Loading...
HomeMy WebLinkAbout210-212 W. MAGNOLIA ST., URBAN LIVING LOFTS - PDP - 24-05 - CORRESPONDENCE - REVISIONS (5)The 8-inch water line is shown on sheet PDP-002 and utility plans. Number: 23 Created: 5/31/2005 [5/31/051 Our records indicate an existing 3/4-inch water service to this site. Show and label both proposed and existing curb stops/meter pits and maintain a 2 foot clear separation between pits. Maintain a 4 foot clear separation between meter pits/curb stops and all other permanent structures. The existing and proposed water service are shown on sheet PDP-003 and utility plans. Number: 24 Created: 5/31/2005 [5/31/051 Show and label location of existing gas main. The location of existing gas main is shown on sheet PDP-003 and utility plans. Number: 25 Created: 5/31/2006 [5/31/05] Show and label location of existing and proposed water and sewer lines on the landscape plans. Include the standard landscape/utility separation notes on the landscape plans. All water and sewer lines are shown on sheet PDP-003. Number: 26 Created: 5/31/2005 [5/31/05] Will a grease interceptor be needed for the commercial portion of this project? There will be no kitchen or etc. in the commercial portion that would require a grease interceptor. Number: 27 Created: 5/31/2005 [5/31/05] See site, landscape and utility plans for other comments. Department: Zoning Issue Contact: Jenny Nuckols Topic: Zoning Number: 11 Created: 5/24/2005 [5/24/051 Please show and label the building envelope, building dimensions and distances to property lines All key dimensions are shown on sheet PDP-003. Number: 12 Created: 5/24/2005 [5/24/051 The site plan needs to note the breakdown of commerical space to residential space. How many residential units, how many bedrooms per unit, how many parking spaces are alloted for comm and for residential. The breakdown is shown on sheet PDP-001 PDP-003. Number: 13 Created: 5/24/2005 [5/24/05] Is there going to be a trash dumpsten Please note on the site plan or comment in General Notes as to how trash and recyclables will be handled. There is a Trash Dumpster noted and location shown on PDP-003. Number: 14 Created: 5/24/2005 [5/24/05] A shadow analysis will be required Please find the October through March shadow analysis shown on PDP-002. Number: 15 Created: 5/24/2005 [5/24/051 Add one more street tree along Magnolia An additional Street tree has been added and is shown on PDP-003. Number: 16 Created: 5/24/2005 [5/24/051 Add a note to the landscape notes regarding installation of landscaping prior to the issuance of a certificate of occupancy Note has been added on sheet PDP-003. Page 6 not directed to the alley or the street, off -site drainage easements will be required. All roof drainage is ultimately directed at the private drive and on to the street. The roof drain locations and under walk drains are shown on sheet PDP-002. Number: 30 Created: 5/31/2005 [5/31/05] Please explain in the report where the alley drains. Is the 4-inch pipe in a sump location adequate? Is the pipe private or public? The private 4" pipe at the private drive runs under the south portion of the Edwards property then daylights on to the street at their western property line. Currently this condition is not adequate. The development will redirect half of the alley to a new trench that will run under the sidewalk and onto Magnolia as shown on 1210112-003. Topic: Floodplain Number: 28 Created: 5/31/2005 [5/31/05] Floodplain Comments: 1. Please see 50% and 100% Floodplain checklists for items to be included on plans and in the drainage report. 2. Please include floodplain boundary on site plan and grading plan. The very northern portion of the property is in the moderate risk 100-year floodplain whereas the rest of the site is in the high risk 100-year floodplain. 3. The letter from Northstar contains incorrect information about the level of floodproofing. Please review and revise. See suggestions. 4. On site plan and grading notes, please indicate actual elevations that the structure must be floodproofed to. 5. See checklist for necessary notes on plans about floodplain use permit requirement and floodproofing certificate for CO. 6. Benchmark #2 is listed incorrectly. It should be 4992.21. Please review and revise as necessary. 7. The floor elevation seems a little high compared to the City's topo and a visual inspection of the site. Please review survey information again to verify the existing floor elevation. 8. Please see conceptual review notes and Section 10-38 of City Code for detailed requirements related to the floodproofing design. All floodproofing design work and a floodproofing certificate is required prior to issuance of a building permit. 9. A floodplain use permit and $25 permit fee are required prior to issuance of the building permit. 10. A post -construction floodproofing certificate is required prior to the issuance of the Certificate of Occupancy. Department: Transportation Planning Issue Contact: David Averill Topic: General Number: 32 Created: 6/1/2005 [6/1/05] Transportation planning and Parking Services (Randy Hensley) request that one of the diagonal parking spaces in front of this project be signed as designated handicap parking. It seems that the stall furthest to the west would be the most logical location for this conversion. We also request that one of the walkways leading to the curb be converted to a ramp to facilitate handicap access from the parking. The stall farthest to the west will be deleted and curb marked in red for emergency access. The next stall shall be marked and sized appropriately for handicap van access. The widened and modified entry drive shall serve as an access ramp as shown on sheet PDP-003. Department: Water Wastewater Issue Contact: Jeff Hill Topic: General Number: 21 Created: 5/31/2005 [5/31/051 Show and label location of existing sanitary sewer service and define if it is to be used or abandoned. All sanitary sewer is shown on sheet PDP-003 and utility plans Number: 22 Created: 5/31/2005 [5/31/05] Place the proposed fire line in Magnolia and increase the size to 8-inch (see utility plans for alignment and appurtenances). A meeting is needed to discuss the relaying of the existing 4-inch water main. Please contact Jeff Hill or Roger Buffington to schedule a meeting at 221-6674 or 221-6854 respectively. Page 5 amount under the 2-year storm or provide an under -walk drain for that water. The drainage from the private drive will flow to under walk drains which are shown on sheet PDP-003. Department: Light & Power Issue Contact: Doug Martine Topic: Electric utility Number: 17 Created: 5/26/2005 [5/26/05] The developer will need to coordinate power requirements, a location for a pad type transformer, and electric development charges with Light & Power Engineering (970)221-6700. Urban Living Concepts has met with Doug Martine and has received pad location and size as shown on PDP-003. Department: Natural Resources Issue Contact: Doug Moore Topic: General Number: 19 Created: 5/30/2005 [5/30/05] 3.2.5 Trash and Recycling Enclosures needs to be met. Plans need to show location and details of the enclosure. Refer to http://www.fcgov.com/recycling/enclosures.php for more information and to download the City of Fort Collins Guidance Document, Trash and Recycling Enclosures - Design Considerations, August 2004. The trash enclosure wil be enclosed and screened from public view. The enclosure will be constructed of the same durable materials, since it is enclosed within the structure to which it is associated. Gates on the enclosures shall be constructed of metal and will be painted to match other metal work of the project. Enclosure areas will be constructed on a concrete pad. Gates will be positioned to swing clear of the enclosure's front width. Gate pins will be installed to hold gates open for integrity and safety. the requirements set by the City of Fort Collins. Topic: Landscape Plan Number: 20 Created: 5/30/2005 [5/30/051 Contact the City Forester Tim Buchanan, at (970) 221-6361, to see if existing trees will be allowed to be removed and if so what mitigation will be required. If existing trees are to be preserved, the tree protection notes will need to be included in the plans and a Limits of Development, 3.4.1 (N)(1) will need to be shown on all relevant plans(example: grading, utilities, Landscape, etc.). Please find attached letter in response issued by Urban Living Concepts and the details shown on PDP-003 Department: PFA Issue Contact: Michael Chavez Topic: General Number: 39-44 Please find attached Meeting Memorandum by JCL and signed by Mike Chavez. Number: 45 Created: 6/2/2005 [6/2/05] STANDPIPE SYSTEM & FIRE PUMP: A standpipe system with a fire pump shall be required for this project. Flow Fire has met with PFA and are designing the standpipe and fire pump system. Department: Police Issue Contact: Joseph Gerdom Topic: Electric utility Number: 18 Created: 5/27/2005 [5/27/051 LUC calls for 1.Ofc for building surrounds. Need at least 1.0 fc at alley and lighting in parking area should provided 1.Ofc. At least 1.0 FC is provided and prefered by the nieghbors who share the private drive. A photometric plot with a light loss factors is shown on PDP-005 Department: Stormwater Utility Issue Contact: Wes Lamarque Topic: Drainage Number: 29 Created: 5/31/2005 [5/31/05] Please document and show the roof drain locations on the grading plan. Where do these roof drains oufall to and is there adequate conveyance without negatively impacting adjacent properties? If roof drains are Page 4 Number: 3 Created: 5/18/2005 [5/18/05] Please clearly show the building envelope on all plans. This envelope should include all eaves/balconies/footers/etc, and none of these areas should extend past the property boundaries or into the easements. The building envelope as been clarified on all plans showing eaves/ balconies/ footers which do not extend past the property boundaries. On the west face a variance is requested to permit the building eaves to encroach into the private drive, utility, drainage, and emergency access easement. The eaves are located at a height of 25' and above. Please find the attached letter approved by Poudre Fire Authority for use when the owner formerly requests the variance. Number: 4 Created: 5/18/2005 [5/18/05] Silt fencing is proposed outside of the property boundaries - please provide a letter of intent from the neighboring property owners stating that they intend to dedicate an easement for that silt fence. Please provide a letter of intent for the fence removal offsite, as well as a letter of intent from the bank for the utility easement for the fire line. We know that the Developer intends to obtain easements, but what we really need to know is that the neighbors intend to grant them, and the neighbors need to sign the letter(s). Please find attached letter of intent issued by Urban Living Concepts, a legal agreement is currently being drafted and will be submitted upon sign off by First National Bank. Number: 5 Created: 5/18/2005 [5/18/05] Please label the existing ROW width on Magnolia, parkway width, and sidewalk width on all plans The exiting ROW, parkway, and sidewalk width lines have been identified on all sheets. Number: 6 Created: 5/18/2005 [5/18/05] The site plan and narrative state that the sidewalk on Magnolia will be widened, but this is inconsistent with the utility plans. The sidewalk is sufficiently wide to meet City standards, and there is no requirement to widen it, but it can be widened if the Developer wishes. The plans need to be consistent, though. The exiting sidewalk width will remain the same and is shown consistent on all sheets. Number: 7 Created: 5/18/2005 [5/18/051 Existing and proposed utility locations should be shown on the landscape plans to ensure proper separations. The exiting and proposed utility locations are shown on sheet PDP-003. Number: 8 Created: 5/18/2005 [5/18105] Please provide a detailed plan showing the parking layout with stall and drive aisle dimensions. The parking layout with stall and isle dimensions are shown on sheet PDP-003. Number: 9 Created: 5/18/2005 [5/18/05) Where will the roof drains come down, and where will the water drain? Are under -walk drains needed? The roof drain locations and under walk drains are shown on sheet PDP-002. Number: 10 Created: 5/18/2005 [5/18/05] Please see redlines and ufility plan checklist for additional comments. Drawings have been corrected according to redlines and comments. Number: 46 Created: 6/6/2005 [6/6/05] LCUASS requires a minimum 28' driveway for at least a car length from the curb and gutter, for the use proposed. The exiting 14' private drive will be widened to 16.5' as shown on sheet PDP-003. We request a modification to the adopted code. Number: 47 Created: 6/6/2005 [6/6/05] Please show that the drainage from the private drive that would flow over the public walk would be an Page 3 the adopted code. The Parking Design Parameters described by the AIA Architectural Graphic Standards recommend an aisle width of 18'-5"for single lane traffic. We have provided 19'-2" throughout. Please find the graphic turning radius of a standard passenger car on sheet PDP-003. Number: 52 Created: 6/6/2005 [6/6/05] You need to provide 2 handicap parking spaces near the elevator. Where is the elevator? Label both. One handicap spot needs to be van accessible. I've drawn a typical solution on your site plan. We have provided 1 handicap stall adjacent the elevator which is shown and labeled as well as one van accessible spot along the diagonal parking of Magnolia Street represented on sheet PDP-003. Number: 53 Created: 6/6/2005 [616/05] Show parking info on the site plan as well as the cover sheet. Parking Info is shown on both PDP-001 as well as PDP-003 Number: 54 Created: 6/6/2005 [6/6/05] Relabel PDP-003 Site a andscape Plan and Details. PDP-003 has been rel ed Site and Landscape Plan and Details. Number: 55 Created: 6/6/2005 [6/6/05] Show roof and balcony ov angs on your site plan. Roof and balcony over gs are shown on PDP-003 represented by a dashed overhead line. Number: 56 Created: 6/6/2005 [6/6/05] Maximum height for a Type I review is 56'. Your roof is shown exceeding that amount. Either reduce the overall height to 56' or we'll need to change this to a Type II review. The overall roof height has been reduced and none of the building exceeds a height of 56' as shown on PDP-004. Number: 57 Created: 6/6/2005 [6/6/05] Show lighting in the parking lot on your photometric plot. A photometric plot for the parking area lighting is shown on PDP-005 Number: 58 Created: 6/6/2005 [6/6/05] Recalculate photometrics with a light loss factor (LLF) of 1.0. A photometric plot with a light loss factor of 1.0 at the property line is shown on PDP-005 Number: 59 Created: 6/6/2005 [6/6/05] Thank you for using fully shielded fixtures. You are welcome. Department: Engineering Issue Contact: Katie Moore Topic: General Number: 1 Created: 5/18/2005 [5/18/05] The western property line shown is inconsistent between the site/landscape plans and the utility plans. Please determine which is correct, and use this line on all plan sets. The western property line has been corrected and is consistent on all sheets Number: 2 Created: 5/18/2005 [5/18/05] Please re -label that the area that was formerly alley ROW is now a private drive, as well as a utility, drainage, and emergency access easement. Noted on the Edwards House plans is that there is also a 14' private access easement for the drive. Please provide a copy of that easement. The former alley ROW has been re -labeled as a private drive, utility, drainage, and emergency access easement. A copy of the Edwards easement is attached. Page 2 RESPONSE TO: STAFF PROJECT REVIEW Ann Aspen City Planner Current Planning Department FORT COLLINS, CO 80524 Date: 06/26/2005 Please find in bold our response to the Staff comments dated 06/06/05 for 210-212 W. MAGNOLIA ST., URBAN LIVING LOFTS AT MAGNOLIA ST. PDP, TYPE I. ISSUES STATED: Department: Current Planning Issue Contact: Anne Aspen Topic: General Number: 33 Created: 6/1 /2005 [6/1/05] The following departments or agencies have indicated that they have no problems or concerns with the project: Park Planning, Water Conservation, and Streets. Number: 34 Created: 6/1 /2005 [6/1/05] The following departments or agencies have indicated that they have problems or concerns with the project: Building Inspection and the Post Office. Their comments will be returned to you with your redlines. Building inspection has reviewed construction type and separations and we have incorporated all their comments. The Post Office has provided their mailbox requirements which will be incorporated in the area shown on sheet PDP-003. Number: 35 Created: 6/1 /2005 [6/1/05] The land use breakdown data is not legible. Please fix. Land use breakdown is corrected and is shown on PDP-001 Number: 36 Created: 6/1/2005 [6/1/05] The cover sheet needs to have a signature block for the Director of Current Planning. I emailed you a sample. Thank you for the sample, we placed the signature block on PDP-001 Number:37 ' Created:6/1/2005 [6/1/05] See redlines for further comments. Please return redlines when you resubmit. Drawings have been corrected according to redlines and comments. Number: 48 Created: 6/6/2005 [6/6/05] Please show the parking lifts on your site plan and include a detail on them showing how they work. Parking lifts and details is shown on PDP-003 Number: 49 Created: 6/6/2005 [6/6/05] There are some CAD Ilea nd clarification issues on your site plan. Make the building footprint bolder and eliminate or label a eous lines. Label all dimensions. CAD cleanup and Plfcation corrected on all PDP sheets. Number: 50 Created: 6/6/2005 [6/6/05] Clearly show how pedestrians and bicyclists will use this parking area. How do bike riders get from the racks to their loft? How do pedestrians get from their loft to the street sidewalk safely? Pedestrian and cyclists paths are shown on PDP-003 Number: 51 Created: 6/6/2005 [6/6/05] The parking dimensions are a is and in some cases do not meet code. Please fix. Parking dimensions have n corrected to code and lift specifications and may be found on PDP-003. As the required lane dimensions we request a modification to Page 1