105] Basin 01 drainage will increase from existing to developed conditions, which will
result in increased flows onto Highway 287. CDOT normally does not allow increased flows
onto their highways. The increase of .3 cfs is small, but approval by CDOT would be
required for this increase. Basin 1 also now drains onto CDOT right-of-way and would need
their approval as well.
CDOT has bee;, co �tacted: they have requested a drainage a report which DMW will send'
with this resubmittal.
Number: 46 Created: 611512005
[6115105] The alley flow in basin 03 needs to be analyzed to determine water surface
elevation in order to see if the underground parking entrance will work. Depending on the
flow, the entrance may need to be raised. Flow from part of basin 03, all of basin 4 need to
be included in the flow calculation.
An alley way flow calculation has been added to the drainage report, the I00yr flow width is
19. 1 ' wide and the alley is 20' wide, thus no flow will enter the parking garage.
Number.' 48 Created: 611712005
[6117105] The underground parking water collection and pump system should outlet to the
sanitary sewer and not the storm sewer. Water quality is the reason. In order for this to
happen no area draining to the sanitary sewer can be exposed to the sky resulting in storm
drainage to enter. If part of the ramp down to the underground parking is exposed, that area
will need to drain to the storm sewer.
Corrected
Department: Water Wastewater Issue Contact: Jeff Hill
Topic: General
Number.- 13 Created: 611312005
[6113105] Provide flow calculations which justify the need for an 8-inch fire line.
Number: 14 Created: 611312005
[6113105] Maintain 4 feet of separation between Meter pits/curb stops and electric mains,
gas mains, and all permanent structures (i.e retaining walls, trash enclosures, etc.).
Corrected.
Number. 15 Created: 611412005
[61141051 Maintain 10 feet of separation between sanitary sewer main and storm
sewer/inlet.
Ccrrected
Number: 16 Created: 611412005
[6114105] Our records indicate an existing water service on the north west portion of this
site. All existing water and sewer service must be used or abandoned at the main.
After h rtner researcn tnis tap has been founo to be a City evvr,ed irrigation tap The meter
pit and valve will be relocated at the developers expense
Number: 17
Created: 611412005
Pate 8